Plan Review Details - Permit 18090262
Plan Review Stops For Permit 18090262
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-01-15 Cont ID  
Sent By dbattles Date 2019-01-15 Time 11:41 Rev Time 0.00
Received By dbattles Date 2019-01-15 Time 11:41 Sent To  
Notes
2019-01-15 11:41:27PROVISOS:
 1. PROVIDE SUBMITTAL FOR STRUCTURAL ALUMINUM PANEL
 SYSTEM.
 2. PROVIDE SUBMITTAL FOR ROOF TOP CANOPIES.
 3. PROVIDE SUBMITTAL FOR CRASH BARRIERS AND GUARDRAILS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-01-07 Cont ID  
Sent By dbattles Date 2019-01-07 Time 08:09 Rev Time 0.00
Received By dbattles Date 2019-01-07 Time 08:09 Sent To  
Notes
2019-01-07 08:16:00PROVISOS:
 1. PROVIDE SUBMITTAL FOR STRUCTURAL ALUMINUM PANEL
 SYSTEM.
 2. PROVIDE SUBMITTAL FOR ROOF TOP CANOPIES.
 3. PROVIDE SUBMITTAL FOR CRASH BARRIERS AND GUARDRAILS.
2019-01-04 10:56:561/4/19 APPLICANT REQUESTED VALUE BE REDUCED BY
 $154,758.00 WHICCH REPRESENTS THE FIRE SPRINKLER VALUE
 UN APPLICATION NUMBER 19010097; BUILDING PLANS EXAMINER
 TO VERIFY UPON 3RD REVIEW CYCLE, SAK.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-12-20 Cont ID  
Sent By dbattles Date 2018-12-20 Time 14:28 Rev Time 0.00
Received By dbattles Date 2018-12-20 Time 14:28 Sent To  
Notes
2018-12-20 14:32:40PROVISOS:
 1. PROVIDE SUBMITTAL FOR STRUCTURAL ALUMINUM PANEL
 SYSTEM.
 2. PROVIDE SUBMITTAL FOR ROOF TOP CANOPIES.
 3. PROVIDE SUBMITTAL FOR CRASH BARRIERS AND GUARDRAILS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-10-26 Cont ID  
Sent By dbattles Date 2018-10-26 Time 15:18 Rev Time 0.00
Received By dbattles Date 2018-10-25 Time 09:05 Sent To  
Notes
2018-10-26 15:23:48****CORRECTIONS****
 W.P.B. PERMIT: 18090262
 REVIEWED: OCTOBER 25, 2018
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER I
 [email protected]
 561-805-6718
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC AMENDED = FLORIDA BUILDING CODE,6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC ENERGY = FBC ENERGY CONSERVATION
  
 1. [FBC AMENDED 109.3]HOW WAS VALUATION OF PROJECT
 DETERMINED?
 PLEASE PROVIDE COST EVALUATION AND THE MEANS BY WHICH
 IT WAS CALCULATED. ITEMS THAT WILL BE PERMITTED
 COMPLETELY SEPARATE AND THE VALUE NOT INCLUDED IN MAIN
 PERMIT/NO FEE SUB PERMITS CAN BE DEDUCTED FROM VALUE,
 FOR EXAMPLE FIRE ALARM AND SPRINKLER, BUT INCLUDE THESE
 DEDUCTIONS AS LINE ITEMS DEDUCTED FROM THE TOTAL
 EVALUATION FOR REFERENCE.
 [FBC AMENDED 109.3]BUILDING PERMIT VALUATIONS. IF, IN
 THE OPINION OF THE BUILDING OFFICIAL, THE CLAIMED
 VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEMS APPEARS
 TO BE UNDERESTIMATED ON THE APPLICATION, THE PERMIT
 SHALL BE DENIED, UNLESS THE APPLICANT CAN SHOW
 DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED
 CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE APPROVAL
 OF THE BUILDING OFFICIAL. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2. ART IN PUBLIC PLACES
 THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES
 ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR
 NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT
 APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL
 PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE.
 PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND
 CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V,
 ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION
 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL
 PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE
 DEVELOPMENT.
 (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND
 THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL
 PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW
 CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN
 EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS
 WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED
 CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES
 REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED
 SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF
 THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW
 CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS.
 FOR CONTACT INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR
 822-1515 E-MAIL: [email protected]
  
 3. [FBC 107.3.5.3]PROVIDE SEDIMENT CONTROL PLAN TO KEEP
 CONSTRUCTION DEBRIS FROM ENTERING ADJACENT PROPERTIES
 AND STORM DRAINS DURING CONSTRUCTION.
  
 4. [FBC 107.5][FBC 110.9]PROVIDE SITE DRAINAGE PLAN.
 NO CIVIL PLANS ARE SUBMITTED. PLEASE PROVIDE CIVIL
 PLANS TO RESPONSE TO SITE DRAINAGE AND SEDIMENT
 CONTROL.
 PROVIDE FULL GEO-TECHNICAL REPORT WITH FOUNDATION
 RECOMMENDATIONS. UPLOAD TO SUPPORTING FILE IN PROJECT
 DOX
  
 5. [FBC AMENDED 107.3.5]PROVIDE BASE ELEVATION IN
 NAVD88 FOR THE LOWEST POINT IN THE PARKING GARAGE.
  
 6. [FBC 406.4.1]WHAT IS THE MINIMUM HEIGHT CLEARANCE
 FOR THE STRUCTURE?
 ADD DIMENSIONS TO SECTIONS TO SHOW HOW 7' CLEARANCE IS
 PROVIDED THROUGHOUT LEVELS AND 8'-2" IS PROVIDED FOR
 VAN ACCESSIBLE SPACES.
  
 7. [FBC 406.4.1]CLEAR HEIGHT.
 THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND
 PEDESTRIAN TRAFFIC AREAS SHALL BE NOT LESS THAN 7 FEET
 (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING
 VAN-ACCESSIBLE PARKING SHALL COMPLY WITH THE FLORIDA
 BUILDING CODE, ACCESSIBILITY.
  
 SHEET GG102 STATES THE NUMBER OF SPOTS PROVIDED. ADD TO
 THE TABLE THE NUMBER OF SPOTS REQUIRED.
 SHEET GG102 DOESN'T STATE THE AMOUNT OF REQUIRED ADA
 SPOTS, BUT BASED ON WHAT IS PROVIDED THERE SHOULD BE
 TWO VAN ACCESSIBLE SPACES.
  
 PLEASE INDICATE WHICH SPACES ARE VAN ACCESSIBLE AND
 FOLLOW THE GUIDELINES FOR SIGNAGE TO INDICATE HEIGHT.
  
 ADVISORY 502.5 VERTICAL CLEARANCE. SIGNS PROVIDED AT
 ENTRANCES TO PARKING FACILITIES INFORMING DRIVERS OF
 CLEARANCES AND THE LOCATION OF VAN ACCESSIBLE PARKING
 SPACES CAN PROVIDE USEFUL CUSTOMER ASSISTANCE.
  
 FLORIDA LAW, S.553.511, F.S., REQUIRES SIGNS BE POSTED
 THAT WILL WARN HANDICAPPED-EQUIPPED VAN OPERATORS OF
 HEIGHT LIMITATIONS SO THEY WILL NOT PASS BEYOND A POINT
 WHERE THE VAN CANNOT BE MANEUVERED.
  
 [FBC A208.2.4]VAN PARKING SPACES.
 WHERE VAN PARKING IS PROVIDED PURSUANT TO SECTION
 502.2, FOR EVERY SIX OR FRACTION OF SIX PARKING SPACES
 REQUIRED BY 208.2 TO COMPLY WITH 502, AT LEAST ONE
 SHALL BE A VAN PARKING SPACE COMPLYING WITH 502
  
 8. [FBC 1015]SHEET GA302 HAS NOTE THAT CRASH CABLES TO
 RESTRICT SPHERE 8" SPERE UP TO 42. PLEASE ADJUST NOTE
 TO CLARIFY THAT THE CRASH CABLES FUNCTION AS BOTH
 VEHICLE BARRIER AND GUARD TO 42". ALSO, IN RESPONSE
 SHEET EITHER STATE THE EXCEPTION TO ALLOW 8" FROM 34 TO
 42, OR ADJUST NOTE TO COMPLY WITH 1016. I SEE EXCEPTION
 FOR 4 3/8" SPHERE FROM 36-42, BUT NOT 8". EVEN THOUGH
 DRAWING APPEARS TO COMPLY ALL THE WAY UP PLEASE ADJUST
 NOTE TO MATCH.
  
 9. [FBC 1607.8.3]PROVIDE ENGINEERING TO SHOW HOW THE
 VEHICLE BARRIER IS RATED TO RESIST 6000 LBS AS
 REQUIRED. ALSO, PROVIDE SPECIFICATIONS THAT SHOW THIS
 PRODUCTS USE FOR PARKING GARAGE BARRIER FOR RAISED
 PLATFORM APPLICATIONS.
  
 10. [FBC 406.5.2]SHEET GA201 AND GA 202. PLEASE PROVIDE
 A CLEARER DEPICTION OF OPENINGS THAT ARE USED TO
 DETERMINE TO AMOUNT OF OPENINGS PER TIER. PROVIDING
 ELEVATIONS WITHOUT THE SCREENING THAT WILL BE UNDER
 SEPARATE PERMIT WOULD HELP TO SEE HOW THE PERIMETER
 WALL PROVIDES OPENING.
 THE CALCULATIONS SHOULE BE PER TIER, BUT THE PROVIDED
 ARE BY LEVELS AND PERIMETER DISTANCES VARY.
 THE GROUND LEVEL WALL AREA MAKES SENSE SINCE 10'-6"
 (HEIGHT) X 641'-8" PERIMETER = 6,737 SQ. FT, BUT THEN
 THE PROVIDED LENGHT EXCEEDS THE PERIMETER.
 VP WEST ELEVATION SEEMS TO BE A GOOD INDICATER OF TIER
 HEIGHTS AND THERE SHOUD BE 3 TIERS SHOWN:
 TIER 1 FROM -10'-4" TO 0'-0" WITH 641'-8" PERIMETER
 TIER 2 FROM 0'-0" TO 10'-10" WITH 641'-8" PERIMETER
 TIER 3 FROM 10'-10" TO 21'-4" WITH 641'-8" PERIMETER
 SHOW TOAL AREA OF WALL, REQ'D AREA, AREA PROVIDED
 WITHOUT SCREENING (100% OPEN), OPENING AREA WITH
 SCREENING ADJUSTMENT FACTOR(61% OPEN) AND TOTAL OPENING
 PROVIDED.
 IF ELEVATIONS ARE SHOW WITHOUT THE SCREENING IT WILL
 ALSO BE EASIER TO SEE HOW OPENING ARE PROVIDED ALONG
 40% OF THE PERIMETER. USE 641'-8" X .40 = 257' MINIMUM
 PER TIER AS YOU DID FOR GROUND LEVEL.
  
 11. [FBC 406.5.2]ADD CALCULATION TO SHOW 20% OPENINGS
 EVENLY DISTRIBUTED ON INTERIOR WALL PER TIER.
  
 12. [FBC 107.3.4.1]A CONSTRUCTION GUARDRAIL DETAIL,
 PREPARED BY A DESIGN PROFESSIONAL LICENSED UNDER FS471
 OR FS481, IS REQUIRED TO BE SUBMITTED, REVIEWED AND
 ISSUED BY THE CITY OF WEST PALM BEACH, OR INDICATE THAT
 IT WILL BE DEFERRED.
 *SUBJECT TO THE INSPECTOR?S DISCRETION, THIS MAY BE
 ACCEPTED IN THE FIELD AT TIME OF INSPECTION.
  
 PROVISOS:
 PROVIDE SEPARATE PERMIT FOR STRUCTURAL ALUMINUM PANEL
 SYSTEM.
 SEPARATE PERMIT FOR ROOF TOP CANOPIES.
  
 NOTE:
 -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW
 EACH COMMENT IS BEING ADDRESSED.
 -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW
 OF MATERIALS REQUESTED.
 -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS
 OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS)
 SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT
 DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER
 SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID"
 OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS
 APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE
 NEED "VOID", RENDERING THEM NOT USABLE.
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-01-21 Cont ID  
Sent By jpearson Date 2019-01-21 Time 10:24 Rev Time 0.00
Received By jpearson Date 2019-01-21 Time 10:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-12-20 Cont ID  
Sent By jpearson Date 2018-12-20 Time 10:12 Rev Time 0.00
Received By jpearson Date 2018-12-20 Time 10:12 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-09-22 Cont ID  
Sent By jpearson Date 2018-09-22 Time 14:09 Rev Time 0.00
Received By jpearson Date 2018-09-22 Time 14:09 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2018-12-26 Cont ID  
Sent By RRossano Date 2018-12-26 Time   Rev Time 0.00
Received By rrossano Date 2018-12-26 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-10-29 Cont ID  
Sent By shill Date 2018-10-29 Time 10:49 Rev Time 0.00
Received By shill Date 2018-10-29 Time 10:49 Sent To  
Notes
2018-10-29 10:50:02CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-12-07 Cont ID  
Sent By pleduc Date 2018-12-07 Time   Rev Time 0.00
Received By pleduc Date 2018-12-07 Time 13:41 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-09-24 Cont ID  
Sent By pleduc Date 2018-09-24 Time   Rev Time 0.00
Received By pleduc Date 2018-09-24 Time 10:48 Sent To  
Notes
2018-09-24 11:49:37THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) SHEET GG 102 - THERE IS NO INDICATION OF WHAT TYPE
 OF PARKING GARAGE IS PROPOSED OF BUILT TO; OPEN OR
 CLOSED.
  
 IS IT A MIXED (ONE PART CLOSED AND THE OTHER OPEN) OR
 SEPARATED OCCUPANCY? IF MIXED THE MOST STRIGENT; CLOSED
 SHALL APPLY TO ALL LEVELS.
  
 PLEASE REVIEW PROVIDE SPECCIFIC DETAILS.
  
  
  
 2) THERE ARE NO INDICATIONS OF FIRE SPRINKLER
 PROTECTION ON THE TOP FLLOR LEVEL UNDER THE ROOF
 CANOPY.
  
 PER NFPA 88A
  
 6.4 FIRE SPRINKLER SYSTEMS.
 6.4.1 AUTOMATIC SPRINKLER SYSTEMS SHALL CONFORM TO NFPA
 13.
  
 6.4.3 AUTOMATIC SPRINKLER SYSTEMS SHALL BE INSTALLED IN
 ENCLOSED
 PARKING STRUCTURES LOCATED AT OR ABOVE GRADE, OR WITHIN
 OR IMMEDIATELY BELOW A BUILDING USED FOR ANOTHER
 OCCUPANCY.
  
 PER NFPA 13
  
 CHAPTER 8 INSTALLATION REQUIREMENTS
 8.1* BASIC REQUIREMENTS.
 8.1.1* THE REQUIREMENTS FOR SPACING, LOCATION, AND
 POSITION OF
 SPRINKLERS SHALL BE BASED ON THE FOLLOWING PRINCIPLES:
 (1) SPRINKLERS SHALL BE INSTALLED THROUGHOUT THE
 PREMISES.
  
 8.15.7.5* SPRINKLERS SHALL BE INSTALLED UNDER EXTERIOR
 PROJECTIONS
 GREATER THAN 2 FT (0.6 M) WIDE OVER AREAS WHERE
 COMBUSTIBLES
 ARE STORED.
  
  
  
  
 3) GFP 001 - THERE IS A REFERNECE INDICATING THE
 HYDRANT FLOW WAS CONDUCTED BY PALM BEACH COUNTY. ALL
 HYDRANTS FLOWS ARE CONDUCTED BY THE CITY OF WEST PALM
 BEACH UTILITIES DEPARTMENT OR THE WEST PALM BEACH FIRE
 RESCUE, FIRE PREVENTION DEPARTMENT.
  
 PLEASE REVIEW AND CORRECT OR PROVIDE SPECIFIC DETAILED
 JUSTIFICATION.
  
  
  
 4) THERE DOES NOT APPEAR TO BE ANY MECHANICAL
 VENTILATION ON ANY ABOVE GRADE FLOOR LEVEL.
  
 PER NFPA 88A
  
 6.3 VENTILATION.
 6.3.1* ALL ENCLOSED PARKING STRUCTURES SHALL BE
 VENTILATED BY
 A MECHANICAL SYSTEM CAPABLE OF PROVIDING A MINIMUM OF
 300 L/MIN PER M2 OF FLOOR AREA (1 FT3/MIN PER FT2 OF
 FLOOR
 AREA) DURING HOURS OF NORMAL OPERATION.
 6.3.2 AMECHANICAL VENTILATION SYSTEM SHALL NOT BE
 REQUIRED IN
 AN OPEN PARKING STRUCTURE.
 6.3.3 MECHANICAL VENTILATING SYSTEMS SHALL BE INSTALLED
 IN ACCORDANCE
 WITH NFPA 90A. DUCTWORK SHALL BE CONSTRUCTED OF
 NONCOMBUSTIBLE MATERIAL.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC
 DETAIL AND CODE REFERNECES.
  
  
  
  
 5) SHEET GM 301 - IT APPEARS THAT THE BASEMENT
 VENTILATION FANS EXHAUST TO AN AREA OF MAIN EGRESS FROM
 THE KRAVIS AND ALSO TO UNDER A CANOPY AND DROP OFF.
  
 IF THIS SYSTEM IS DESIGN TO MONITOR CO AND ACTIVATE ON
 DETECTION, WAS THERE CONSIDERATION TO THE EFFECTS OF
 EXHAUSTING THE FUMES AT THIS LOCATION.
  
 THESE FUMES COULD ENTER OTHER AREAS OF THE KRAVIS AND
 GO UNDETECTED.
  
 PLEASE REVIEW, CORRECT OF A SPECIFIC DETAIL NARRATIVE.
  
  
  
 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 7)ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-01-29 Cont ID  
Sent By lmarchan Date 2019-01-29 Time 13:31 Rev Time 0.00
Received By lmarchan Date 2019-01-11 Time 14:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-31 Cont ID  
Sent By cpuell Date 2018-12-31 Time 07:32 Rev Time 0.00
Received By cpuell Date 2018-12-05 Time 14:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-10-29 Cont ID  
Sent By cpuell Date 2018-10-29 Time 10:50 Rev Time  
Received By shill Date 2018-09-11 Time 10:59 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2018-10-29 Cont ID  
Sent By shill Date 2018-10-29 Time 10:48 Rev Time 0.00
Received By shill Date 2018-10-29 Time 10:48 Sent To  
Notes
2018-10-29 10:49:10IMPACT FEES REVIEWED UNDER 18071472
 PLAN STAMPED, $0 DUE
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2018-10-26 Cont ID  
Sent By dbattles Date 2018-10-26 Time 15:34 Rev Time 0.00
Received By dbattles Date 2018-10-26 Time 15:34 Sent To  
Notes
2018-10-26 15:35:23[FBC AMENDED 109]PLANS WILL BE REVIEWED BY THE PBC
 IMPACT FEE OFFICE DIGITALLY VIA PROJECTDOX UPON
 NOTIFICATION BY THIS OFFICE. NOTIFICATION MAY OCCUR
 WHEN PLANS ARE NEAREST FINAL FORM. YOU MAY COORDINATE
 WITH THE IMPACT FEE OFFICE AT (561) 233-5025 OR SIMPLY
 UPLOAD THE MUNICIPAL IMPACT FEE QUESTIONNAIRE FORM TO
 YOUR PROJECT AND NAME THE FILE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE. THE FORM CAN BE FOUND AT: HTTP://DISCOVE
 R.PBCGOV.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QU
 ESTIONNAIRE.PDF UPON APPROVAL AND FEE PAYMENT, PLEASE
 UPLOAD THE RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-12-20 Cont ID  
Sent By ccole Date 2018-12-20 Time 10:33 Rev Time 0.00
Received By ccole Date 2018-12-20 Time 08:01 Sent To  
Notes
2018-12-20 10:34:59MECHANICAL PROVISOS:
  
 1) PROVIDE A LETTER FROM THE MANUFACTURER CERTIFYING
 THE INSTALLATION OF THE EXTERIOR CONDENSER IN THE
 ENCLOSED GARAGE.
  
 2) MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
 INSTRUCTIONS FOR THE DWYER CO AND NO2 SENSORS IN THE
 ENCLOSED PARKING GARAGE SHALL BE ONSITE AT TIME OF
 INSPECTION.
  
 3) GARAGE EXHAUST SYSTEM TEST REQUIRED AT FINAL
 INSPECTION.
  
 4) MIAMI-DADE NOA FOR THE EXHAUST LOUVERS SHALL BE
 ONSITE AT TIME OF INSPECTION.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-10-04 Cont ID  
Sent By ccole Date 2018-10-04 Time 15:16 Rev Time 0.00
Received By ccole Date 2018-10-04 Time 15:16 Sent To  
Notes
2018-10-04 16:00:551ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18090262
 10/4/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PROVIDE COOLING AND HEATING CALCULATIONS FOR THE NEW
 MULTI-SPLIT AC SYSTEM- SECTION C403.2.1 FBC-17 ENERGY
 CONSERVATION.
  
 2) SHEET GM301: VERIFY THE GARAGE EXHAUST TERMINATION
 LOCATIONS ARE IN COMPLIANCE WITH THE REQUIRED
 CLEARANCES LISTED UNDER SECTIONS 501.3 & 501.3.1 FBC M.
  
 3) GM301: CLARIFY HOW MAKEUP AIR IS BEING PROVIDED FOR
 THE GARAGE EXHAUST- SECTION 501.4 FBC M.
  
 4) GM301: THE AIR HANDLER APPEARS TO BE LOCATED IN THE
 HOISTWAY ENCLOSURE WHICH IS PROHIBITED PER SECTION
 3002.9 FBC B.
  
 5) GM301: THE CONDENSING UNIT FOR THE MULTI-SPLIT
 SYSTEM IS DESIGNED, AND LISTED AND LABELED FOR OUTDOOR
 INSTALLATION. PLEASE RELOCATE THE CONDENSER TO THE
 OUTDOORS PER THE MANUFACTURER'S SPECIFICATIONS- SECTION
 304.1 FBC M.
  
 6) CLARIFY IF HOISTWAY VENTING WILL BE PROVIDED AND
 PROVIDE DETAILS IF APPLICABLE.
  
 7) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE CO2 AND
 NO2 SENSORS, AND THE CONTROLLER.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-12-28 Cont ID  
Sent By gjohnson Date 2018-12-28 Time 10:14 Rev Time 0.00
Received By gjohnson Date 2018-12-28 Time 10:05 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-10-11 Cont ID  
Sent By gjohnson Date 2018-10-11 Time 15:29 Rev Time 0.00
Received By gjohnson Date 2018-10-11 Time 15:29 Sent To  
Notes
2018-10-11 16:24:431ST REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS:
  
 1. PLEASE PROVIDE A WATER AND SANITARY FOR ELEVATOR
 SUMP PUMP ISOMETRIC DRAWING. PER 107.3.5.1.3(13)
  
 2. PLEASE CLARIFY WHAT THE TOT ON THE STORM STANDS FOR.
 PER WPB AMEND TO FBC 107.2.1
  
 3. SHOW BACK WATER VALVES FOR CONDENSATE ON STORM
 RISER. PER WPB AMEND TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2018-12-20 Cont ID  
Sent By jpearson Date 2018-12-20 Time 10:11 Rev Time 0.00
Received By jpearson Date 2018-12-20 Time 10:11 Sent To  
Notes
2018-12-14 08:52:5312/13/18 HARD COPIES OF BARRIER CABLE PLANS IN LIBRARY.
 LEM

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-09-22 Cont ID  
Sent By jpearson Date 2018-09-22 Time 14:10 Rev Time 0.00
Received By jpearson Date 2018-09-22 Time 14:10 Sent To  
Notes
2018-09-22 14:10:46SEVERAL SHEETS TOWARDS THE END OF FILE ARE NOT
 DIGITALLY SIGNED IN COMPLIANCE WITH FS 471, 481.
 PROVIDE CORRECTION.

