Plan Review Details - Permit 19031300
Plan Review Stops For Permit 19031300
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-05-09 Cont ID  
Sent By pvalenti Date 2019-05-09 Time 09:53 Rev Time 0.00
Received By pvalenti Date 2019-05-09 Time 09:53 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-05-01 Cont ID  
Sent By pvalenti Date 2019-05-01 Time 07:23 Rev Time 0.00
Received By pvalenti Date 2019-05-01 Time 07:10 Sent To  
Notes
2019-05-01 07:36:30***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561?805?6673
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 2ND BUILDING PLAN REVIEW DENIED:
  
 AS STATED ON LAST BUILDING REVIEW,
  
 THE PERMIT APPLIED FOR IS FOR AN INTERIOR DEMO. ONLY.
 IN ADDITION TO THE INTERIOR DEMOLITION OF AREA
 IDENTIFIED ON APPLICATION, THE PLANS INCLUDE DEMOLITION
 AND REMODELING OF STRUCTURAL ELEMENTS. THE STRUCTURAL
 WORK SHOULD NOT BE ON THIS PLAN AS APPLIED FOR.
  
 PLEASE EITHER:
  
 1. ADJUST THE DESCRIPTION OF WORK, ADD SPECIAL
 INSPECTOR AGREEMENT/SPECIAL INSPECTION PLAN, AND ADJUST
 THE VALUATION/PROVIDE VALUATION BREAK DOWN TO INCLUDE
 STRUCTURAL WORK.
  
 OR
  
 2. REMOVE STRUCTURAL WORK FROM PLAN AND APPLY FOR
 SEPERATE COMMERCIAL PERMIT FOR STRUCTURAL WORK.
  
 THE COMMENT RESPONSE STATES THAT OPTION #1 HAS BEEN
 SELECTED.
  
 PLEASE ADJUST THE VALUATION OF PERMIT INCLUDING THE
 STRUCTURAL BREAK DOWN, SUBMIT THE REVISED PLANS WITH
 THE THE SPECIAL INSPECTOR PLAN INCLUDED, AND SUBMIT THE
 SPECIAL INSPECTOR AGREEMENT.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-04-04 Cont ID  
Sent By pvalenti Date 2019-04-04 Time 10:01 Rev Time 0.00
Received By pvalenti Date 2019-04-04 Time 10:01 Sent To  
Notes
2019-04-04 10:59:39***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING PLAN REVIEW DENIED:
  
 THE PERMIT APPLIED FOR IS FOR AN INTERIOR DEMO. ONLY.
 IN ADDITION TO THE INTERIOR DEMOLITION OF AREA
 IDENTIFIED ON APPLICATION, THE PLANS INCLUDE DEMOLITION
 AND REMODELING OF STRUCTURAL ELEMENTS. THE STRUCTURAL
 WORK SHOULD NOT BE ON THIS PLAN AS APPLIED FOR.
  
 PLEASE EITHER:
 1. ADJUST THE DESCRIPTION OF WORK, ADD SPECIAL
 INSPECTOR AGREEMENT/SPECIAL INSPECTION PLAN, AND ADJUST
 THE VALUATION/PROVIDE VALUATION BREAK DOWN TO INCLUDE
 STRUCTURAL WORK.
 OR
 2. REMOVE STRUCTURAL WORK FROM PLAN AND APPLY FOR
 SEPERATE COMMERCIAL PERMIT FOR STRUCTURAL WORK.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-05-09 Cont ID  
Sent By jleahy Date 2019-05-09 Time 10:04 Rev Time 0.00
Received By jleahy Date 2019-05-09 Time 10:04 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-05-01 Cont ID  
Sent By jleahy Date 2019-05-01 Time 08:36 Rev Time 0.00
Received By jleahy Date 2019-05-01 Time 08:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-04-16 Cont ID  
Sent By jleahy Date 2019-04-16 Time 15:17 Rev Time 0.00
Received By jleahy Date 2019-04-16 Time 15:17 Sent To  
Notes
2019-04-16 15:18:35NEED AN ELECTRICAL PERMIT JLEAHY

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-04-29 Cont ID  
Sent By pleduc Date 2019-04-29 Time   Rev Time 0.00
Received By pleduc Date 2019-04-29 Time 14:32 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-04-08 Cont ID  
Sent By pleduc Date 2019-04-08 Time   Rev Time 0.00
Received By pleduc Date 2019-04-08 Time 15:12 Sent To E
Notes
2019-04-08 15:26:10THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE IS NO INDICATION OF THE SCOPE OF WORK.
  
 IS IT THE INTENT TO RETURN THIS SPACE INTO AN OPEN
 SPACE FOR FUTURE BUILDOUT?
  
 PLEASE PROVIDE A DETAILED SCOPE OF WORK.
  
  
  
 2) SHEET A 2 - THERE ARE INDICATION OF REMOVING WALLS
 IN AN ADJACENT SPACE WHICH ON SHEET A 2 IS SHADED/NOT
 INCLUDED IN THIS PROJECT.
  
 PLEASE REVIEW AND CLARIFY/JUSTIFY.
  
  
  
 3) THERE IS NO INDCATION OF FIRE ALARM DEMO/WORK.
  
 THE FIRE ALARM SYSTEM SHALL BE MAINTAINED THROUGHOUT
 CONSTRUCTION.
  
 ANY WORK, DEMO/INSTALL, OF ANY FIRE ALARM
 DEVICE/EQUIPMENT SHALL BE DONE UNDER SEPARATE PERMIT
 AND SHOP DRAWINGS.
  
 PLEASE PROVIDE AN APPLICABLE NOTE.
  
  
  
 3) THERE IS INDICATIONS OF FIRE SPRINKLER WORK UNDER
 SEPARATE SHOP DRAWINGS.
  
 THE FIRE SPRINKLER SYSTEM SHALL BE FUNCTIONAL AND
 MAINTAINED THROUGHTOUT THE DEMO AND CONSTRUCTION
 PERIODS.
  
 PLEASE PROVIDE AN APPLICABLE NOTE.
  
  
  
 5) SHEET S 1 - THERE IS NOT A CLEAR INDICATION THAT THE
 STAIRS ARE BEING REMOVED. IT APPEARS AS THOUGH THE
 STAIRS REMAIN IN THE NEW FLOOR FRAMING LAYOUT.
  
 IS IT THE INTENT TO REMOVE THE EXISTING STAIRS?
  
 PLEASE REVIEW AND REMOVE THE STAIR STEPS/TREADS ON ANY
 NEW LAYOUTS.
  
  
  
 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
  
 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-05-09 Cont ID  
Sent By jleahy Date 2019-05-09 Time 10:05 Rev Time 0.00
Received By jleahy Date 2019-05-07 Time 09:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-05-01 Cont ID  
Sent By jleahy Date 2019-05-01 Time 10:00 Rev Time 0.00
Received By jleahy Date 2019-04-25 Time 15:49 Sent To  
Notes
2019-04-26 15:49:20RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-16 Cont ID  
Sent By jleahy Date 2019-04-16 Time 15:19 Rev Time 0.00
Received By jleahy Date 2019-03-28 Time 12:47 Sent To  
Notes
2019-03-29 12:47:30SHILL

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2019-04-04 Cont ID  
Sent By pvalenti Date 2019-04-04 Time 10:01 Rev Time 0.00
Received By pvalenti Date 2019-04-04 Time 10:01 Sent To  
Notes
***NONE***