Plan Review Details - Permit 19011359
Plan Review Stops For Permit 19011359
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-02-14 Cont ID  
Sent By rmcdouga Date 2019-02-14 Time 09:27 Rev Time 0.00
Received By rmcdouga Date 2019-02-14 Time 09:27 Sent To B
Notes
2019-02-24 16:58:371) ) THE PLANS INDICATE AN EXISTING GAS METER AND CITY
 RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS ADDRESS.
 THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED
 INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE
 EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE
 EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM
 THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD
 OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO
 EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH
 OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.
 2) EXISTING PLANS ON FILE WITH THE CITY SHOW THE TOTAL
 BTU ON THIS GAS SYSTEM AS 829,000 BTU'S AND THE
 SUBMITTED GAS PLAN SHOWS A TOTAL BTU LOAD OF 725,000
 BTU'S. REVISE THE BTU LOAD ON THE SUBMITTED GAS PLAN.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-02-22 Cont ID  
Sent By jleahy Date 2019-02-22 Time 11:04 Rev Time 0.00
Received By jleahy Date 2019-02-22 Time 11:04 Sent To G
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2019-03-14 Cont ID  
Sent By tklarge Date 2019-03-14 Time 06:27 Rev Time 0.00
Received By tklarge Date 2019-03-14 Time 05:47 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-02-24 Cont ID  
Sent By tklarge Date 2019-02-24 Time 16:58 Rev Time 0.00
Received By tklarge Date 2019-02-24 Time 16:38 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-03-14 Cont ID  
Sent By tklarge Date 2019-03-14 Time 06:27 Rev Time 0.00
Received By tklarge Date 2019-03-12 Time 13:06 Sent To  
Notes
2019-03-13 13:06:12RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-02-24 Cont ID  
Sent By tklarge Date 2019-02-24 Time 16:59 Rev Time 0.00
Received By tklarge Date 2019-01-31 Time 11:13 Sent To  
Notes
2019-02-01 11:14:05ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-02-06 Cont ID  
Sent By mcruz Date 2019-02-06 Time 14:09 Rev Time 0.00
Received By mcruz Date 2019-02-06 Time 14:05 Sent To  
Notes
***NONE***