Plan Review Stops For Permit 19040172
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-04-24 Cont ID  
Sent By rmcdouga Date 2019-04-24 Time 13:17 Rev Time 0.00
Received By rmcdouga Date 2019-04-24 Time 10:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-04-29 Cont ID  
Sent By rmcdouga Date 2019-04-29 Time 11:16 Rev Time 0.00
Received By rmcdouga Date 2019-04-29 Time 11:16 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-04-24 Cont ID  
Sent By rmcdouga Date 2019-04-24 Time 13:25 Rev Time 0.00
Received By rmcdouga Date 2019-04-24 Time 13:17 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-04-29 Cont ID  
Sent By rmcdouga Date 2019-04-29 Time 11:17 Rev Time 0.00
Received By rmcdouga Date 2019-04-25 Time 15:19 Sent To  
Notes
2019-04-26 15:19:54RESUB ROUTED TO THUNT/TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-24 Cont ID  
Sent By rmcdouga Date 2019-04-24 Time 13:25 Rev Time 0.00
Received By rmcdouga Date 2019-04-03 Time 10:13 Sent To  
Notes
2019-04-04 10:13:24ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-04-29 Cont ID  
Sent By tklarge Date 2019-04-29 Time 09:41 Rev Time 0.00
Received By tklarge Date 2019-04-29 Time 09:06 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-04-10 Cont ID  
Sent By thunt Date 2019-04-10 Time 14:48 Rev Time 0.00
Received By thunt Date 2019-04-10 Time 14:48 Sent To  
Notes
2019-04-10 14:49:54PLUMBING 1ST REVIEW**DENIED**
  
 1) MISSING CORRECT TDH.SUBMIT TOTAL DYNAMIC HEAD
 CALCULATIONS FOR THE MAXIMUM SYSTEM FLOW. THE MAXIMUM
 FLOW OF THE PUMP FROM ITS PUMP CURVE AND THE SIMPLIFIED
 TOTAL DYNAMIC HEAD CALCULATION IS NO LONGER ALLOWED TO
 BE USED IN DETERMINING MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES
 NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION
 OUTLET FITTING ASSEMBLY (DRAIN COVER).THE TDH
 CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
  
 SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1
  
 THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW
 THE FRICTION LOSS THROUGH ALL THE SYSTEM COMPONENTS.
 THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES,
 HEATER, FILTER, ETC. BUT THERE IS NO FRICTION LOSS
 ASSOCIATED WITH THESE ITEMS. CLARIFY.
  
 INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR THE
 PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO FBC
 SEC. 107.2.1.
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]
 [email protected]
  
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2019-04-09 Time   Rev Time 0.00
Received By mcruz Date 2019-04-09 Time 11:26 Sent To  