Plan Review Details - Permit 19081288
Plan Review Stops For Permit 19081288
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By jgomez Date 2019-11-21 Time 15:07 Rev Time 0.00
Received By jgomez Date 2019-11-21 Time 14:37 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-10-02 Cont ID  
Sent By jgomez Date 2019-10-02 Time 19:00 Rev Time 0.00
Received By jgomez Date 2019-10-02 Time 18:29 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-12-17 Cont ID  
Sent By rrossano Date 2019-12-17 Time   Rev Time 0.00
Received By rrossano Date 2019-12-17 Time   Sent To I
Notes
2019-12-17 09:26:56PASSED WITH PROVISO: EASEMENT FOR SANITARY LINE SHALL
 BE RECORDED BEFORE FINAL CERTIFICATE OF COMPLETION IS
 ISSUED.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-10-28 Cont ID  
Sent By rrossano Date 2019-10-28 Time   Rev Time 0.00
Received By rrossano Date 2019-10-28 Time   Sent To  
Notes
2019-10-28 11:07:361) PLEASE CONFIRM SIDEWALK SECTION ON TRINITY PLACE
 PARALLEL WITH ONSTREET PARKING IS ADA COMPLIANT.
 2) FENCE SECTION ON TOP OF EXISTING SANITARY LINE SHALL
 BE CONSTRUCTED AS TO BE REMOVABLE OR GATED IN ORDER TO
 ALLOW MAINTENANCE ACCESS TO SANITARY LINE.
 3) IN 2000, THE EXISTING SANITARY SEWER ON SITE WAS
 RE-ROUTED FOR THE CONSTRUCTION OF THE COMMUNITY
 FOUNDATION BUILDING. ALTHOUGH THE AS-BUILTS SHOW A 15?
 UTILITY EASEMENT (UE), NO RECORDED DOCUMENT HAS BEEN
 FOUND. AS SUCH, WE WILL NEED TO HAVE A SKETCH AND LEGAL
 DESCRIPTION PREPARED AND AN EASEMENT GRANTED TO THE
 CITY.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 FAX:
 (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-17 Cont ID  
Sent By shill Date 2019-12-17 Time 13:11 Rev Time 0.00
Received By shill Date 2019-11-13 Time 12:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-28 Cont ID  
Sent By lmarchan Date 2019-10-28 Time 11:27 Rev Time 0.00
Received By lmarchan Date 2019-09-17 Time 08:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By jgomez Date 2019-11-21 Time 15:08 Rev Time 0.00
Received By jgomez Date 2019-11-21 Time 15:08 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-10-03 Cont ID  
Sent By jgomez Date 2019-10-02 Time 19:00 Rev Time 0.00
Received By jgomez Date 2019-10-02 Time 19:00 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-12-13 Cont ID  
Sent By aaponte Date 2019-12-13 Time 10:15 Rev Time 0.00
Received By aaponte Date 2019-12-13 Time 10:15 Sent To  
Notes
2019-12-13 10:15:58PROVISO: 1. NEW PERIMETER COLUMNS OR FENCES CANNOT BE
 HIGHER THAN 4'-4"
 INCLUDING DECORATIVE ELEMENT.
 2.EASEMENT FOR SANITARY LINE SHALL BE RECORDED BEFORE
 FINAL CERTIFICATE OF COMPLETION IS ISSUED.

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-22 Cont ID  
Sent By aaponte Date 2019-10-22 Time 09:23 Rev Time 0.00
Received By aaponte Date 2019-10-22 Time 09:23 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved