Plan Review Details - Permit 18090632
Plan Review Stops For Permit 18090632
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-01-15 Cont ID  
Sent By rmcdouga Date 2019-01-15 Time 12:14 Rev Time 0.00
Received By rmcdouga Date 2019-01-14 Time 19:05 Sent To  
Notes
2019-01-15 12:24:56SPOKE TO THE ARCHITECT, BRENT WOODS ON THE TELEPHONE.
 HE AGREED TO ALLOW ME TO REDINE THE PRODUCT APPROVAL
 NUMBERS AND PRESSURES FOR THE DOORS TO THE GENERATOR
 ROOM AND THE FIRE COMMAND ROOM TO MATCH THE PRODUCT
 APPROVALS THAT HE APPROVED AND SUBMITTED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-12-10 Cont ID  
Sent By rmcdouga Date 2018-12-10 Time 08:45 Rev Time 0.00
Received By rmcdouga Date 2018-12-10 Time 07:40 Sent To M
Notes
2018-12-10 08:45:51PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
 NEW COMMENTS WERE CREATED BY THE ADDITIONAL DRAWINGS
 THAT WERE SUBMITTED.
  
 1) PLANS SHOW A DOUBLE OUTSWING DOOR (002) FOR THE
 GENERATOR ROOM AND THE DOOR SCHEDULE ON SHEET A-6.01
 LISTS DOOR (002) AS A 3' WIDE DOOR. CLARIFY. FBC
 107.2.1
  
 2) DOORS (001) AND (003) TO THE FIRE COMMAND ROOM ARE
 SINGLE DOORS AND ARE SPECIFIED AS TYPE 5 DOORS IN THE
 SCHEDULE ON A-6.01. THE TYPE 5 DOOR IS A DOUBLE DOOR.
 THE REMARKS FOR DOOR (003) IN THE SCHEDULE STATE THAT
 THIS IS THE DOOR TO THE MAINTENANCE ROOM, NOT THE FIRE
 COMMAND ROOM. PLEASE CORRECT. FBC 107.2.1
  
 3) PRODUCT APPROVALS ARE REQUIRED TO BE SUBMITTED FOR
 THE DOORS AND LOUVERS IN THE EXTERIOR WALLS. FBC
 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS FOR
 THOSE PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001
 PER FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
 PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH FL OR NOA
 NUMBERS INCLUDING INSTALLATION INSTRUCTIONS AND MAXIMUM
 DESIGN PRESSURES FOR EACH REGULATED PRODUCT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-09-26 Cont ID  
Sent By rmcdouga Date 2018-09-26 Time 18:11 Rev Time 0.00
Received By rmcdouga Date 2018-09-26 Time 18:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-12-13 Cont ID  
Sent By fgiaquin Date 2018-12-13 Time 07:22 Rev Time 0.00
Received By fgiaquin Date 2018-12-13 Time 06:39 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-09-28 Cont ID  
Sent By fgiaquin Date 2018-09-28 Time 10:04 Rev Time 0.00
Received By fgiaquin Date 2018-09-28 Time 05:33 Sent To FIRE
Notes
2018-09-28 09:23:02ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. CONDUIT SIZE FROM GENERATOR TO ATS NOT ANNOTATED ON
 PLAN. PLEASE PROVIDE CORRECTION. FBC 107.2.1
  
 2. WIRING METHOD AND CONDUIT SIZE FROM GENERATOR TO
 FIRE PUMP CONTROLLER NOT ANNOTATED ON PLAN. WRING
 METHOD MUST COMPLY WITH 695.6A2. PLEASE PROVIDE
 CORRECTION. FBC 107.2.1
  
 3. WIRE SIZE FROM GENERATOR TO ATS NOT ANNOTATED ON
 PLAN. PLEASE PROVIDE CORRECTION. FBC 107.2.1
  
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WPB
 [email protected]
 CELL: 561-657-1653
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date   Cont ID  
Sent By Bwoods Date 2018-12-06 Time 0:00 Rev Time 0.00
Received By   Date 2018-12-03 Time 0:00 Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-10-17 Cont ID  
Sent By fgiaquin Date 2018-10-17 Time 00:00 Rev Time 0.00
Received By bwoods Date 2018-10-17 Time 00;00 Sent To I
Notes
2018-10-17 13:00:54PER NFPA 110
  
 7.2 LOCATION.
 7.2.1 INDOOR EPS INSTALLATIONS. THE EPS SHALL BE
 INSTALLED IN A
 SEPARATE ROOM FOR LEVEL 1 INSTALLATIONS.
 7.2.1.1 THE EPS ROOM SHALL BE SEPARATED FROM THE REST
 OF THE
 BUILDING BY CONSTRUCTION WITH A 2-HOUR FIRE RESISTANCE
 RATING.
  
 PLEASE PROVIDE DETAILS OF THE RATING OF THE PROPOSED
 ROOM AND DOOR TO THIS GENERATOR ROOM.
  
  
  
  
  
 THERE IS AN INDICATION OF EXHAUST PIPING, HOWEVER,
 THERE ARE NO DETAILS.
  
 PER NFPA 110
  
 7.10 EXHAUST SYSTEM.
 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION,
 INCLUDING
 PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN
 ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION
 AND USE OF
 STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND
 OTHER APPLICABLE
 STANDARDS.
 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO
 PREVENT
 EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR
 BUILDINGS
 AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT
 REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH
 WINDOWS,
 AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE
 SYSTEM.
 7.10.3* EXHAUST PIPING SHALL BE CONNECTED TO THE PRIME
 MOVER
 BY MEANS OF A FLEXIBLE CONNECTOR AND SHALL BE
 INDEPENDENTLY
 SUPPORTED THEREAFTER SO THAT NO DAMAGING WEIGHT OR
 STRESS IS
 APPLIED TO THE ENGINE EXHAUST MANIFOLD OR TURBOCHARGER.
  
 PLEASE PROVIDE SPECIFIC DETAILS AND SPEC SHEETS.
  
  
  
  
 THERE IS AN INDICATION OF A FUEL TANK INSIDE THE
 GENERATOR ROOM. THERE IS NO INDICATIONS IF IT MEETS THE
 REQUIREMENTS OF NFPA 110 OR OTHER APPLICABLE CODES.
  
 PER NFPA 110
  
 7.9.1.1 ALL FUEL TANKS AND SYSTEMS SHALL BE INSTALLED
 AND MAINTAINED
 IN ACCORDANCE WITH NFPA 30, FLAMMABLE AND COMBUSTIBLE
 LIQUIDS CODE; NFPA 37, STANDARD FOR THE INSTALLATION
 AND USE OF
 STATIONARY COMBUSTION ENGINES AND GAS TURBINES; NFPA
 54, NATIONAL
 FUEL GAS CODE; AND NFPA 58, LIQUEFIED PETROLEUM GAS
 CODE.
 7.9.3.1* GALVANIZED FUEL LINES SHALL NOT BE USED.
 7.9.3.2 APPROVED FLEXIBLE FUEL LINES SHALL BE USED
 BETWEEN THE
 PRIME MOVER AND THE FUEL PIPING.
 7.9.11 ALL MANUAL FUEL SYSTEM VALVES SHALL BE OF THE
 INDICATING
 TYPE.
 7.9.12.1 A MINIMUM CLEARANCE OF 0.9 M (36 IN.) SHALL BE
 MAINTAINED ON ALL SIDES.
  
 PLEASE PROVIDE DETAILS.
  
  
  
 THERE IS AN INDICATION OF A FUEL TANK WITHIN THE
 GENERATOR ROOM. THERE IS NO INDICATION IF THIS TANK IS
 DOUBLE WALLED OR THERE IS CONTAIMENT.
  
 PER NFPA 30
  
 9.13* CONTAINMENT, DRAINAGE, AND SPILL CONTROL.
 9.13.1 STORAGE AREAS SHALL BE DESIGNED AND OPERATED TO
 PREVENT
 THE DISCHARGE OF LIQUIDS TO PUBLIC WATERWAYS, PUBLIC
 SEWERS,
 OR ADJOINING PROPERTY, UNLESS SUCH DISCHARGE HAS BEEN
 SPECIFICALLY
 APPROVED.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-01-28 Cont ID  
Sent By tklarge Date 2019-01-28 Time 14:13 Rev Time 0.00
Received By tklarge Date 2019-01-25 Time 13:50 Sent To  
Notes
2019-01-28 13:50:571/28 TO TL DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-01-22 Cont ID  
Sent By tklarge Date 2019-01-22 Time 11:02 Rev Time 0.00
Received By tklarge Date 2019-01-11 Time 14:59 Sent To  
Notes
2019-01-14 15:00:00B30

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-17 Cont ID  
Sent By tklarge Date 2018-12-17 Time 11:07 Rev Time 0.00
Received By tklarge Date 2018-11-26 Time 13:34 Sent To  
Notes
2018-11-28 13:34:18RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-10-23 Cont ID  
Sent By cpuell Date 2018-10-23 Time 14:05 Rev Time 0.00
Received By cpuell Date 2018-09-14 Time 11:40 Sent To  
Notes
2018-09-17 11:40:38ROUTED TO ZONING INBOX

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2019-01-28 Cont ID  
Sent By ccole Date 2019-01-28 Time 11:51 Rev Time 0.00
Received By ccole Date 2019-01-28 Time 11:51 Sent To  
Notes
2019-01-28 12:05:47MECHANICAL PROVISO:
  
 THE SUBMITTED PLANS, REVISED ARCHITECTURAL AND
 MECHANICAL SKETCHES, AND SPEC SHEETS ARE APPROVED WITH
 EXCEPTION.
 A COMPLETE MATCHING SET OF REVISED ARCHITECTURAL,
 MECHANICAL, AND ELECTRICAL PLANS MUST BE SUBMITTED FOR
 FINAL APPROVAL.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2019-01-16 Cont ID  
Sent By ccole Date 2019-01-16 Time 09:09 Rev Time 0.00
Received By ccole Date 2019-01-16 Time 09:09 Sent To  
Notes
2019-01-16 09:51:152ND REVIEW FBC-2017 MECHANICAL
 PERMIT #18090632
 1/16/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 NFPA 37-2018
 NFPA 110-
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) REFER TO SECTIONS 7.7.2,1 &, 7.7.2.3 & 7.7.3 NFPA
 110: PER THE ENGINEER'S PLAN AND NARRATIVE, THE
 VENTILATION AIR FOR THE GENERATOR IS BEING DRAWN IN
 THROUGH A LOUVERED OPENING IN THE 2HR. FIRE-RATED WALL
 GENERATOR ROOM WALL THAT ADJACENT TO THE PARKING GARAGE
 WHICH IS NOT PERMITTED PER SECTION 7.7.2.1 & 7.7.3.
 THESE SECTIONS STATE THAT VENTILATION AIR MUST BE
 SUPPLIED DIRECTLY FROM A SOURCE OUTSIDE THE BUILDING.
 SECTION 7.7.2.3 PROHIBITS THE USE OF A FIRE DAMPER TO
 PROTECT THE OPENING, THEREFORE THE VENTILATION OPENING
 LOCATION WOULD NOT BE COMPLIANT BECAUSE OPENINGS IN
 FIRE BARRIERS REQUIRE PROTECTION ACCORDING TO SECTION
 607.5.2 FBC M.
  
 2) THE SUBMITTED CUT SHEET FOR THE IN LINE FAN (EF-2)
 IN THE GENERATOR/TANK ROOM IS FOR A MODEL THAT IS NOT
 THE SAME AS FAN IN THE SUBMITTED SCHEDULE. THE NEW FAN
 DOES NOT APPEAR TO BE IN COMPLAINCE WITH SECTIONS 503.1
 AND 503.2 FBC M WHICH REQUIRE THE MOTOR FOR THE FAN TO
 BE OUTSIDE THE DUCT, AND ALL PARTS OF THE FAN IN
 CONTACT WITH FLAMMABLE VAPORS, FUMES, OR DUSTS SHALL BE
 OF NONFERROUS OR NONSPARKING MATERIALS ETC.
  
 3) THE EXHAUST DUCT WORK FOR EF-2 SHALL BE G90 PER
 SECTIONS 510.9 AND SHALL ALSO BE ENCLOSED IN 2HR,
 FIRE-RESISTANT RATED CONSTRUCTION FROM POINT OF
 PENETRATRION TO THE OUTLET TERMINAL- SECTIONS 510.2 &
 510.7.3 FBC M, AND 6.3.6.5.1 NFPA 37.
  
 4) AS PREVIOUSLY REQUESTED SUBMIT THE GENERATOR EXHAUST
 PIPE SPECS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-12-12 Cont ID  
Sent By ccole Date 2018-12-12 Time 09:08 Rev Time 0.00
Received By ccole Date 2018-12-11 Time 17:44 Sent To E
Notes
2018-12-12 10:06:051ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18090632
 12/12/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 NFPA 37-2018
 NFPA 110-
  
 PLAN REVIEW RESULTS: DENIED.
  
  
 1) SHEET M-401: THE GENERATOR/TANK (EPS) ROOM DRAWINGS
 SHOW THE INTAKE AND EXHAUST AIRFLOW ARROWS REVERSED.
 THE RADIATOR IS EXHAUST AND THE LOUVER BY THE DOORS IN
 ALLEY IS INTAKE- PLEASE CORRECT.
  
 2) M-401: IT APPEARS THAT THE GENERATOR RADIATOR
 EXHAUST DISCHARGE AND EF-2 ARE BOTH DISCHARGING INTO
 THE PARKING GARAGE. PLEASE REVIEW THE FOLLOWING LIST OF
 CODE SECTIONS AND CORRECT:
  
 A) SECTION 501.3 FBC M: AIR REMOVED BY MECHANICAL
 EXHAUST SYSTEMS SHALL DISCHARGE TO THE OUTDOORS.
  
 B) SECTION 510.6.7 FBC M: HAZARDOUS EXHAUST DUCT
 SYSTEMS SHALL EXTEND DIRECTLY TO THE EXTERIOR OF THE
 BUILDING.
  
 C) SECTION 6.3.6.5.2 NFPA 37- 2015: VENTILATION SHALL
 DISCHARGE TO A SAFE LOCATION OUTSIDE OF THE BUILDING.
  
 D) SECTION 7.7.4.2 NFPA 110- 2016: RADIATOR AIR SHALL
 DISCHARGE BE DUCTED OUTDOORS.
  
 3) M-401: PLEASE CORRECT KEYED NOTE #3. THE EXHAUST
 SYSTEM IN THE GENERATOR/TANK (EPS) ROOM (EF-2) SHALL
 RUN CONTINUOUSLY- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA
 37, AND SECTION 502.4.2 FBC M.
  
 4) M-401: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR
 THE GENERATOR/TANK (EPS) ROOM, AND PROVIDE AN EQUIPMENT
 SCHEDULE FOR EF-2- SECTION 502.4.2 FBC M.
  
 5) M-401: INDICATE THE TYPE AND GAGE OF THE EXHAUST
 DUCTWORK- SECTION 510.9 FBC M.
  
 6) M-401: THE OUTSIDE AIR INTAKE FOR THE GENERATOR/TAN
 K (EPS) ROOM SHALL BE 10' FROM THE ALLEY IN ACCORDANCE
 WITH SECTION 510.6.5 AND 401.4 (1) & (2) FBC M.
  
 7) M-401: REFER TO SECTION 7.7.1 NFPA 110- 2016 AND
 VERIFY THAT THE VENTILATION AIRFLOW IN THE
 GENERATOR/TANK (EPS) ROOM IS DESIGNED TO LIMIT THE
 MAXIMUM AIR TEMPERATURE IN THE ROOM TO THE MAXIMUM
 AMBIENT AIR TEMPERATURE REQUIRED BY THE GENERATOR
 MANUFACTURER. CONSIDERATION SHALL BE GIVEN TO ALL THE
 HEAT EMITTED TO THE ROOM BY THE ENERGY CONVERTER,
 EXHAUST PIPES, AND ALL OTHER HEAT PRODUCING EQUIPMENT-
 SECTION 7.7.1.1. DESIGN OF THE HEATING, COOLING, AND
 VENTILATION SYSTEM SHALL AMONG OTHER THINGS, INCLUDE
 PROVISONS FOR FACTORS SUCH AS HEAT, COLD, HUMIDITY,
 LOUVERS, ETC.- SECTION 7.7.7.
  
 8)1SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS,
 AND PROVIDE AN EXHAUST PIPE DIAGRAM SHOWING THE TOTAL
 SYSTEM RUN AND LENGTH MEASUREMENT. PLEASE INCLUDE ALL
 COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER, AND
 ANY CONTRACTOR SUPPLIED PIPING.
  
 9) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEM PER
 THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A
 BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE CALC
 MUST INCLUDE ALL COMPONENTS OF THE EXHAUST SYSTEM,
 INCLUDING THE SILENCER AND ALL FACTORY OR CONTRACTOR
 SUPPLIED PIPING.
  
 10) PROVIDE THE UL CERTIFICATES FOR THE GENERATOR AND
 THE FUEL TANK- SECTION 304.1 FBC M.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2019-01-28 Cont ID  
Sent By tklarge Date 2019-01-28 Time 14:13 Rev Time 0.00
Received By tklarge Date 2019-01-28 Time 14:12 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2019-01-22 Cont ID  
Sent By tklarge Date 2019-01-22 Time 11:02 Rev Time 0.00
Received By tklarge Date 2019-01-16 Time 13:29 Sent To I
Notes
2019-01-18 13:25:231) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS.
 WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST.
 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37
 PER NFPA 37 SEC. 1.3 & 2017 FBC MECH. SEC. 915. THE
 NARRATIVE STATES THAT THE GENERATOR WILL MEET THE
 REQUIREMENTS OF NFPA 37 BUT DOCUMENTATION HAS NOT BEEN
 PROVIDED TO SUPPORT SUCH STATEMENT. PROVIDE
 DOCUMENTATION FROM THE MANUFACTURER THAT CONFIRMS
 COMPLIANCE. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST.
 3) INDICATE ON THE PLANS THE CLASS OF LIQUID OF THE
 FUEL IN ACCORDANCE WITH NFPA 30 SEC. 4.3.2. 2ND
 REQUEST.
 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FUEL
 STORAGE TANK. THE STORAGE TANK SHALL MEET THE
 REQUIREMENTS OF NFPA 37 SEC. 22.11.4.1 THROUGH
 SECS.22.11.4.10. SUBMIT A SECTION DETAIL AND PLAN VIEW
 OF THE TANK SHOW THE SIZE OF ALL TANK OPENINGS, VENTS
 AND IDENTIFY EACH OPENING. 2ND REQUEST.
 5) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET
 SHOWS THE DIAMETER OF THE EXHAUST AS 5 INCHES BUT
 SHT.SK-M401-2 SHOWS THE EXXHAUST AS 6 INCH. CLARIFY AND
 SUBMIT A REVISED CALCULATION SHEET.
 6) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET
 NOTES TWO SHORT RADIUS ELBOWS BUT SHT. SK-M401-2
 APPEARS TO SHOW THREE ELBOWS: ONE AT THE GENERATOR, ON
 AT THE HORIZONTAL TURN AND GOING VERTICAL. CLARIFY AND
 SUBMIT A REVISED CALCULATION SHEET.
 7) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF
 NFPA 704 OR ANOTHER APPROVED SYSTEM SHALL BE APPLIED TO
 STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30 SEC.
 21.7.2.1. PLACE A NOTE ON THE PLAN THAT THIS WILL BE
 DONE.
 8) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL
 TANK PER NFPA 30 SEC. 22.7. THIS SHALL INCLUDE THE
 INTERSTITIAL SPACE.REFER TO NFPA 30 SEC. 22.7.3 AND
 TABLE 22.7.3.2. SUBMIT SPECIFICATIONS FOR THE EMERGENCY
 VENT. THIS IS NOT SHOWN ON THE PLAN.
 9) SHOW ON THE PLAN HOW THE VENT PIPES AND FILL PIPE
 WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS OF
 THE STRUCTURE. GROUTING IN PLACE AS NOTED IN THE
 NARRATIVE IS UNACCEPTABLE AND DOES NOT MEET CODE.
 PIPING THAT PASSES THROUGH THE WALL OF A STRUCTURE
 SHALL BE DESIGNED TO PREVENT DAMAGING STRESSES AND
 LEAKAGE DUE TO SETTLEMENT OR FIRE EXPOSURE.NFPA 30
 SEC.27.6.3. 2ND REQUEST.
 10) SUBMIT THE UL APPROVAL/ CERTIFICATE/ CERTIFICATION
 FOR THE FUEL TANK.SECTION 304.1 2017 FBC-MECH. 2ND
 REQUEST.
 11) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL
 COMPLY WITH NFPA 30 SEC.21.4.3.3 NORMAL VENTS SHALL BE
 SIZED IN ACCORDANCE WITH EITHER API STANDARD 2000,
 VENTING ATMOSPHERIC AND LOW-PRESSURE STORAGE TANKS, OR
 ANOTHER APPROVED STANDARD. ALTERNATIVELY, THE NORMAL
 VENT SHALL BE AT LEAST AS LARGE AS THE LARGEST FILLING
 OR WITHDRAWAL CONNECTION, BUT IN NO CASE SHALL IT BE
 LESS THAN 1.25 IN. (32 MM) NOMINAL INSIDE DIAMETER.
 12) THE DOCUMENT FROM EMC ( ENGINEERED MANUFACTURING
 CORP.) IS UNACCEPTABLE. WHO IS CERTIFYING THE TANK?
 THERE IS NO NAME ON THIS DOCUMENT OR THE TITLE OF SUCH
 PERSON. WHO IS THE PERSON AND WHAT IS THEIR RANKING IN
 THE COMPANY? IN ADDITION, THIS DOCUMENT SHOWS THE
 RESULTS OF A LEAKAGE TEST, NOT A UL CERTIFICATION FOR
 THE TANK. THE TANK SHALL BE IN COMPLIANCE WITH UL 2085
 PER THE SPECIFICATIONS ON SHT. E-002.
 13) SHT. E-002 - 2.4 - FUEL OIL STORAGE SPECIFICATIONS
 REFER TO A SUB-BASE TANK BUT THAT IS NOT WHAT IS BEING
 INSTALLED. CLARIFY.
 14) NFPA 30-12 SEC. 22.11.4. - WHERE A SECONDARY
 CONTAINMENT- TYPE TANK IS USED TO PROVIDE SPILL
 CONTROL, THE TANK SHALL MEET ALL OF THE REQUIREMENTS OF
 NFPA 30-12 SECS. 22.11.4.1 THROUGH 22.22.4.10.
 15) IF A NARRRATIVE RESPONSE IS SUBMITTED UPON REVIEW
 OF THESE PLAN REVIEW COMMENTS, THE NARRATIVE SHALL BE
 ON THE LETTERHEAD OF THE ENGINEERING FIRM OF RECORD WHO
 IS ELLIS & GRITTER, NOT STRATICON WHO IS THE
 CONTRACTOR.WPB AMEND TO FBC SEC.107.2.
  
 THE FOLLOWING ITEMS WILL BE PROVISOS AND ARE TO BE
 CHECKED IN THE FIELD BY THE FIELD INSPECTOR:
  
 1) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE
 FUEL RETURN ELEVATION PER NFPA 110SEC.7.9.4.1.
 2) APPROVED FLEXIBLE FUEL LINES SHALL BE USED
 BETWEENTHE PRIME MOVER AND THE FUEL PIPING. NFPA 110
 SEC.7.9.3.2.
  
  
  
  
  
  
  
  
  
  
  
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-12-17 Cont ID  
Sent By tklarge Date 2018-12-17 Time 11:07 Rev Time 0.00
Received By tklarge Date 2018-12-14 Time 06:08 Sent To I
Notes
2018-12-14 11:17:57 
 PLAN REVIEW RESULTS: DENIED.
  
 1) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS,
 AND PROVIDE AN EXHAUST PIPE DRAWING SHOWING THE TOTAL
 SYSTEM RUN AND LENGTH MEASUREMENT. PLEASE INCLUDE ALL
 COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER, ANY
 CONTRACTOR SUPPLIED PIPING, AND PIPE SUPPORT AND
 SPACING.
 2) THE GENERATOR SPECIFICATIONS NOTE THAT THE GENERATOR
 OFFERS A UL 2200 LISTING. SUBMIT A COPY OF THE
 CERTIFICATE OF COMPLIANCE SHOWING THE UL 2200 LISTING.
 2017 FBC-MECH. SEC.915.
 3) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37
 PER 2017 FBC-MECH. SEC. 915. I COULD NOT FIND THIS
 INFORMATION IN THE SPECIFICATIONS.
 4) SPILL CONTROL, CONTAINMENT AND DRAINAGE MAY BE
 REQUIRED FOR THE FUEL TANK DEPENDING ON THE CLASS OF
 LIQUID OF THE FUEL. NFPA 30 SEC. 9.13. IT APPEARS THE
 FUEL IS A II COMBUSTIBLE LIQUID PER NFPA 30. CLARIF ON
 THE PLANS..
 5) IN ADDITION TO THE TANK PLANS THAT HAVE BEEN
 SUBMITTED, SUPPLY ANY ADDITIONAL MANUFACTURER'S
 SPECIFICATIONS FOR THE FUEL TANK.WPB AMEND. TO FBC SEC.
 107.2.1.
 6) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER
 THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A
 BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE
 CALCULATION MUST INCLUDE ALL COMPONENTS OF THE EXHAUST
 SYSTEM, INCLUDING THE SILENCER AND ALL FACTORY OR
 CONTRACTOR SUPPLIED PIPING.
 7) THE FUEL TANK VENTS SHALL BE 5 FEET FROM BUILDING
 OPENINGS AND 15 FEET FROM POWERED VENTILATION AIR
 INTAKES PER NFPA 30-12 SEC.19.5.3.2.
 8) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF
 NFPA 704, OR ANOTHER APPROVED SYSTEM, SHALL BE APPLIED
 TO STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30
 SEC.21.7.2.1.
 9) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL
 TANK PER NFPA 30 SEC.22.7.
 10) SHOW ON THE PLAN HOW THE VENT PIPES FROM THE FUEL
 TANK WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS
 OF THE STRUCTURE.
 11) THE FILL PORT FOR THE FUEL TANK SHALL BE PROVIDED
 ON AN EXTERIOR WALL OF THE ROOM OR STRUCTURE ENCLOSING
 THE TANK AT A POINT AT LEAST 24 INCHES FROM ANY
 BUILDING OPENING AT THE SAME OR LOWER LEVEL PER NFPA
 37-15 SEC. 6.6.3.3. SHOW THE LOCATION OF THE FILL PORT
 ON THE PLANS.
 12) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER
 THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A
 BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE CALC
 MUST INCLUDE ALL COMPONENTS OF THE EXHAUST SYSTEM,
 INCLUDING THE SILENCER AND ALL FACTORY OR CONTRACTOR
 SUPPLIED PIPING.
 13) PROVIDE THE UL CERTIFICATE FOR THE FUEL TANK-
 SECTION 304.1 FBC M
 14) SUBMIT A FUEL PIPING RISER DIAGRAM. DAY TANKS ON
 DIESEL SYSTEMS SHALL BE INSTALLED BELOW THE ENGINE FUEL
 RETURN ELEVATION PER NFPA 110-13 SEC.7.9.4.
 15) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE
 FUEL RETURN ELEVATION PER NFPA 110 SEC. 7.9.4.1.
 16) APPROVED FLEXIBLE FUEL LINES SHALL BE USED BETWEEN
 THE PRIME MOVER AND THE FUEL PIPING. NFPA 110 SEC.
 7.9.3.2.
 17) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL
 COMPLY WITH.NFPA 30 SEC. 21.4.3.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-09-25 Cont ID  
Sent By tklarge Date 2018-09-25 Time 05:48 Rev Time 0.00
Received By tklarge Date 2018-09-25 Time 05:30 Sent To  
Notes
2018-09-25 05:47:591) PROVIDE A COMPLETE DESCRIPTION OF THE WORK ON THE
 PERMIT APPLICATION. THE DESCRIPTION OF WORK ON THE
 APPLICATION JUST NOTES "GENERATOR". IS THIS GENERATOR
 REPLACING AN EXISTING? THE PLANS ARE VAGUE. 2017 FBC
 SEC. 107.2.1.
 2) THE PLANS SHOW A FUEL TANK. IS THE TANK NEW OR
 ESISTING? WHAT IS THE CAPACITY? WHAT TYPE OF TANK IS
 IT? SUBMIT 2 COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE FUEL TANK. 2017 FBC SEC.
 107.2.1.
 3) THE TANK INSTALLATION SHALL COMPLY WITH THE
 APPLICABLE REQUIREMENTS OF NFPA 30.
 4) SUBMIT TWO COPIES OF THE MSDS SHEETS FOR THE FUEL.
 2017 FBC SEC. 107.2.1.
 5) SUBMIT A FUEL PIPING RISER DIAGRAM FOR ANY NEW FUEL
 PIPING THAT WILL BE INSTALLED.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-09-20 Cont ID  
Sent By mcruz Date 2018-09-20 Time 15:26 Rev Time 0.00
Received By mcruz Date 2018-09-20 Time 15:26 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved