Plan Review Details - Permit 19081201
Plan Review Stops For Permit 19081201
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2019-10-30 Cont ID  
Sent By lcrespo Date 2019-10-30 Time 18:32 Rev Time 0.00
Received By lcrespo Date 2019-10-30 Time 18:32 Sent To  
Notes
2019-10-30 18:33:2810/30/19 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 2:00 PM TO 5:00 PM
 [email protected]
 561-701-6437
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-10-30 Cont ID  
Sent By lcrespo Date 2019-08-26 Time 17:09 Rev Time 0.00
Received By lcrespo Date 2019-08-26 Time 18:32 Sent To  
Notes
2019-08-26 17:10:2808/26/2019 1ST PLUMBING/GAS REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR RANGE GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. G2408.1.
  
 2. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE 2017
 FBC RES. SECS. G2413.2 AND G2404.3.
  
 3. THIS TANKLESS UNIT CALL FOR 10.5? WATER COLUMN AND
 THE SERVICE METER DISCHARGES IS A 12? WATER COLUMN
 REQUIRING A REGULATOR FOR THIS UNIT AS PER
 MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER?S
 SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES.
 SEC. G2421.1.
  
 4. SHOW DRIP LEG ON EQUIPMENT INSTALLED PER THE 2017
 FBC RES. SEC. G2419.2.
  
 5. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF
 EITHER SIDE PER THE 2017 FBC RES. SEC. G2421.2.
  
 6. SHOW AND LABEL SHUTOFF VALVES ON GAS ISOMERIC PER
 THE 2017 FBC RES. SEC. G2401.1.3.
  
 7. TOTAL JOB COST SEEMS LOW. THE VALUE MUST INCLUDE THE
 COST OF ALL EQUIPMENT INCLUDING TANKLESS. PROVIDED ON
 THE BONA FIDE CONTRACT PER THE WPB AMENDMENTS TO THE
 FBC 109.3 BUILDING PERMIT VALUATIONS.
  
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-30 Cont ID  
Sent By lcrespo Date 2019-10-30 Time 18:32 Rev Time 0.00
Received By lcrespo Date 2019-10-29 Time 15:26 Sent To  
Notes
2019-10-30 15:27:02RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-26 Cont ID  
Sent By lcrespo Date 2019-08-26 Time 17:12 Rev Time 0.00
Received By lcrespo Date 2019-08-23 Time 16:18 Sent To  
Notes
2019-08-23 16:18:43PLUMB <5K


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved