|
 |
 |
 |
 |
 |
Plan Review Details - Permit 19100442
Plan Review Stops For Permit 19100442 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2019-11-12 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-11-12 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-11-12 |
Time |
11:24 |
Sent To |
|
|
Notes |
2019-11-12 11:31:09 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING REVIEW APPROVED WITH PROVISOS: | | | | 1. A SEPERATE ROOF PERMIT WILL BE REQUIRED PRIOR TO | | ROOF WORK. | | 2. TRUSS ENGINEERING SIGNED AND SEALED BY TRUSS | | ENGINEER WILL BE REQUIRED FOR FIELD INSPECTOR. | | 3. THE ENTRY GATE SHOP DRAWINGS REVIEW STAMPED AND | | SIGNED BY DESIGNER OF RECORD ARE REQUIRED FOR FIELD | | INSPECTOR. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2019-10-21 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-10-21 |
Time |
15:39 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-10-21 |
Time |
15:39 |
Sent To |
|
|
Notes |
2019-10-21 16:12:34 | ***CORRECTIONS*** | | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING REVIEW DENIED: | | | | 1. FBC B 107.2.1 & CITY OF WPB AMENDMENT 107.2.1.1, | | PROVIDE REVIEW STAMPED AND SIGNED PRODUCT APPROVALS FOR | | ROOFING MATERIALS INCLUDING UNDERLAYMENT, TILE, & TILE | | ADHESIVE. | | 2. FBC R 703.7.3 PROVIDE A CLARIFICATION ON STUCCO | | NOTES THAT WILL INCLUDE A WATER RESISTIVE VAPOR BARRIER | | IN ADDITION TO THE PAPER BACKED LATH. | | | | NOTES: | | | | 1. A SEPERATE ROOF PERMIT WILL BE REQUIRED PRIOR TO | | ROOF WORK. | | 2. TRUSS ENGINEERING SIGNED AND SEALED BY TRUSS | | ENGINEER WILL BE REQUIRED FOR FIELD INSPECTOR. | | 3. THE ENTRY GATE SHOP DRAWINGS REVIEW STAMPED AND | | SIGNED BY DESIGNER OF RECORD ARE REQUIRED FOR FIELD | | INSPECTOR. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2019-11-12 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-11-12 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-11-04 |
Time |
11:15 |
Sent To |
|
|
Notes |
2019-11-05 11:15:57 | RESUB ROUTED TO PVALENTI |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2019-10-21 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-10-21 |
Time |
16:12 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-10-09 |
Time |
11:37 |
Sent To |
|
|
Notes |
2019-10-10 11:37:40 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2020-01-16 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-01-16 |
Time |
09:33 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-01-16 |
Time |
09:32 |
Sent To |
|
|
Notes |
2020-01-16 09:33:56 | ADDED ROOFING REVIEW. PRODUCT APPROVALS ISSUED WITH | | MASTER. CT |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2019-10-11 |
|
|
Cont ID |
|
Sent By |
rfalcone |
Date |
2019-10-11 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
rfalcone |
Date |
2019-10-11 |
Time |
11:00 |
Sent To |
B |
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |