Plan Review Details - Permit 18110961
Plan Review Stops For Permit 18110961
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-12-21 Cont ID  
Sent By rmcdouga Date 2018-12-21 Time 13:15 Rev Time 0.00
Received By rmcdouga Date 2018-12-21 Time 13:15 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-12-13 Cont ID  
Sent By rmcdouga Date 2018-12-13 Time 07:40 Rev Time 0.00
Received By rmcdouga Date 2018-12-13 Time 07:40 Sent To I
Notes
2018-12-13 07:43:31PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEER'S HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED ON THE GENERATOR PAD PLANS. FAC 61G15-23.003
 PROCEDURES FOR PHYSICALLY SIGNING AND SEALING PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
 ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN
 ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY
 SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE
 PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE'S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-12-04 Cont ID  
Sent By jleahy Date 2018-12-04 Time 18:31 Rev Time 0.00
Received By jleahy Date 2018-12-04 Time 18:28 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2018-12-10 Cont ID  
Sent By tklarge Date 2018-12-10 Time 13:41 Rev Time 0.00
Received By tklarge Date 2018-12-10 Time 13:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-21 Cont ID  
Sent By rmcdouga Date 2018-12-21 Time 13:15 Rev Time 0.00
Received By rmcdouga Date 2018-12-19 Time 11:46 Sent To  
Notes
2018-12-20 11:46:23RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-13 Cont ID  
Sent By rmcdouga Date 2018-12-13 Time 07:41 Rev Time 0.00
Received By rmcdouga Date 2018-11-21 Time 09:16 Sent To Z
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-11-30 Cont ID  
Sent By rmcdouga Date 2018-12-13 Time 07:41 Rev Time 0.00
Received By mcruz Date 2018-11-30 Time 11:57 Sent To E
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved