Plan Review Details - Permit 18120193
Plan Review Stops For Permit 18120193
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-12-12 Cont ID  
Sent By jgomez Date 2018-12-12 Time 12:26 Rev Time 0.00
Received By jgomez Date 2018-12-12 Time 10:12 Sent To  
Notes
2018-12-10 17:07:11BUILDING REVIEW APPROVED WITH PROVISO:
 1-REVISE/CLARIFY DETAIL 2/S001A KEYED AT THE SOUTH WALL
 NEXT TO DETAIL 3/S001A. DETAIL 2/S001A HAVE A CENTERED
 FOOTING NOT OFFSET.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-06 Time 18:58 Rev Time 0.00
Received By jgomez Date 2018-12-06 Time 17:01 Sent To  
Notes
2018-12-06 18:58:25RESIDENTIAL (R3) SITE WALL BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO
 MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER
 THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID
 CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR
 TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME
 OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT
 ISSUANCE.
  
  
 1- SHEET 006 S-001A:
 A) MISSING DETAIL 4/S-001A KEYED ON PROPOSED PERIMETER
 SITE WALL PLAN ON SHEET 003 A-003.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 B) MISSING DETAIL 5/S-001A KEYED ON PROPOSED PERIMETER
 SITE WALL PLAN ON SHEET 003 A-003.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 3- PROPOSED PERIMETER SITE WALL PLAN ON SHEET 003 A-003
 IS KEYING DETAIL 2/S001A AT THE SOUTH WALL. THIS DETAIL
 DOESN'T SEEM TO APPLY IN THIS AREA. REVISE/CLARIFY AS
 REQUIRED.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 4- THIS IS A DIGITAL SUBMITTAL. PROVIDE ALL STRUCTURAL
 ENGINEER'S DRAWINGS WITH DIGITAL SIGNATURE OR PROVIDE
 HARD COPIES WITH ORIGINAL SEAL AND SIGNATURE. CHAPTER
 471 F.S.
  
 5- THIS IS A DIGITAL SUBMITTAL. PROVIDE SOIL TEST
 REPORT WITH DIGITAL SIGNATURE OR PROVIDE HARD COPIES
 WITH ENGINEER'S ORIGINAL SEAL AND SIGNATURE. CHAPTER
 471 F.S.
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE/VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 PLEASE DON'T STAPLE OLD DRAWINGS. SUBMIT OLD DRAWINGS
 FOR REFERENCE.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2019-08-29 Cont ID  
Sent By rrossano Date 2019-08-29 Time   Rev Time 0.00
Received By rrossano Date 2019-08-29 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2018-12-11 Cont ID  
Sent By mgonzale Date 2018-12-11 Time   Rev Time 1.00
Received By mgonzale Date 2018-12-11 Time   Sent To B
Notes
2018-12-11 09:47:10PROVISO: WALL WILL EXCLUDE THE WESTERN PORTION THAT
 RUNS NORTH AND SOUTH PARALLEL TO CITY WATER MAIN AND
 SANITARY SEWER. CALL 811 FOR LOCATES TO KEEP SAFE
 DISTANCE FROM EXSITING WATER AND SEWER.
 PLEASE CONTACT CITY OF WPB UTILITIES DISPATCH
 (561)822-2222 SHOULD YOU NEED FIELD ASSISTANCE. AN
 EXHIBIT IT ATTACHED SHOWING CITY UTILITIES. .
  
 MANUEL GONZALEZ
 CITY OF WPB ENGINEERING
 [email protected]
 (561)818-1322
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-12-10 Cont ID  
Sent By RRossano Date 2018-12-10 Time   Rev Time 0.00
Received By rrossano Date 2018-12-10 Time   Sent To I
Notes
2018-12-10 12:33:18THERE ARE WATER AND SEWER UTILITY LINES DIRECTLY
 BENEATH THE PROPOSED WALL ON THE WEST SIDE OF THE
 PROPERTY. COORDINATE DIRECTLY WITH THE PUBLIC UTILITIES
 DEPARTMENT.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2018-12-06 Cont ID  
Sent By fmittner Date 2018-12-06 Time 10:40 Rev Time 0.00
Received By fmittner Date 2018-12-06 Time 10:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-12-12 Cont ID  
Sent By jgomez Date 2018-12-12 Time 16:05 Rev Time 0.00
Received By jgomez Date 2018-12-12 Time 15:54 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-12 Cont ID  
Sent By lmarchan Date 2018-12-12 Time 15:48 Rev Time 0.00
Received By lmarchan Date 2018-12-10 Time 14:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-07 Time 11:22 Rev Time 0.00
Received By jgomez Date 2018-12-07 Time 11:14 Sent To I
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2018-12-12 Cont ID  
Sent By jgomez Date 2018-12-12 Time 16:05 Rev Time 0.00
Received By jgomez Date 2018-12-12 Time 15:56 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2018-12-12 Cont ID  
Sent By jgomez Date 2018-12-12 Time 12:28 Rev Time 0.00
Received By jgomez Date 2018-12-12 Time 12:28 Sent To  
Notes
2018-12-12 12:28:50DOCUMENTS SUBMITTED ARE NOT DIGITALLY SIGNED. AFTER ALL
 PLAN REVIEWS HAVE PASSED, SUBMIT ONE PAPER ORIGINAL AT
 THE BUILDING DIVISION. THIS INCLUDES THE FOLLOWING
 DOCUMENTS:
  
 1. SOIL TEST REPORT

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-07 Time 11:21 Rev Time 0.00
Received By jgomez Date 2018-12-07 Time 11:21 Sent To  
Notes
2018-12-06 17:32:19 
  
 DOCUMENTS SUBMITTED ARE NOT DIGITALLY SIGNED. AFTER ALL
 PLAN REVIEWS HAVE PASSED, SUBMIT ONE PAPER ORIGINAL AT
 THE BUILDING DIVISION. THIS INCLUDES THE FOLLOWING
 DOCUMENTS:
  
 1. STRUCTURAL DRAWINGS.
 2- SOIL TEST REPORT

Review Stop Z ZONING
Rev No 2 Status P Date 2018-12-12 Cont ID  
Sent By fmittner Date 2018-12-12 Time 13:58 Rev Time 0.00
Received By fmittner Date 2018-12-12 Time 13:58 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-12-06 Cont ID  
Sent By fmittner Date 2018-12-06 Time 10:40 Rev Time 0.00
Received By fmittner Date 2018-12-06 Time 10:40 Sent To  
Notes
2018-12-06 10:49:24POOL EQUIPTMENT SHALL NOT BE IN FRONT SETBACK.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved