Plan Review Details - Permit 18120964
Plan Review Stops For Permit 18120964
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-01-09 Cont ID  
Sent By RRossano Date 2019-01-09 Time   Rev Time  
Received By rrossano Date 2019-01-09 Time   Sent To I
Notes
2019-01-09 07:57:37PASSED WITH PROVISOS:
 PROVISOS FOR DRIVEWAY WITH PAVERS
 1) FOR DRIVEWAYS WITHIN THE CITY OF WPB WE HIGHLY
 RECOMMEND THE USE OF ASTM C-1272 STANDARD FOR PAVERS,
 FOR THIS TYPE OF SPECIFICATION THE THICKNESS FOR PAVERS
 IS RECOMMEND TO BE 3-1/8". (RIGHT-OF-WAY PORTION OF
 DRIVEWAY APRON).
 2) "F" TYPE PAVERS ARE RECOMMENDED WHEN USING A
 FLEXIBLE BASE (SAND AGGREGATE, COMPACTED GRAVEL BASE,
 ETC. ). FOR TYPE "F" PAVERS SHOULD BE NOT LESS THAN 2
 5/8" IN THICKNESS. REF: ARCHITECTURAL GRAPHIC STANDARDS
 FOR RESIDENTIAL CONSTRUCTION, 2ND EDITION.
 3) THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF
 PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY. THE AGREEMENT MUST BE RECORDED AT PALM BEACH
 COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED
 COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561)
 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS
 TO BE RECORDED PRIOR TO FINAL SIGN OFF.
 4) CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
 CALCULATION FOR NEW DRIVEWAY IN CONFORMANCE WITH
 MUNICIPAL CODE REQUIRES THAT 75% OF YOUR FRONT YARD BE
 LANDSCAPE AREA (GREEN AREA). THE REMAINING S.F. MAY BE
 UTILIZED FOR DRIVEWAY. IF USING PAVERS ON SAND BASE,
 EXTRA S.F. MAY BE GRANTED. FOR QUESTIONS ON THE SUBJECT
 MATTER CONTACT:
  
 CITY OF WPB PLANNING DEPT.
 401 CLEMATIS STREET, 2ND FLOOR
 W.P.B., FL 33401 OR
 P.O. BOX 3366
 W.P.B., FL 33402
 PHONE: 561.822.1435
  
 COMMENT UPDATE AS OF 1/22/19: DRIVEWAY AGREEMENT HAS
 BEEN RECORDED BY OFFICE OF CLERK & COMPTROLLER ON
 1/18/19, CFN20190020686, OR BK 30370 PG 1108-1109

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-01-09 Cont ID  
Sent By cpuell Date 2019-01-09 Time 16:30 Rev Time 0.00
Received By cpuell Date 2018-12-28 Time 15:47 Sent To  
Notes
2018-12-28 15:47:39ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-01-08 Cont ID  
Sent By mcruz Date 2019-01-08 Time 11:42 Rev Time 0.00
Received By mcruz Date 2019-01-08 Time 11:34 Sent To ENG
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved