Plan Review Details - Permit 18101419
Plan Review Stops For Permit 18101419
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-11-08 Cont ID  
Sent By rrossano Date 2018-11-08 Time   Rev Time  
Received By rrossano Date 2018-11-08 Time   Sent To I
Notes
2018-11-08 06:58:00PASSED WITH PROVISOS:
 1) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. INFORMATION CAN BE
 FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 IF USING PAVERS IN THE APRON AREA OF THE PROPOSED
 DRIVEWAY, YOU MUST EXECUTE A PAVER DRIVEWAY AGREEMENT,
 WHICH CAN BE OBTAINED HERE: HTTP://WPB.ORG/DEPARTMENTS/
 ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 PROVISOS FOR DRIVEWAY WITH PAVERS
 1) FOR DRIVEWAYS WITHIN THE CITY OF WPB WE HIGHLY
 RECOMMEND THE USE OF ASTM C-1272 STANDARD FOR PAVERS,
 FOR THIS TYPE OF SPECIFICATION THE THICKNESS FOR PAVERS
 IS RECOMMEND TO BE 3-1/8". (RIGHT-OF-WAY PORTION OF
 DRIVEWAY APRON).
 2) "F" TYPE PAVERS ARE RECOMMENDED WHEN USING A
 FLEXIBLE BASE (SAND AGGREGATE, COMPACTED GRAVEL BASE,
 ETC. ). FOR TYPE "F" PAVERS SHOULD BE NOT LESS THAN 2
 5/8" IN THICKNESS. REF: ARCHITECTURAL GRAPHIC STANDARDS
 FOR RESIDENTIAL CONSTRUCTION, 2ND EDITION.
 3) THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF
 PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY. THE AGREEMENT MUST BE RECORDED AT PALM BEACH
 COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED
 COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561)
 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS
 TO BE RECORDED PRIOR TO FINAL SIGN OFF.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-11-08 Cont ID  
Sent By cpuell Date 2018-11-08 Time 13:59 Rev Time 0.00
Received By cpuell Date 2018-10-31 Time 14:04 Sent To  
Notes
2018-11-01 14:04:57ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-11-07 Cont ID  
Sent By mcruz Date 2018-11-07 Time 11:01 Rev Time 0.00
Received By mcruz Date 2018-11-07 Time 10:57 Sent To ENG
Notes
***NONE***