Plan Review Details - Permit 19061116
Plan Review Stops For Permit 19061116
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-08-26 Cont ID  
Sent By rmcdouga Date 2019-08-26 Time 08:27 Rev Time 0.00
Received By rmcdouga Date 2019-08-26 Time 08:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-06-27 Cont ID  
Sent By rmcdouga Date 2019-06-27 Time 07:09 Rev Time 0.00
Received By rmcdouga Date 2019-06-27 Time 07:09 Sent To P
Notes
2019-06-27 07:14:20PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF A FLOOR PLAN SHOWING THE SCOPE OF
 WORK AND LOCATION OF THE SHOWER WITH SHOWER PAN
 DETAILS. FBC 107.2.1
  
 2) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS.
 ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-26 Cont ID  
Sent By tklarge Date 2019-08-26 Time 09:23 Rev Time 0.00
Received By tklarge Date 2019-08-23 Time 15:55 Sent To  
Notes
2019-08-23 15:56:10RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-28 Cont ID  
Sent By tklarge Date 2019-06-28 Time 11:05 Rev Time 0.00
Received By tklarge Date 2019-06-24 Time 14:58 Sent To  
Notes
2019-06-25 14:58:43BLDG MISC 2

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-08-26 Cont ID  
Sent By tklarge Date 2019-08-26 Time 09:23 Rev Time 0.00
Received By tklarge Date 2019-08-26 Time 09:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-08-26 Cont ID  
Sent By tklarge Date 2019-06-28 Time 11:05 Rev Time 0.00
Received By tklarge Date 2019-06-28 Time 10:47 Sent To  
Notes
2019-06-28 11:04:57 
 1) SUBMIT TWO SETS OF A FLOOR PLAN SHOWING THE SCOPE OF
 WORK AND LOCATION OF THE SHOWER WITH SHOWER PAN
 DETAILS. FBC 107.2.1
  
 2) THE PLUMBING WORK TO BE DONE MUST BE DONE BY A
 LICENSED PLUMBING CONTRACTOR PER FL. STATUTE 489.
 SUBMIT A PERMIT APPLICATION FROM A CURRENTLY LICENSED
 PLUMBING CONTRACTOR. A CGC CANNOT INSTALL THE SHOWER
 PAN OR ANY PLUMBING ITEMS. WPB AMEND. TO FBC SEC.
 105.1.
  
 3) INDICATE ON THE REQUESTED PLANS IF A NEW SHOWER
 VALVE WILL BE INSTALLED. THE VALVE SHALL BE
 THERMOSTATIC OR PRESSURE-BALANCED.WPB AMEND. TO FBC
 SEC. 107.2.1.
  
 4) MATERIALS USED AS A BASE FOR WALL TILE IN TUB AND
 SHOWER AREAS AND WALL AND CEILING PANELS IN SHOWER
 AREAS SHALL BE OF MATERIALS LISTED IN 2017 FBC TABLE
 2509.2. INDICATE TYPE OF MATERIAL ON REQUESTED PLANS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved