Plan Review Details - Permit 19071346
Plan Review Stops For Permit 19071346
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2019-08-07 Cont ID  
Sent By shill Date 2019-08-07 Time 13:34 Rev Time 0.00
Received By shill Date 2019-07-29 Time 16:17 Sent To  
Notes
2019-08-07 13:37:03****PROVISO****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 SEE INSTRUCTIONS ON THE WEBSITE OF THE ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH, PALM BEACH
 COUNTY:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THIS PERMIT IS BEING ISSUED CONDITIONALLY AT
 APPLICANT'S RISK
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-29 Cont ID  
Sent By pvalenti Date 2019-07-29 Time 16:13 Rev Time 0.00
Received By pvalenti Date 2019-07-29 Time 16:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-08-07 Cont ID  
Sent By jpearson Date 2019-08-07 Time 14:18 Rev Time 0.00
Received By jpearson Date 2019-08-07 Time 14:18 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-07-30 Cont ID  
Sent By jleahy Date 2019-07-30 Time 12:52 Rev Time 0.00
Received By jleahy Date 2019-07-30 Time 12:52 Sent To FIRE
Notes
2019-08-07 13:43:59ELECTRICAL PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND CC
 [email protected] AND [email protected] SO WE RECEIVE IT
 ALSO. WHEN THIS EMAIL IS RECEIVED ONE OF THE REVIEWERS
 WILL APPROVE THE PLAN REVIEW. THE ORIGINAL PERMIT
 APPLICATION MUST BE SUBMITTED WHEN THE PERMIT IS PICKED
 UP. WPB FBC 105.1
2019-07-30 12:53:01NEEDS AN ELECTRICAL PERMIT TO ISSUE JLEAHY

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-07-31 Cont ID  
Sent By pleduc Date 2019-07-31 Time   Rev Time 0.00
Received By pleduc Date 2019-07-31 Time 10:44 Sent To M
Notes
2019-07-31 10:46:21THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) ALL DEMO WORK SHALL COMPLY WITH NFPA 241, STANDARD
 FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND
 DEMOLITION OPERATIONS, 2013 EDITION
  
 CHAPTER 10 SAFEGUARDING DEMOLITION OPERATIONS
  
 10.1 GENERAL. IN ADDITION TO THE SPECIFIC REQUIREMENTS
 OF THIS
 CHAPTER, THE PROVISIONS OF CHAPTER 1 AND CHAPTERS 3
 THROUGH 7
 SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION
 OPERATIONS.
  
 PLEASE REVIEW AND ENSURE COMPLIANCE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-07 Cont ID  
Sent By shill Date 2019-08-07 Time 13:42 Rev Time 0.00
Received By shill Date 2019-07-25 Time 16:17 Sent To  
Notes
2019-07-26 16:17:11SHILL

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-08-07 Cont ID  
Sent By cmontell Date 2019-08-07 Time 13:29 Rev Time 0.00
Received By cmontell Date 2019-08-07 Time 13:29 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2019-08-07 Cont ID  
Sent By pvalenti Date 2019-08-07 Time 13:42 Rev Time 0.00
Received By shill Date 2019-08-07 Time 13:42 Sent To  
Notes
***NONE***