Plan Review Stops For Permit 19040257 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2019-07-12 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2019-07-12 |
Time |
12:36 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2019-07-12 |
Time |
11:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2019-06-13 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2019-06-13 |
Time |
08:20 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2019-06-12 |
Time |
16:56 |
Sent To |
|
|
Notes |
2019-06-13 08:20:03 | BUILDING REVIEW COMMENTS: | | | | W.P.B. PERMIT: 19040257 | | REVIEWED: JUNE 13, 2019 | | | | DYLAN BATTLES | | BUILDING PLANS EXAMINER PX4191 | | [email protected] | | 561-805-6718 | | | | FBC[AMENDED] = FLORIDA BUILDING CODE,6TH EDITION (2017) | | FBC[B] = FBC BUILDING | | | | 1. 107.5.3 FBC[AMENDED] SHEET PD2 DOESN?T SHOW THE | | GENERATOR. PLEASE SHOW HOW GENERATOR AND PAD WORK WITH | | CIVIL PLAN AT DRAIN S-16. | | | | 2. 1601.1 FBC[B] PROVIDE DETAIL TO SHOW HOW GENERATOR | | CONNECTS TO PAD. | | | | 3. PROVIDE SPECIFICATIONS FOR THE GENERATOR. | | | | 4. IF SCREENING IS ADDED THEN SHOW DETAILS FOR | | ATTACHMENT AND WIND DESIGN. | | | | PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F | | 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME | | [email protected] | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2019-07-10 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2019-07-10 |
Time |
07:00 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2019-07-10 |
Time |
06:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2019-06-04 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2019-06-04 |
Time |
12:26 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2019-06-04 |
Time |
12:26 |
Sent To |
|
|
Notes |
2019-06-04 12:26:27 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | 6TH ED, CHAPTER 1. | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | 6TH EDITION | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | 6TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND | | SEALED BY THE PERSON RESPONSIBLE FOR THE DESIGN. WPB | | FBC 107.2.1, 107.3.5; FS 471, 481 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2019-07-05 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2019-07-05 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2019-07-05 |
Time |
15:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2019-05-31 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2019-05-31 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2019-05-31 |
Time |
11:12 |
Sent To |
|
|
Notes |
2019-05-31 11:47:04 | 5/31/19 | | | | | | 1) THE APPLICATION INDICATES THE INSTALLATION OF A | | GENERATOR & ATS. | | | | PER NFPA 37 | | | | 4.6* GENERAL INSTALLATION REQUIREMENTS. ENGINES AND | | THEIR | | APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE | | FOLLOWING: | | (1) APPLICABLE NFPA CODES AND STANDARDS | | (2) INDUSTRY STANDARDS | | (3) USER REQUIREMENTS | | (4) MANUFACTURER?S INSTALLATION INSTRUCTIONS | | (5)*APPLICABLE LOCAL BUILDING CODES WITH RESPECT TO | | WIND AND | | SEISMIC DESIGN REQUIREMENTS. | | | | 1A) THERE ARE NO GENERATOR DETAILS. | | | | PER NFPA 110 | | | | CHAPTER 4 CLASSIFICATION OF EMERGENCY POWER SUPPLY | | SYSTEMS (EPSSS) | | 4.1* GENERAL. THE EPSS SHALL PROVIDE A SOURCE OF | | ELECTRICAL | | POWER OF REQUIRED CAPACITY, RELIABILITY, AND QUALITY TO | | LOADS FOR | | A LENGTH OF TIME AS SPECIFIED IN TABLE 4.1(A) AND | | WITHIN A SPECIFIED | | TIME FOLLOWING LOSS OR FAILURE OF THE NORMAL POWER | | SUPPLY | | AS SPECIFIED IN TABLE 4.1(B). | | | | | | 1B) THERE ARE NO ATS DETAILS | | | | PER NFPA 110 CHAPTER 6 TRANSFER SWITCH EQUIPMENT | | 6.1 GENERAL. | | 6.1.1* SWITCHES SHALL TRANSFER ELECTRIC LOADS FROM ONE | | POWER | | SOURCE TO ANOTHER. | | 6.1.2* THE ELECTRICAL RATING SHALL BE SIZED FOR THE | | TOTAL LOAD THAT | | IS DESIGNED TO BE CONNECTED. | | 6.1.3 EACH SWITCH SHALL BE IN A SEPARATE ENCLOSURE OR | | COMPARTMENT. | | 6.1.4 THE SWITCH, INCLUDING ALL LOAD CURRENT-CARRYING | | COMPONENTS, | | SHALL BE LISTED FOR ALL LOAD TYPES TO BE SERVED. | | 6.1.5 THE SWITCH, INCLUDING ALL LOAD CURRENT-CARRYING | | COMPONENTS, | | SHALL BE DESIGNED TO WITHSTAND THE EFFECTS OF AVAILABLE | | FAULT CURRENTS. | | | | PLEASE REVIEW AND CORRECT OR PROVIDE DETAILED | | JUSTIFICATIONS. | | | | | | | | | | 2) THE ARE NO INDICATIONS OF COMPLIANCE WITH ANY NFPA | | CODES. | | | | NFPA 37 AND 110 ARE THE MINIMUM CODES OF COMPLAINCE. | | | | PLEASE REVIEW AND ENSURE COMPLAINCE AND PROVIDE AN | | APPLICABLE NOTE. | | | | | | | | 3) THERE ARE NO INDICATIONS OF WHERE THE EXHAUST IS | | LOCATED, AT WHAT HEIGHT IT ENDS AT, ANY DIMENSION TO | | OPENINGS THAT MAY BE APPLICABLE TO THE ABOVE NOTED | | CODES. | | | | | | | | PER NFPA 110 | | | | 7.10 EXHAUST SYSTEM. | | 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION, | | INCLUDING | | PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN | | ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION | | AND USE OF | | STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND | | OTHER APPLICABLE | | STANDARDS. | | | | NFPA 37 | | | | | | | | PLEASE REVIEW AND PROVIDE DETAILS. | | | | | | | | 4) THERE ARE NO MANUFACTURES SPEC SHEETS PROVIDED. | | | | PLEASE PROVIDE SPEC SHEETS FOR VERIFICATION PURPOSES. | | | | | | | | 5) THERE ARE NO INDICATIONS OF HOW THE GENERATOR WILL | | BE SECURED TO THE SLAB. | | | | 7.4 MOUNTING. | | 7.4.1 ROTATING ENERGY CONVERTERS SHALL BE INSTALLED ON | | SOLID | | FOUNDATIONS TO PROHIBIT SAGGING OF FUEL, EXHAUST, OR | | LUBRICATINGOIL | | PIPING AND DAMAGE TO PARTS RESULTING IN LEAKAGE AT | | JOINTS. | | | | 7.5* VIBRATION. VIBRATION ISOLATORS, AS RECOMMENDED BY | | THE | | MANUFACTURER OF THE EPS, SHALL BE INSTALLED EITHER | | BETWEEN THE | | ROTATING EQUIPMENT AND ITS SKID BASE OR BETWEEN THE | | SKID BASE | | AND THE FOUNDATION OR INERTIA BASE. | | | | PLEASE PROVIDE DETAILS OR JUSTIFY. | | | | | | | | 6) THERE ARE NO INDICATIONS OF ELECTRICAL PROTECTIONS | | | | PER NFPA 37 | | | | 4.5.4 BATTERIES, WIRING, AND ELECTRICAL DEVICES SHALL | | BE PROTECTED | | AGAINST ARCING AND ACCIDENTAL SHORTING. | | | | | | PER NFPA 110 | | | | 6.5 PROTECTION. | | 6.5.1* GENERAL. THE OVERCURRENT PROTECTIVE DEVICES IN | | THE EPSS | | SHALL BE COORDINATED TO OPTIMIZE SELECTIVE TRIPPING OF | | THE CIRCUIT | | OVERCURRENT PROTECTIVE DEVICES WHEN A SHORT CIRCUIT | | OCCURS. | | | | PLEASE PROVIDE DETAILS | | | | | | | | 7) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 8) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2019-07-17 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2019-07-17 |
Time |
16:54 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2019-07-17 |
Time |
16:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2019-06-12 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-06-12 |
Time |
13:25 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-06-12 |
Time |
13:00 |
Sent To |
|
|
Notes |
2019-06-12 13:30:56 | GAS 2ND REVIEW**DENIED** | | | | | | 1) ANSWERED** | | | | 2) ANSWERED** | | | | 3) ANSWERED** | | | | 4) ANSWERED** | | | | 5) PLEASE PROVIDE MEASUREMENTS AND ALL PIPING USED FOR | | EACH SECTION OF PIPING .SUBMIT AN ISOMETRIC DRAWING | | THAT CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF | | PIPE PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. | | | | 6) PARTIAL SEE COMMENT #5.SHOW THE TYPE OF PIPE | | MATERIAL BEING INSTALLED, ALL PIPE SIZES, AND THE | | CORRESPONDING EHD NUMBER OF THE CORRUGATED STAINLESS | | STEEL TUBING (IF APPLICABLE) FOR EACH PIPE SIZE. WPB | | AMENDMENTS TO FBC SEC.107.2.1. | | | | 7) NOT ADDRESSED. THIS IS THE SUBMITTAL PHASE PLEASE | | SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR THE GAS GENERATOR TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 | | | | NEW COMMENT'S | | | | 8) SYSTEM IS CALLED OUT AS .5LB BUT YOU SHOW A PRESSURE | | REGULATOR ON THE CONNECTION DETAIL. PLEASE CLARIFY. FBC | | 107.2.1 | | | | 9) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE | | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR | | INSTALLATION. 2014 FGC SEC.410.1, | | | | 10) PRESSURE REGULATORS SHALL BE INSTALLED PER FBC-GAS | | 410.2 | | | | (A) A TEE FITTING WITH ONE OPENING CAPPED OR PLUGGED | | SHALL BE INSTALLED BETWEEN THE MP REGULATOR AND ITS | | UPSTREAM SHUTOFF VALVE. | | | | (B) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE | | INSTALLED WITHIN 1 FOOT (304 MM) OF EITHER SIDE OF THE | | MP REGULATOR. | | | | TIM HUNT | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | CITY OF WEST PALM BEACH | | 561-248-2703 | | [email protected] | | [email protected] |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2019-04-10 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-04-10 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-04-10 |
Time |
06:56 |
Sent To |
|
|
Notes |
2019-04-10 14:32:32 | GAS 1ST REVIEW**DENIED** | | | | 1) GENERATORS ARE REQUIRED TO HAVE THERE OWN PERMIT AND | | NOT BE A SUB OFF OF MASTER PERMIT. NOTE MASTER PLAN | | DOES NOT SHOW GENERATOR | | | | 2) VALUE SEEMS LOW AND MUST INCLUDE THE COST OF THE | | GENERATOR. WPB AMEND TO THE FBC 109.3 | | | | 3) STEEL PIPING IS NOT PERMITTED UNDERGROUND. FBC-G | | 404.11.1 | | | | 4) PRIVATE PROVIDER PAPERWORK HAS NOT BEEN INCLUDE IN | | THIS SUBMITTAL. FBC 107.3.5 | | | | 5) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE | | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL | | GAS, SECS. 402.4.1, 402.4.2. | | | | 6) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL | | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE | | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR | | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. | | | | 7) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1 | | | | | | TIM HUNT | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | CITY OF WEST PALM BEACH | | 561-248-2703 | | [email protected] | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2019-07-17 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2019-07-17 |
Time |
16:54 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2019-07-03 |
Time |
15:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2019-06-13 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2019-06-13 |
Time |
08:22 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2019-05-30 |
Time |
12:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2019-04-10 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-04-10 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-04-08 |
Time |
11:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2019-07-12 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2019-07-12 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2019-07-12 |
Time |
12:37 |
Sent To |
|
|
Notes |
2019-07-17 16:53:56 | PLUMBINGL SHEET: PER THE WPB AMENDMENTS TO THE FBC, | | EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED | | BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | ACCEPTABLE FOR ENGINEERS. ADDITIONALLY, THE DIGITAL | | SIGNATURE MUST INCLUDE THE STATEMENT "SIGNED AND | | SEALED" AS PER FAC 61G15-23.004. PROVIDE CORRECTION. | | WPB FBC 107.1; FS 471/481 | 2019-07-10 06:53:26 | ELECTRICAL SHEETS: PER THE WPB AMENDMENTS TO THE FBC, | | EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED | | BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | ACCEPTABLE FOR ENGINEERS. ADDITIONALLY, THE DIGITAL | | SIGNATURE MUST INCLUDE THE STATEMENT "SIGNED AND | | SEALED" AS PER FAC 61G15-23.004. PROVIDE CORRECTION. | | WPB FBC 107.1; FS 471/481 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2019-06-13 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2019-06-13 |
Time |
08:20 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2019-06-13 |
Time |
08:20 |
Sent To |
|
|
Notes |
2019-06-13 08:22:35 | ANY NEW SHEETS PROVIDED TO BE DIGITALLY SIGNED |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2019-04-10 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-04-10 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-04-10 |
Time |
14:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2019-07-16 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2019-07-16 |
Time |
14:00 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2019-07-16 |
Time |
14:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2019-05-31 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2019-05-31 |
Time |
09:22 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2019-05-31 |
Time |
09:22 |
Sent To |
|
|
Notes |
2019-05-31 09:40:58 | FAILED | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | 1) PROVIDE THE INFORMATION ON THE GENERATOR, TO INCLUDE | | LENGTH, WIDTH AND HEIGHT DIMENSIONS (HEIGHT DIMENSION | | TO HIGHEST FEATURE OF GENERATOR). | | | | 2) PROVIDE INFORMATION ON HOW THE GENERATOR WILL BE | | SCREENED IN ACCORDANCE WITH THE CITYPLACE DRI WHICH | | REQUIRES THAT ALLL MECHANICAL EQUIPMENT BE SCREENED | | FROM PUBLIC VIEW THROUGH ANY COMBINATION OF | | LANDSCAPING, WALLS AND EQUIPMENT LOCATION. PLEASE | | PROVIDE DRAWINGS VERIFYING THAT THE PROPOSED GENERATOR | | AND ATS WILL BE SCREENED FROM PUBLIC VIEW. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | [email protected] |
|
|