Plan Review Details - Permit 19091010
Plan Review Stops For Permit 19091010
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-10-16 Cont ID  
Sent By jleahy Date 2019-10-16 Time 10:33 Rev Time 0.00
Received By jleahy Date 2019-10-16 Time 10:33 Sent To  
Notes
2019-10-16 10:34:17PAPER WORK IN PACKAGE FOR EXISTING SLAB JLEAHY

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-10-02 Cont ID  
Sent By rmcdouga Date 2019-10-02 Time 16:38 Rev Time 0.00
Received By rmcdouga Date 2019-10-02 Time 16:38 Sent To I
Notes
2019-10-02 16:49:25PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR. FBC 107.2.1
  
 2) SUBMIT GENERATOR PAD AND GENERATOR TO PAD ANCHORING
 DETAILS. FBC 107.2.1 & R301.1

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-10-16 Cont ID  
Sent By jleahy Date 2019-10-16 Time 10:34 Rev Time 0.00
Received By jleahy Date 2019-10-16 Time 10:34 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-10-01 Cont ID  
Sent By jleahy Date 2019-10-01 Time 16:38 Rev Time 0.00
Received By jleahy Date 2019-10-01 Time 16:38 Sent To  
Notes
2019-10-01 16:41:25FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NEED CUT SHEETS ON GENERATOR AND TRANSFER SWITCH.
  
 SITE PLAN SHOWING LOCATION OF GENERATOR.

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2019-09-26 Cont ID  
Sent By lcrespo Date 2019-09-26 Time 16:48 Rev Time 0.00
Received By lcrespo Date 2019-09-26 Time 16:48 Sent To  
Notes
2019-09-26 16:49:12GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-16 Cont ID  
Sent By jleahy Date 2019-10-16 Time 10:34 Rev Time 0.00
Received By jleahy Date 2019-10-10 Time 14:32 Sent To  
Notes
2019-10-10 14:32:52RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-02 Cont ID  
Sent By rmcdouga Date 2019-10-02 Time 16:49 Rev Time 0.00
Received By rmcdouga Date 2019-09-24 Time 12:56 Sent To  
Notes
2019-09-25 12:56:31ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-10-11 Cont ID  
Sent By rfalcone Date 2019-10-11 Time 11:33 Rev Time 0.00
Received By rfalcone Date 2019-10-11 Time 11:33 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-09-26 Cont ID  
Sent By rfalcone Date 2019-09-26 Time 08:40 Rev Time 0.00
Received By rfalcone Date 2019-09-26 Time 08:40 Sent To  
Notes
2019-09-26 08:45:5109/26/19 FAILED.
  
 PROVIDE A SURVEY OF THE SUBJECT PROPERTY WITH THE
 LOCATION OF THE PROPOSED GENERATOR. INCUDE THE PROPOSED
 SETBACKS FOR THE PROPOSED GENERATOR. PER. ZLDR SEC.
 94-305(B)(4), MECHANICAL EQUIPMENT MAY NOT PROJECT MORE
 THAN FOUR FEET INTO A SETBACK. WINDOW AIR-CONDITIONING
 UNITS MAY NOT PROJECT MORE THAN 18 INCHES INTO A
 REQUIRED SIDE SETBACK.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy