Plan Review Details - Permit 19071018
Plan Review Stops For Permit 19071018
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By skennedy Date 2019-07-25 Time 15:24 Rev Time 0.00
Received By skennedy Date 2019-07-25 Time 15:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-08-08 Cont ID  
Sent By jpearson Date 2019-08-08 Time 14:15 Rev Time 0.00
Received By jpearson Date 2019-08-08 Time 14:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-07-25 Cont ID  
Sent By skennedy Date 2019-07-25 Time 15:27 Rev Time 0.00
Received By skennedy Date 2019-07-25 Time 15:27 Sent To  
Notes
2019-07-25 15:48:381ST REVIEW: FBC 2017 6TH EDITION
 FBC 2017 EXISTING BUILDING; NEC
  
 PLAN IS ACCEPTABLE, ELECTRICAL SUB PERMIT REQUIRED
 PRIOR TO OR CONCURRENT WITH ISSUANCE.
  
 YOU MAY EMAIL THE ELECTRICAL PERMIT APPLICATION TO
 [email protected] AND CC [email protected] AND
 [email protected] SO WE RECEIVE IT ALSO. WHEN THIS EMAIL
 IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN
 REVIEW. THE ORIGINAL PERMIT APPLICATION MUST BE
 SUBMITTED WHEN THE PERMIT IS PICKED UP. WPB FBC 105.1
  
 .STEVEN KENNEDY, CBO
 ASSISTANT BUILDING OFFICIAL
 (561) 805-6710
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-07-26 Cont ID  
Sent By pleduc Date 2019-07-26 Time   Rev Time 0.00
Received By pleduc Date 2019-07-26 Time 10:18 Sent To I
Notes
2019-07-26 10:26:05THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) ENSURE COMPLIANCE WITH THE REQUIRMENTS OF NFPA 24,
 SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
 OPERATIONS
  
 PER CHAPTER 10,SAFEGUARDING DEMOLITION OPERATIONS
  
 10.1 GENERAL. IN ADDITION TO THE SPECIFIC REQUIREMENTS
 OF THIS
 CHAPTER, THE PROVISIONS OF CHAPTER 1 AND CHAPTERS 3
 THROUGH 7
 SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION
 OPERATIONS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-26 Cont ID  
Sent By lmarchan Date 2019-07-26 Time 11:00 Rev Time 0.00
Received By lmarchan Date 2019-07-23 Time 07:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By skennedy Date 2019-07-25 Time 15:24 Rev Time 0.00
Received By skennedy Date 2019-07-25 Time 15:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By skennedy Date 2019-07-25 Time 15:24 Rev Time 0.00
Received By skennedy Date 2019-07-25 Time 15:24 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By skennedy Date 2019-07-25 Time 15:48 Rev Time 0.00
Received By skennedy Date 2019-07-25 Time 15:48 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved