2019-08-13 15:35:27 | 08/13/2019 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. CITY RECORDS SHOW AN EXISTING GAS RANGE AND ALSO A |
| DRYER ON THE GAS SYSTEM. THE BTU LOAD OF THE EXISTING |
| GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE |
| SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. |
| IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| EXISTING APPLIANCES, 2017 FBC RES. SECS. G2412.4, |
| G2412.8, G2413.1, G2413.2, G2413.3. |
| |
| 2. A REGULATOR IS REQUIRED TO BRING THE SYSTEM DOWN TO |
| 10.5 WC. PLEASE SUBMIT MANUFACTURER?S SPECIFICATIONS |
| FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON |
| THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR |
| OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. |
| G2421.1. |
| |
| 3. GAS RISER DIAGRAM REQUIRED AND PLEASE SHOW ALL |
| APPLIANCES, VALVES, DRIP LEG AND UNIONS PER WPB |
| AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL |
| GAS |
| |
| 4. SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| DRAWN. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 5. A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE |
| OF IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1. |
| |
| 6. AL LINES ON THE OUTSIDE FOR THE HOT MUST BE |
| INSULATED PER 2017 FBC EC 403.5.3. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| 561-805-6720 |
| |