Plan Review Details - Permit 19041320
Plan Review Stops For Permit 19041320
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-06-13 Cont ID  
Sent By rmcdouga Date 2019-06-13 Time 13:10 Rev Time 0.00
Received By jgomez Date 2019-06-13 Time 11:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-15 Cont ID  
Sent By jwitmer Date 2019-05-15 Time 07:09 Rev Time 0.00
Received By rmcdouga Date 2019-05-14 Time 18:15 Sent To I
Notes
2019-05-14 19:11:06PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) DOOR 110 FOR THE NEW IT/ELECTRICAL ROOM IS NOT
 LISTED IN THE DOOR SCHEDULE ON SHEET A2.1.1.
  
 2) THE REVISION IS TO ADD AN IT/ELECTRICAL ROOM TO THE
 BUSINESS OCCUPANCY. FBC TABLE 509 FOR INCIDENTIAL USES
 REQUIRES A ONE HOUR FIRE SEPARATION IF THERE IS
 STATIONARY STORAGE BATTERY SYSTEMS HAVING A LIQUID
 ELECTROLYTE CAPACITY OF MORE THAN 50 GALLONS FOR
 FLOODED LEAD-ACID, NICKEL CADIUM OR VRLA, OR MORE THAN
 1,000 POUNDS FOR LITHIUM-ION AND LITHIUM METAL POLYMER
 USED FOR FACILITY STANDBY POWER, EMERGENCY POWER OR
 UNINTERRUPTABLE POWER SUPPLIES. PLEASE ADVISE. FBC
 509.4.
  
 3) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-05-14 Cont ID  
Sent By jpearson Date 2019-05-14 Time 11:25 Rev Time 0.00
Received By jpearson Date 2019-05-14 Time 11:08 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-06-05 Cont ID  
Sent By pleduc Date 2019-06-05 Time   Rev Time 0.00
Received By pleduc Date 2019-06-05 Time 09:57 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-05-10 Cont ID  
Sent By scaldero Date 2019-05-10 Time   Rev Time 0.00
Received By pleduc Date 2019-05-10 Time 14:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-13 Cont ID  
Sent By jgomez Date 2019-06-13 Time 13:10 Rev Time 0.00
Received By jgomez Date 2019-06-03 Time 15:34 Sent To I
Notes
2019-06-04 15:35:04RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-15 Cont ID  
Sent By rmcdouga Date 2019-05-15 Time 07:09 Rev Time 0.00
Received By rmcdouga Date 2019-04-25 Time 16:13 Sent To  
Notes
2019-04-26 16:13:40B26

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-05-01 Cont ID  
Sent By ccole Date 2019-05-01 Time 17:08 Rev Time 0.00
Received By ccole Date 2019-05-01 Time 16:58 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-04-30 Cont ID  
Sent By gjohnson Date 2019-04-30 Time 14:38 Rev Time 0.00
Received By gjohnson Date 2019-04-30 Time 14:38 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved