Plan Review Details - Permit 18100819
Plan Review Stops For Permit 18100819
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2018-11-06 Cont ID  
Sent By jleahy Date 2018-11-06 Time 15:03 Rev Time 0.00
Received By jleahy Date 2018-11-06 Time 15:03 Sent To I
Notes
2018-11-06 15:03:50SLAB REVIEW DONE UNDER ELECTRICAL REVIEW JLEAHY

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-11-06 Cont ID  
Sent By jleahy Date 2018-11-06 Time 15:00 Rev Time 0.00
Received By jleahy Date 2018-11-06 Time 15:00 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2018-12-11 Cont ID  
Sent By tklarge Date 2018-12-04 Time 09:39 Rev Time 0.00
Received By jleahy Date 2018-12-04 Time 06:24 Sent To I
Notes
2018-12-11 11:31:10PERMIT HAS BEEN SEPARATED FROM MASTER SO CONTRACTOR CAN
 KEEP APPOINTMENT WITH FPL JLEAHY
2018-12-04 09:18:251) REMOVE ALL OLD DOCUMENTS FROM THIS REVIEW PACKAGE
 AND COMPILE THE PLANS INTO TWO CCOMPLETE SETS FOR
 REVIEW. THERE ARE CURRENTLY 4 COPIES OF PLANS &
 SPECIFICATIONS IN THE PERMIT PACKAGE. WPB AMEND. TO FBC
 SECS. 107.1, 107.2.1.
 2) SHOW THE SIZE OF THE UNDERGROUND PE LINE TO THE
 GENERATOR ON THE REVISED GAS DRAWING.
 3) SIZE THE GAS LINE DOWNSTREAM OF THE REGULATOR FOR
 THE COOKTOP AND SHOW THE DISTANCE FROM THE REGULATOR TO
 THE APPLIANCE AND THE TYPE OF PIPE.
 4) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE (1) FOOT OF EITHER SIDE OF THE MP
 REGULATOR. 2017 FBC-RESIDENTIAL SEC. G2421.2 (7), 2017
 FBC-FUEL GAS SEC. 410.2 (7).
 5) SHOW THE LOCATION OF THE MP REGULATORS FOR THE
 TANKLESS WATER HEATER AND THE DRYER.
 6) SHOW THE TYPE OF PIPE TO THE GAS DRYER.
 7) SHOW THE DISTANCE FROM THE GAS METER TO THE MOST
 REMOTE REGULATOR ON THE SYSTEM. 2017 FBC-FUEL GAS
 SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1,
 G2413.4.2.
 8) THE GENERATOR SHALL BE LOCATED A MINIMUM 10 FEET
 FROM ALL BUILDING OPENINGS UNLESS THE MANUFACTURER'S
 INSTALLATION MANUAL ALLOWS A LESSER DISTANCE.
 9) THE GENERATOR SPECS SHOW THE MAXIMUM BTU LOAD OF THE
 GENERATOR AS 281,000 YET THE GAS DRAWING SHOWS THE
 GENERATOR BTU LOAD AS 330,000. CLARIFY.
  
 NOTE: CITY RECORDS DO NOT SHOW ANY PREVIOUS PERMITS FOR
 GAS INSTALLATION AT THIS ADDRESS.THE EXISTING SYSTEM
 AND APPLIANCES CAN EITHER BE INCLUDED IN THIS SCOPE OF
 WORK OR A SEPARATE PERMIT WILL BE REQUIRED FOR THE
 EXISTING SYSTEM. SOMEONE NEEDS TO ADDRESS THIS ISSUE
 AND SUBMIT A RESPONSE AS TO WHAT ACTION WILL BE TAKEN.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-11-02 Cont ID  
Sent By tklarge Date 2018-11-02 Time 10:29 Rev Time 0.00
Received By jleahy Date 2018-11-02 Time 09:45 Sent To  
Notes
2018-11-02 10:29:271) THE SUBMITTED GAS PLAN NOTES AN EXISTING GAS METER.
 CITY RECORDS DO NOT SHOW ANY PREVIOUS PERMITS FOR GAS
 INSTALLATION AT THIS ADDRESS.THE EXISTING SYSTEM WILL
 HAVE TO BE PERMITTED.FBC 105.1.
 2) THE PLANS INDICATE AN EXISTING GAS METER AND CITY
 RECORDS DO NOT SHOW AN EXISTING GAS SYSTEM FOR THIS
 ADDRESS. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST
 BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO
 ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF
 UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO
 ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING
 RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING
 APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE
 SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3.
 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR ) TO THE MOST REMOTE OUTLET IN THE
 BUILDING AND / OR SYSTEM PER THE 2017 FBC-FUEL GAS
 SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1,
 G2413.4.2.
 4) THE GENERATOR SHALL BE LOCATED A MINIMUM OF 10 FT.
 FROM BUILDING OPENINGS OR IN ACCORDANCE WITH THE
 MANUFACTURER'S INSTALLATION MANUAL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-04 Cont ID  
Sent By jleahy Date 2018-12-11 Time 11:31 Rev Time 0.00
Received By tklarge Date 2018-11-13 Time 10:51 Sent To  
Notes
2018-11-14 10:51:52RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-11-06 Cont ID  
Sent By jleahy Date 2018-11-06 Time 15:03 Rev Time 0.00
Received By jleahy Date 2018-10-17 Time 14:30 Sent To  
Notes
2018-10-18 14:30:53ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-10-30 Cont ID  
Sent By mcruz Date 2018-10-30 Time 14:05 Rev Time 0.00
Received By mcruz Date 2018-10-30 Time 14:01 Sent To  
Notes
***NONE***