Plan Review Details - Permit 19090209
Plan Review Stops For Permit 19090209
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-10-01 Cont ID  
Sent By pvalenti Date 2019-10-01 Time 16:05 Rev Time 0.00
Received By pvalenti Date 2019-10-01 Time 16:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-09-19 Cont ID  
Sent By pvalenti Date 2019-09-19 Time 15:55 Rev Time 0.00
Received By pvalenti Date 2019-09-19 Time 15:55 Sent To  
Notes
2019-09-19 15:59:38***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW DENIED:
  
 1. PROVIDE INDICATIONS ON SURVEY SHOWING WATER RUN-OFF
 DIRECTION.
 2. THE SET BACKS FROM PROPERTY LINE TO PAVERS NEEDS TO
 BE ADJUSTED, SEE ZONING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-10-08 Cont ID  
Sent By cpuell Date 2019-10-08 Time 14:43 Rev Time 0.00
Received By cpuell Date 2019-10-04 Time 14:30 Sent To  
Notes
2019-10-07 14:30:52RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-01 Cont ID  
Sent By pvalenti Date 2019-10-01 Time 16:06 Rev Time 0.00
Received By pvalenti Date 2019-09-20 Time 14:53 Sent To  
Notes
2019-09-23 14:54:10RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-19 Cont ID  
Sent By rfalcone Date 2019-09-19 Time 16:21 Rev Time 0.00
Received By pvalenti Date 2019-09-09 Time 14:13 Sent To  
Notes
2019-09-10 14:13:48ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 3 Status P Date 2019-10-08 Cont ID  
Sent By rfalcone Date 2019-10-08 Time 11:38 Rev Time 0.00
Received By rfalcone Date 2019-10-08 Time 11:38 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2019-09-25 Cont ID  
Sent By rfalcone Date 2019-09-25 Time 14:37 Rev Time 0.00
Received By rfalcone Date 2019-09-25 Time 14:37 Sent To B
Notes
2019-09-25 14:39:4609/25/19 FAILED.
  
 PLEASE ADDRESS PREVIOUS COMMENTS. THE SETBACKS FOR THE
 PATIO NEEDS TO BE ILLUSTRATED AND LABELED ON THE
 SURVEY. THE SUBMITTED DRAWING OF THE PROPOSED PATIO IS
 NOT SUFFIECENT FOR THE REVIEW.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]
  
 ******
  
 09/12/19 FAILED.
  
 THE REQUIRED SETBACKS FOR THE PATIO IN THE BACK YARD IS
 SIDE SETBACK OF FIVE FEET FROM THE LOT LINE AND THE
 REAR SETBACK IS FIVE FEET MINIMUM. PLEASE REVISE PLANS
 AND INDICATE ON THE SURVEY THE SIDE AND REAR SETBACKS
 FOR THE PROPOSED PATIO.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 2019-09-12 Cont ID  
Sent By rfalcone Date 2019-09-12 Time 16:20 Rev Time 0.00
Received By rfalcone Date 2019-09-12 Time 16:20 Sent To B
Notes
2019-09-12 16:24:4709/12/19 FAILED.
  
 THE REQUIRED SETBACKS FOR THE PATIO IN THE BACK YARD IS
 SIDE SETBACK OF FIVE FEET FROM THE LOT LINE AND THE
 REAR SETBACK IS FIVE FEET MINIMUM. PLEASE REVISE PLANS
 AND INDICATE ON THE SURVEY THE SIDE AND REAR SETBACKS
 FOR THE PROPOSED PATIO.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved