Plan Review Details - Permit 19081420
Plan Review Stops For Permit 19081420
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2019-09-18 Cont ID  
Sent By tklarge Date 2019-09-18 Time 06:57 Rev Time 0.00
Received By tklarge Date 2019-09-18 Time 03:52 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-08-28 Cont ID  
Sent By lcrespo Date 2019-08-28 Time 18:03 Rev Time 0.00
Received By lcrespo Date 2019-08-28 Time 17:38 Sent To  
Notes
2019-08-28 18:05:2008/28/2018 1ST GAS REVIEW **DENIED** WITH COMMENTS.
  
 NOTE: A FULL AND COMPREHENSIVE PLAN REVIEW COULD NOT BE
 ACCOMPLISHED AT THIS TIME DUE TO THE QUALITY OF THE
 SUBMITTED PLANS. ADDITIONAL COMMENTS MAY BE GENERATED
 ON THE RESUBMITTAL REVIEW.
  
 1. A REGULATOR IS REQUIRED TO BRING THE SYSTEM DOWN TO
 10.0 WC. PLEASE SUBMIT MANUFACTURER?S SPECIFICATIONS
 FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON
 THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR
 OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. G2421.
  
 2. GAS RISER DIAGRAM REQUIRED, SUBMIT AN ISOMETRIC
 DRAWING THAT CLEARLY SHOWS, UNIONS, SHUTOFF VALVES ON
 SYSTEM, SEDIMENT TRAP AND REGULATOR PER THE 2017 FBC
 RES. SECS. G2413.4.1, G2413.4.2.
  
 3. THE ADDRESS OF THE PROJECT OR RESIDENCE MUST BE ON
 PLAN. WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION
 ON CONSTRUCTION DOCUMENTS.
  
 4. TYPE OF GAS LABELED ON PLANS AND METER PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 5. ONLY PAGE ONE OF THE MANUAL WAS SUBMITTED ON
 MANUFACTURER?S SPECIFICATION SHEETS/INSTALLATION MANUAL
 FOR POOL HEATER EQUIPMENT WE WILL NEED TO VERIFY
 COMPLIANCE WITH 2017 FBC FG RES. SEC. G2408.1. THE POOL
 HEATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY OF 82%
 PER THE 2017 FBC-ENERGY SEC. R403.10.4.
  
 6. SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR POOL HEATER EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC FG RES. SEC. G2408.1.
 THE POOL HEATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY
 OF 82% PER THE 2017 FBC-ENERGY SEC. R403.10.4.
  
 7. MANUFACTURER?S SPECIFICATION SHEETS/INSTALLATION
 MANUAL FOR HEATER EQUIPMENT TO VERIFY COMPLIANCE WITH
 2017 FBC FG SEC.305.1 OR 2017 FBC RES. SEC. G2408.1.
  
 8. A SOLAR COVER OR A LIQUID COVER REQUIRED PER 2017
 FBC EC404.9.3 COVERS. OUTDOOR HEATED SWIMMING POOLS AND
 OUTDOOR PERMANENT SPAS SHALL BE EQUIPPED WITH A
 VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A
 LIQUID COVER OR OTHER MEANS PROVING TO REDUCE HEAT
 LOSS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-09-18 Cont ID  
Sent By tklarge Date 2019-09-18 Time 06:58 Rev Time 0.00
Received By tklarge Date 2019-09-18 Time 03:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-28 Cont ID  
Sent By lcrespo Date 2019-08-28 Time 18:03 Rev Time 0.00
Received By lcrespo Date 2019-08-28 Time 17:16 Sent To  
Notes
2019-08-28 17:17:23P> 5K