Plan Review Details - Permit 19071126
Plan Review Stops For Permit 19071126
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-08-09 Cont ID  
Sent By rmcdouga Date 2019-08-09 Time 16:54 Rev Time 0.00
Received By rmcdouga Date 2019-08-09 Time 16:54 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By rmcdouga Date 2019-07-25 Time 10:23 Rev Time 0.00
Received By rmcdouga Date 2019-07-25 Time 09:32 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-08-09 Cont ID  
Sent By jleahy Date 2019-08-09 Time 07:52 Rev Time 0.00
Received By jleahy Date 2019-08-09 Time 07:52 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-07-29 Cont ID  
Sent By jleahy Date 2019-07-29 Time 07:33 Rev Time 0.00
Received By jleahy Date 2019-07-29 Time 07:33 Sent To  
Notes
2019-07-29 07:35:16FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 VALUE FOR WORK IS LOW..
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-09 Cont ID  
Sent By rmcdouga Date 2019-08-09 Time 16:56 Rev Time 0.00
Received By rmcdouga Date 2019-08-06 Time 14:01 Sent To  
Notes
2019-08-07 14:01:12RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-01 Cont ID  
Sent By lcrespo Date 2019-08-01 Time 06:58 Rev Time 0.00
Received By lcrespo Date 2019-07-22 Time 16:07 Sent To  
Notes
2019-07-22 16:07:46ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-08-09 Cont ID  
Sent By lcrespo Date 2019-08-09 Time 16:23 Rev Time 0.00
Received By lcrespo Date 2019-08-09 Time 16:23 Sent To  
Notes
2019-08-09 16:25:2108/09/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-08-01 Cont ID  
Sent By lcrespo Date 2019-08-01 Time 06:57 Rev Time 0.00
Received By lcrespo Date 2019-08-01 Time 06:57 Sent To  
Notes
2019-08-01 07:08:0908/01/2019 1ST PLUMBING/POOL REVIEW**DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THIS POOL DOES NOT HAVE A HEATER AND IN THE DYNAMIC
 CALCULATIONS YOU HAVE A HEATER IN THE SUMS, PLEASE TAKE
 OUT THE HEATER AND REFER OR ADJUST PUMP SIZE SHOWING
 YOUR WORK ON CURVE AND CALCULATIONS, WPB AMENDMENTS TO
 THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-07-24 Cont ID  
Sent By ajones Date 2019-07-24 Time 12:43 Rev Time 0.00
Received By ajones Date 2019-07-24 Time 12:43 Sent To  
Notes
***NONE***