Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-08-28 Cont ID  
Sent By lcrespo Date 2019-08-28 Time 15:27 Rev Time 0.00
Received By pvalenti Date 2019-08-28 Time 15:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-08-06 Cont ID  
Sent By pvalenti Date 2019-08-06 Time 18:21 Rev Time 0.00
Received By pvalenti Date 2019-08-06 Time 18:21 Sent To  
Notes
2019-08-06 18:26:47***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 1. AN ADDITIONAL PERMIT IS REQUIRED FOR PLUMBING WORK.
  
 2. PLEASE NOTE THAT FOR THE UNDERLAYMENT/FLOORING, TEST
 REPORTS ARE REQUIRED - MANUFACTURER SPEC SHEETS ARE NOT
 ACCEPTABLE DUE TO DISCREPANCIES BETWEEN SPEC
 SHEETS/BROCHURES AND TEST REPORTS FOR SOME
 MANUFACTURERS (NOT NECESSARILY THE MANUFACTURER
 SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-28 Cont ID  
Sent By pvalenti Date 2019-08-28 Time 15:28 Rev Time 0.00
Received By pvalenti Date 2019-08-26 Time 16:39 Sent To  
Notes
2019-08-26 16:39:49RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-06 Cont ID  
Sent By pvalenti Date 2019-08-06 Time 18:26 Rev Time 0.00
Received By pvalenti Date 2019-07-25 Time 14:11 Sent To  
Notes
2019-07-30 14:12:04ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-08-28 Cont ID  
Sent By lcrespo Date 2019-08-28 Time 07:07 Rev Time 0.00
Received By lcrespo Date 2019-08-28 Time 07:07 Sent To  
Notes
2019-08-28 07:07:5908/28/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-08-01 Cont ID  
Sent By lcrespo Date 2019-08-01 Time 07:24 Rev Time 0.00
Received By lcrespo Date 2019-08-01 Time 07:24 Sent To  
Notes
2019-08-01 14:46:0808/01/2019 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A GENERAL CONTRACTOR CAN NOT DO PLUMBING WORK PER
 SEC 489.105 OF THE FLORIDA STATUES. PLEASE PROVIDE A
 SEPARATE PERMIT WITH THIS APPLICATION FOR ALL PLUMBING
 WORK FROM A LICENSE PLUMBING CONTRACTOR IN ACCORDANCE
 WITH 489.105 AND 489.113
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved