Plan Review Details - Permit 19070390
Plan Review Stops For Permit 19070390
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-15 Cont ID  
Sent By rmcdouga Date 2019-07-15 Time 07:08 Rev Time 0.00
Received By rmcdouga Date 2019-07-15 Time 07:08 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-07-22 Cont ID  
Sent By rrossnao Date 2019-07-22 Time   Rev Time 0.00
Received By rrossano Date 2019-07-22 Time   Sent To I
Notes
2019-07-22 12:59:34PASSED WITH PROVISO:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-22 Cont ID  
Sent By cpuell Date 2019-07-22 Time 13:42 Rev Time 0.00
Received By cpuell Date 2019-07-09 Time 15:15 Sent To  
Notes
2019-07-10 15:15:43ROUTED TO ZONING INBOX

Review Stop STORM STORMWATER
Rev No 2 Status N Date 2019-07-23 Cont ID  
Sent By abelisle Date 2019-07-23 Time 16:53 Rev Time 0.00
Received By abelisle Date 2019-07-23 Time 16:53 Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status F Date 2019-07-13 Cont ID  
Sent By abelisle Date 2019-07-13 Time 07:51 Rev Time 0.00
Received By abelisle Date 2019-07-13 Time 16:58 Sent To  
Notes
2019-07-13 07:51:437/13/19 DENIED
  
 PLEASE INDICATE DISCHARGE LOCATION OF DOWN SPOUT DRAIN
 LINE, SIZE, AND TYPE OF MATERIAL BEING USED FOR THE
 DRAIN PIPE INSTALLATION
  
 PLUMBING RISER DIAGRAM REQUIRED WPB AMENDMENTS TO THE
 FBC SEC. 107.3.5.3 (11) RESIDENTIAL PLUMBING
  
 THERE ARE TWO DIFFERENT CONTRACTS PROVIDED, WHICH ONE
 WILL BE USED?
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-07-17 Cont ID  
Sent By ajones Date 2019-07-17 Time 16:35 Rev Time 0.00
Received By ajones Date 2019-07-17 Time 16:35 Sent To ENG
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved