Plan Review Details - Permit 19090374
Plan Review Stops For Permit 19090374
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-09-24 Cont ID  
Sent By dbattles Date 2019-09-24 Time 12:31 Rev Time 0.00
Received By shill Date 2019-09-24 Time 12:31 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-10-02 Cont ID  
Sent By jpearson Date 2019-10-02 Time 15:10 Rev Time 0.00
Received By jpearson Date 2019-10-02 Time 15:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-09-20 Cont ID  
Sent By jpearson Date 2019-09-20 Time 06:59 Rev Time 0.00
Received By jpearson Date 2019-09-20 Time 06:59 Sent To  
Notes
2019-09-20 06:59:00CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. ONLY ONE E-2 SHEET WAS PROVIDED FOR REVIEW. A
 MINIMUM OF TWO COPIES OF PLAN SHEET IS REQUIRED FOR
 REVIEW. PROVIDE CORRECTION. WPB FBC 107.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-09-16 Cont ID  
Sent By pleduc Date 2019-09-16 Time   Rev Time 0.00
Received By pleduc Date 2019-09-16 Time 14:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2019-10-02 Time   Rev Time 0.00
Received By lmarchan Date 2019-09-25 Time 13:13 Sent To  
Notes
2019-09-26 13:13:40RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-24 Cont ID  
Sent By shill Date 2019-09-24 Time 12:31 Rev Time 0.00
Received By shill Date 2019-09-11 Time 14:09 Sent To  
Notes
2019-09-12 14:10:05B07


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved