Plan Review Details - Permit 19071459
Plan Review Stops For Permit 19071459
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-11-20 Cont ID  
Sent By pvalenti Date 2019-11-20 Time 09:45 Rev Time 0.00
Received By pvalenti Date 2019-11-20 Time 09:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-08-12 Cont ID  
Sent By shill Date 2019-08-12 Time 13:43 Rev Time 0.00
Received By shill Date 2019-08-12 Time 13:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2019-09-13 Cont ID  
Sent By fgiaquin Date 2019-09-13 Time 06:29 Rev Time 0.00
Received By fgiaquin Date 2019-09-13 Time 06:29 Sent To I
Notes
2019-09-13 06:29:55NO ELECTRICAL WORK REVIEWED OR APPROVED

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-11-18 Cont ID  
Sent By rrossano Date 2019-11-18 Time   Rev Time 0.00
Received By rrossano Date 2019-11-18 Time   Sent To B
Notes
2019-11-18 08:30:49PASSED WITH PROVISO:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 FAX:
 (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-08-07 Cont ID  
Sent By rrossano Date 2019-08-07 Time   Rev Time 0.00
Received By rrossano Date 2019-08-07 Time   Sent To B
Notes
2019-08-07 06:59:34SIGN PLACEMENT SHALL COMPLY WITH MUNICODE 94-305-01
 (E):
  
 VISIBILITY AT INTERSECTIONS. AT ANY ROAD INTERSECTIONS,
 VISIBILITY SHALL NOT BE OBSCURED BY THE CONSTRUCTION,
 PLACEMENT, OR MAINTENANCE OF A STRUCTURE WALL, SIGN,
 FENCE, BERM, PLANT MATERIAL, SHRUBS, OR ANY SIMILAR
 ITEM BETWEEN 18 INCHES OR EIGHT FEET IN HEIGHT WITHIN A
 TRIANGLE BEGINNING AT THE POINT WHERE PROPERTY LINES
 MEET AT THE CORNER, THEN 20 FEET ALONG THE FRONT
 PROPERTY LINE, THENCE DIAGONALLY TO A POINT ALONG THE
 SIDE PROPERTY LINE 20 FEET FROM THE POINT OF BEGINNING,
 AND THENCE TO THE POINT OF BEGINNING. IN THE EVENT THE
 CORNER OF AN INTERSECTION IS ROUNDED, THE MEASUREMENT
 SHALL BEGIN AT THE POINT THE PROPERTY LINES WOULD MEET
 WITHOUT ROUNDING. (SEE FIGURE X-1)
 (CODE 1979, ? 33-112; ORD. NO. 3744-04, ? 4, 9-27-2004;
 ORD. NO. 4370-11, ? 3, 10-3-2011; ORD. NO. 4449-13, ?
 24, 3-19-2013; ORD. NO. 4660-16, ? 9, 12-5-2016)
  
 LINK: HTTPS://LIBRARY.MUNICODE.COM/FL/WEST_PALM_BEACH/C
 ODES/CODE_OF_ORDINANCES?NODEID=PTIICOOR_CH94ZOLADERE_AR
 TXSUDIRE_DIV1GE_S94-305SE
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-20 Cont ID  
Sent By pvalenti Date 2019-11-20 Time 09:46 Rev Time 0.00
Received By pvalenti Date 2019-11-12 Time 14:17 Sent To  
Notes
2019-11-13 14:17:31RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-13 Cont ID  
Sent By fgiaquin Date 2019-09-13 Time 06:29 Rev Time 0.00
Received By fgiaquin Date 2019-07-29 Time 15:02 Sent To  
Notes
2019-08-12 13:43:30TO ELEC
2019-07-30 15:03:00ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-11-14 Cont ID  
Sent By rfalcone Date 2019-11-14 Time 15:24 Rev Time 0.00
Received By rfalcone Date 2019-11-14 Time 15:24 Sent To ENG
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-08-06 Cont ID  
Sent By ajones Date 2019-08-06 Time 11:30 Rev Time 0.00
Received By ajones Date 2019-08-06 Time 11:30 Sent To ENG
Notes
2019-08-06 11:31:218/6/19- APPROVED. AN ENGINEERING REVIEW STOP WAS ADDED
 TO REVIEW THE LOCATION OF THE SIGNS AS IT RELATES TO
 THE VISIBILITY TRIANGLE.
  
 ANGELLA VANN


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved