Plan Review Stops For Permit 18120193 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-12 |
Time |
12:26 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-12 |
Time |
10:12 |
Sent To |
|
|
Notes |
2018-12-10 17:07:11 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-REVISE/CLARIFY DETAIL 2/S001A KEYED AT THE SOUTH WALL | | NEXT TO DETAIL 3/S001A. DETAIL 2/S001A HAVE A CENTERED | | FOOTING NOT OFFSET. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-12-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-06 |
Time |
18:58 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-06 |
Time |
17:01 |
Sent To |
|
|
Notes |
2018-12-06 18:58:25 | RESIDENTIAL (R3) SITE WALL BUILDING REVIEW COMMENTS | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | NOTE: | | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO | | MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER | | THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID | | CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR | | TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME | | OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT | | ISSUANCE. | | | | | | 1- SHEET 006 S-001A: | | A) MISSING DETAIL 4/S-001A KEYED ON PROPOSED PERIMETER | | SITE WALL PLAN ON SHEET 003 A-003. | | SEC. 107.2.1 CITY AMENDMENTS. | | | | B) MISSING DETAIL 5/S-001A KEYED ON PROPOSED PERIMETER | | SITE WALL PLAN ON SHEET 003 A-003. | | SEC. 107.2.1 CITY AMENDMENTS. | | | | 3- PROPOSED PERIMETER SITE WALL PLAN ON SHEET 003 A-003 | | IS KEYING DETAIL 2/S001A AT THE SOUTH WALL. THIS DETAIL | | DOESN'T SEEM TO APPLY IN THIS AREA. REVISE/CLARIFY AS | | REQUIRED. | | SEC. 107.2.1 CITY AMENDMENTS. | | | | 4- THIS IS A DIGITAL SUBMITTAL. PROVIDE ALL STRUCTURAL | | ENGINEER'S DRAWINGS WITH DIGITAL SIGNATURE OR PROVIDE | | HARD COPIES WITH ORIGINAL SEAL AND SIGNATURE. CHAPTER | | 471 F.S. | | | | 5- THIS IS A DIGITAL SUBMITTAL. PROVIDE SOIL TEST | | REPORT WITH DIGITAL SIGNATURE OR PROVIDE HARD COPIES | | WITH ENGINEER'S ORIGINAL SEAL AND SIGNATURE. CHAPTER | | 471 F.S. | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE/VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | PLEASE DON'T STAPLE OLD DRAWINGS. SUBMIT OLD DRAWINGS | | FOR REFERENCE. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2019-08-29 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2019-08-29 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2019-08-29 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2018-12-11 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2018-12-11 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2018-12-11 |
Time |
|
Sent To |
B |
|
Notes |
2018-12-11 09:47:10 | PROVISO: WALL WILL EXCLUDE THE WESTERN PORTION THAT | | RUNS NORTH AND SOUTH PARALLEL TO CITY WATER MAIN AND | | SANITARY SEWER. CALL 811 FOR LOCATES TO KEEP SAFE | | DISTANCE FROM EXSITING WATER AND SEWER. | | PLEASE CONTACT CITY OF WPB UTILITIES DISPATCH | | (561)822-2222 SHOULD YOU NEED FIELD ASSISTANCE. AN | | EXHIBIT IT ATTACHED SHOWING CITY UTILITIES. . | | | | MANUEL GONZALEZ | | CITY OF WPB ENGINEERING | | [email protected] | | (561)818-1322 | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2018-12-10 |
|
|
Cont ID |
|
Sent By |
RRossano |
Date |
2018-12-10 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2018-12-10 |
Time |
|
Sent To |
I |
|
Notes |
2018-12-10 12:33:18 | THERE ARE WATER AND SEWER UTILITY LINES DIRECTLY | | BENEATH THE PROPOSED WALL ON THE WEST SIDE OF THE | | PROPERTY. COORDINATE DIRECTLY WITH THE PUBLIC UTILITIES | | DEPARTMENT. | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | CONCERNS, THANKS. | | | | RICK ROSSANO | | PROJECT COORDINATOR | | ENGINEERING SERVICES DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1098 | | FAX: (561) 494-1116 | | MOBILE: (561) 246-9525 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | | | MANNY GONZALEZ | | SENIOR ENGINEERING PROJECT COORDINATOR | | ENGINEERING SERVICES DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2018-12-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-12-06 |
Time |
10:40 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-12-06 |
Time |
10:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-12 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-12 |
Time |
15:54 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2018-12-12 |
Time |
15:48 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2018-12-10 |
Time |
14:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-12-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-07 |
Time |
11:22 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-07 |
Time |
11:14 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-12 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-12 |
Time |
15:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-12 |
Time |
12:28 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-12 |
Time |
12:28 |
Sent To |
|
|
Notes |
2018-12-12 12:28:50 | DOCUMENTS SUBMITTED ARE NOT DIGITALLY SIGNED. AFTER ALL | | PLAN REVIEWS HAVE PASSED, SUBMIT ONE PAPER ORIGINAL AT | | THE BUILDING DIVISION. THIS INCLUDES THE FOLLOWING | | DOCUMENTS: | | | | 1. SOIL TEST REPORT |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2018-12-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-12-07 |
Time |
11:21 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-12-07 |
Time |
11:21 |
Sent To |
|
|
Notes |
2018-12-06 17:32:19 | | | | | DOCUMENTS SUBMITTED ARE NOT DIGITALLY SIGNED. AFTER ALL | | PLAN REVIEWS HAVE PASSED, SUBMIT ONE PAPER ORIGINAL AT | | THE BUILDING DIVISION. THIS INCLUDES THE FOLLOWING | | DOCUMENTS: | | | | 1. STRUCTURAL DRAWINGS. | | 2- SOIL TEST REPORT |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-12-12 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-12-12 |
Time |
13:58 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-12-12 |
Time |
13:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2018-12-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-12-06 |
Time |
10:40 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-12-06 |
Time |
10:40 |
Sent To |
|
|
Notes |
2018-12-06 10:49:24 | POOL EQUIPTMENT SHALL NOT BE IN FRONT SETBACK. |
|
|