Plan Review Details - Permit 19031318
Plan Review Stops For Permit 19031318
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-06-12 Cont ID  
Sent By rrossano Date 2019-06-12 Time   Rev Time 0.00
Received By rrossano Date 2019-06-12 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-04-02 Cont ID  
Sent By rrossano Date 2019-04-02 Time   Rev Time 0.00
Received By rrossano Date 2019-04-02 Time   Sent To I
Notes
2019-04-02 07:13:421) PROVIDE SURVEY SHOWING ALL AFFECTED PROPERTIES.
 2) IF WORK IS BEING DONE IN MASTER ASSOCIATION OR POA
 OWNED RIGHT OF WAYS, PROVIDE WRITTEN AUTHORIZATION FROM
 EITHER/BOTH.
 3) IT DOES NOT APPEAR THAT THE PROPOSED WORK IS
 CONNECTING TO CITY OF WPB DRAINAGE FACILITIES. PROVIDE
 WRITTEN AUTHORIZATION FROM NORTHERN PALM BEACH
 IMPROVEMENT DISTRICT FOR PROPOSED STORMWATER DRAINAGE
 CONNECTION.
 4) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN
 BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-06-28 Cont ID  
Sent By tklarge Date 2019-06-28 Time 12:33 Rev Time 0.00
Received By tklarge Date 2019-06-28 Time 12:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-12 Cont ID  
Sent By lmarchan Date 2019-06-12 Time 08:51 Rev Time 0.00
Received By lmarchan Date 2019-06-07 Time 08:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-02 Cont ID  
Sent By cpuell Date 2019-04-02 Time 09:47 Rev Time 0.00
Received By cpuell Date 2019-03-28 Time 12:40 Sent To  
Notes
2019-03-29 12:40:26ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2019-06-28 Cont ID  
Sent By tklarge Date 2019-06-28 Time 12:30 Rev Time 0.00
Received By tklarge Date 2019-06-28 Time 12:30 Sent To  
Notes
2019-06-28 12:33:12THE AREA WHERE THIS PIPE IS BEING LOCATED IS DEDICATED
 TO QUAIL MEADOW AT IBIS HOMEOWNER'S ASSOCIATION. IT IS
 SHOWNIN PLAT BOOK #66 ON PAGES 100 THROUGH 102. T.LARGE

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-06-07 Cont ID  
Sent By tklarge Date 2019-06-07 Time 08:04 Rev Time 0.00
Received By tklarge Date 2019-06-07 Time 07:59 Sent To  
Notes
2019-06-07 08:04:51 
 1) IS ALL WORK BEING DONE ON PRIVATE PROPERTY OR
 EASEMENT? FBC 107.2.1. 2ND REQUEST.
  
 2) THE CONTRACT IS WRITTEN BY PRECISION LANDSCAPE WHO
 HAS NO PLUMBING OR SITE UNDERGROUND LICENSE VERIFIED
 THOUGH DBPR AND P.B.C. SUBMIT TWO COPIES OF A SCOPE OF
 WORK AND CONTRACT ON ANYTIME COMPANIES'S LETTERHEAD.
 WPB AMEND. TO FBC SEC.107.1, 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-04-01 Cont ID  
Sent By thunt Date 2019-04-01 Time 11:06 Rev Time 0.00
Received By thunt Date 2019-04-01 Time 11:06 Sent To ENG
Notes
2019-04-01 11:06:11PLUMBING REVEIW**DENIED**
  
 1) PROVIDE CALCULATIONS ON HOW YOU SIZED THIS SYSTEM.
 FBC 107.3.5
  
 2) IS ALL WORK BEING DONE ON PRIVATE PROPERTY OR
 EASEMENT? FBC 107.2.1
  
 3) THE CONTRACT IS WRITTEN BY PRECISION LANDSCAPE WHO
 HAS NO PLUMBING OR SITE UNDERGROUND LICENSE VERIFIED
 THOUGH DBPR AND P.B.C. WHO IS ACTUALLY PERFORMING THE
 WORK? FBC 107.1
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved