Plan Review Details - Permit 19021379
Plan Review Stops For Permit 19021379 |
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2019-03-15 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-03-15 |
Time |
06:35 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-03-15 |
Time |
06:35 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2019-03-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2019-03-04 |
Time |
05:20 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2019-03-04 |
Time |
04:56 |
Sent To |
|
|
Notes |
2019-03-04 05:15:00 | 1) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL | | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS | | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) | | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES | | G2413.4 (1 ) THROUGH G2413.4 (21). | | 2) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM | | ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 | | THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. | | 3) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL | | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) | | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, | | G2413.1, G2413.2, & G2413.3. | | 4) SHOW THE SIZE OF THE PIPE AND THE PIPE MATERIAL AT | | THE OUTLET OF THE GAS METER. WPB AMEND. TO FBC SEC. | | 107.2.1. | | 5) SIZE THE GALVANIZED LINE TO THE STOVE, | | 6) SUBMIT A PLAN VIEW OF THE STRUCTURE SHOWING THE | | LOCATION OF THE UNDERGROUND PE LINES. WPB AMEND. TO FBC | | SEC. 107.2.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2019-03-15 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-03-15 |
Time |
06:35 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-03-13 |
Time |
14:31 |
Sent To |
|
|
Notes |
2019-03-14 14:31:36 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2019-03-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2019-03-04 |
Time |
05:20 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2019-02-28 |
Time |
10:05 |
Sent To |
|
|
Notes |
2019-03-01 10:06:14 | PLUMB <5K |
|
|
|