Plan Review Details - Permit 19091100
Plan Review Stops For Permit 19091100
Review Stop G GAS REVIEW
Rev No 2 Status F Date 2020-01-03 Cont ID  
Sent By tklarge Date 2020-01-03 Time 04:40 Rev Time 0.00
Received By tklarge Date 2020-01-02 Time 06:36 Sent To  
Notes
2020-01-02 11:20:551) INDICATE THE DELIVERY PRESSURE ( PSI ) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3
 THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3.2ND
 REQUEST.
 2 ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3. SECOND REQUEST.
 3) SUBMIT A SITE PLAN THAT SHOWS THE LOCATION OF THE
 POOL HEATER IN RELATION TO BUILDING OPENINGS (SOFFITS)
 AND OPERABLE DOORS AND WINDOWS. THE POOL HEATER EXHAUST
 SHALL BE LOCATED PER THE POOL HEATER INSTALLATION
 MANUAL.SECOND REQUEST.
 4) THE POOL HEATER SHALL HAVE A THERMAL EFFICIENCY
 RATING OF 82% PER THE 2017 FBC-ENERGY SEC.
 R403.10.4.THE SUBMITTED SPECIFICATIONS FOR THE POOL
 HEATER DO NOT SHOW THIS REQUIREMENT. SUBMIT POOL HEATER
 SPECS THAT SHOW THE REQUIRED THERMAL EFFICIENCY. THE
 SPECS ARE NOT ON FILE WITH THE CITY.
 5) INDICATE ON THE GAS RISER DRAWING IF ANY PIPE WILL
 BE INSTALLED UNDERGROUND AND IF SO, NOTE THE TYPE OF
 PIPING ON THE GAS RISER. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-10-02 Cont ID  
Sent By tklarge Date 2019-10-02 Time 06:47 Rev Time 0.00
Received By tklarge Date 2019-10-02 Time 06:28 Sent To  
Notes
2019-10-02 06:47:071) ONE OF THE GAS PLANS HAS BEEN DRAWN IN PENCIL.
 PENCIL IS NOT AN ACCEPTABLE FORMAT. SUBMIT TWO COPIES O
 A GAS DRAWN IN A NON - ERASABLE FORMAT. WPB AMEND. TO
 FBC SEC. 107.1.
 2) THE PERMIT APPLICATION DESRCIBES THE SCOPE OF WORK
 AS INSTALLING A GAS LINE TO A POOL HEATER BUT THE GAS
 DRAWING SHOWS A GENERATOR. CLARIFY.
 3) SUBMIT TWO COPIES OF AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE
 PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2017
 FBC-R SEC. G2413.4.1, G2413.4.2.
 4) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO
 FBC SEC. 107.2.1.
 5) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
 6) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
 7) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3
 THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3.
 8) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 9) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
 10) SUBMIT A SITE PLAN THAT SHOWS THE LOCATION OF THE
 POOL HEATER IN RELATION TO BUILDING OPENINGS (SOFFITS)
 AND OPERABLE DOORS AND WINDOWS. THE POOL HEATER EXHAUST
 SHALL BE LOCATED PER THE POOL HEATER INSTALLATION
 MANUAL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-03 Cont ID  
Sent By tklarge Date 2020-01-03 Time 04:40 Rev Time 0.00
Received By tklarge Date 2019-12-27 Time 13:19 Sent To  
Notes
2019-12-27 13:19:27RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-02 Cont ID  
Sent By tklarge Date 2019-10-02 Time 06:47 Rev Time 0.00
Received By tklarge Date 2019-09-26 Time 13:47 Sent To  
Notes
2019-09-27 13:47:26PLUMB <5K