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 2 Status P Date 2018-10-29 Cont ID  
Sent By shill Date 2018-10-29 Time 10:45 Rev Time 0.00
Received By shill Date 2018-10-29 Time 10:45 Sent To  
Notes
2018-10-29 10:47:58PASSED UNDER 18071472, FOUNDATION PERMIT
  
 MEP STRUCTURAL ENGINEERING AND INSPECTIONS
 OTTO J. LETZELTER, PE
 JACK BOTHE, BN5957
  
 THRESHOLD INSPECTION PLAN ON PAGE GS004
 THRESHOLD STATEMENT ON ALL PAGES
  
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status F Date 2018-10-26 Cont ID  
Sent By dbattles Date 2018-10-26 Time 15:31 Rev Time 0.00
Received By dbattles Date 2018-10-26 Time 15:31 Sent To  
Notes
2018-10-26 15:34:37[F.S. 553.79(5)]THIS IS A THRESHOLD BUILDING. THE
 FOLLOWING IS REQUIRED PRIOR TO COMMENCEMENT:
  
 1. COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT
 OF UNDERSTANDING; THIS HAS BEEN SENT VIA EMAIL TO
 CONTRACTOR BY DB 10/26/18
  
 2. PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL
 PROPOSED INSPECTORS.
  
  
  
 3. ALL PLANS ARE TO INCLUDE THE THRESHOLD STATEMENT
 REQUIRED BY FS553.79(7)(D). -COMPLETED
  
 (D)ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED TO BE
 SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF
 RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE
 ARCHITECT?S OR ENGINEER?S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRE SAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS CHAPTER 553 AND CHAPTER 633.
  
 4. THRESHOLD INSPECTION PLAN REQUIRED, FS553.79(5)A).
 -COMPLETED
  

Review Stop Z ZONING
Rev No 3 Status P Date 2019-01-29 Cont ID  
Sent By eschneid Date 2019-01-29 Time 11:49 Rev Time 0.00
Received By eschneid Date 2019-01-29 Time 11:49 Sent To  
Notes
2019-01-29 11:55:36PASSED WITH PROVISOS:
  
 1) RESOLUTION NO. 68-18 REQUIRES THAT PRIOR TO THE
 ISSUANCE OF THE CERTIFICATE OF OCCUPANCY/COMPLETION FOR
 THE VALET GARAGE, THE KRAVIS CENTER MUST:
 A. PAY THE CITY FOR THE REMOVAL OF ANY STANDARD PARKING
 SPACES ALONG IRIS STREET. THE TWO ADA SPACES ARE BEING
 REPLACED BY THE RELOCATED TROLLEY STOP AND THUS NO
 COMPENSATION IS REQUIRED FOR THESE SPACES.
 B. SECURE CITY RIGHT-OF-WAY PERMITS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, TO INCLUDE
 CURBING, APRONS, STREET TREES, TREE GRATES,
 LANDSCAPING, IRRIGATION AND LIGHTING.
 C. COMPLETE AND PASS INSPECTIONS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, INCLUDING CURBING,
 APRONS, STREET TREES, TREE GRATES, LANDSCAPING,
 IRRIGATION, LIGHTING AND THE TROLLEY STOP.
 D. AGREE TO A RIGHT-OF-WAY MAINTENANCE AGREEMENT WITH
 THE CITY FOR ALL OF THE SAPODILLA AVENUE AND IRIS
 STREET IMPROVEMENTS.
  
 2) DUE TO THE CHANGES TO THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 68-18, AN AS BUILT MINOR PLANNED
 DEVELOPMENT AMENDMENT FOR ANY CHANGED PLANS IS REQUIRED
 PRIOR TO CO.
  
 3) THE SURFACE LOT REQUIRES SEPARATE PERMIT WITH PLANS.
  

Review Stop Z ZONING
Rev No 2 Status F Date 2018-12-28 Cont ID  
Sent By eschneid Date 2018-12-28 Time 15:09 Rev Time 4.00
Received By eschneid Date 2018-12-28 Time 11:12 Sent To  
Notes
2018-12-28 15:17:56FAILED
  
 PROVIDE WRITTEN RESPONSES TO COMMENTS.
  
 1) REPEAT COMMENT: THE STAIRWELL MULLIONS WERE APPROVED
 WITH DEPTH ON THE EXTERIOR OF THE GLAZING. THE
 SUBMITTED PLANS DO NOT DEMONSTRATE THAT THEY EXTEND
 PAST THE GLAZING. ----- THE RESPONSE STATES THAT THE
 MULLIONS ARE A "PRONOUNCED 1 INCH" BEYOND THE CURTAIN
 WALL. ZONING STAFF STILL COULD NOT DETERMINE WHICH
 DETAIL CLEARLY SHOWS THE 1 INCH PROJECTION.
 ADDITIONALLY, THE RESPONSE STATES THAT BREAK METAL WILL
 BE APPLIED TO THESE MULLIONS TO PROVIDE ADDITIONAL
 DEPTH. THIS WAS ALSO NOT DEMONSTRATED ON THE
 RESUBMITTED PLANS.
  
 2) REPEAT COMMENT: PHOTOMETRICS TO THE EDGE OF THE SITE
 ARE REQUIRED SINCE THERE IS EXTERIOR LIGHTING SHOWN.
 ----- IT APPEARS THAT THIS PERMIT IS TO INCLUDE THE
 ROOFTOP AND CANOPY LIGHTING, SO PHOTOMETRICS ARE
 REQUIRED AS WELL AS DETAILS TO VERIFY THAT THE LIGHTING
 MOUNTED UNDER THE CANOPIES MUST BE FLUSH MOUNTED IN THE
 FIXTURES AND NOT EXTEND BELOW THE LOWEST POINT OF THE
 CANOPY. IF THE LIGHTING WILL BE PART OF A SEPARATE
 PERMIT SUBMITTAL, THEN THIS NEEDS TO BE CLEARLY STATED
 ON THE PLANS AND THIS COMMENT CAN BE RESERVED FOR THE
 LIGHTING PERMIT.
  
 3) PLEASE REMEMBER THAT RESOLUTION NO. 68-18 REQUIRES
 THAT PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF
 OCCUPANCY FOR THE VALET GARAGE, THE KRAVIS CENTER MUST:
 A. PAY THE CITY FOR THE REMOVAL OF ANY STANDARD PARKING
 SPACES ALONG IRIS STREET. THE TWO ADA SPACES ARE BEING
 REPLACED BY THE RELOCATED TROLLEY STOP AND THUS NO
 COMPENSATION IS REQUIRED FOR THESE SPACES.
 B. SECURE CITY RIGHT-OF-WAY PERMITS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, TO INCLUDE
 CURBING, APRONS, STREET TREES, TREE GRATES,
 LANDSCAPING, IRRIGATION AND LIGHTING.
 C. COMPLETE AND PASS INSPECTIONS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, INCLUDING CURBING,
 APRONS, STREET TREES, TREE GRATES, LANDSCAPING,
 IRRIGATION, LIGHTING AND THE TROLLEY STOP.
 D. AGREE TO A RIGHT-OF-WAY MAINTENANCE AGREEMENT WITH
 THE CITY FOR ALL OF THE SAPODILLA AVENUE AND IRIS
 STREET IMPROVEMENTS. BY THIS RESOLUTION, THE CITY
 COMMISSION AUTHORIZES THE MAYOR TO EXECUTE A
 RIGHT-OF-WAY MAINTENANCE AGREEMENT WITH THE KRAVIS
 CENTER FOR THE PERFORMING ARTS.
  
 4) DUE TO THE CHANGES TO THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 68-18, AN AS BUILT MINOR PLANNED
 DEVELOPMENT AMENDMENT FOR ANY CHANGED PLANS IS REQUIRED
 PRIOR TO CO.
  
 5) THE SURFACE LOT REQUIRES SEPARATE PERMIT WITH PLANS.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2018-10-02 Cont ID  
Sent By eschneid Date 2018-10-02 Time 15:46 Rev Time 4.00
Received By eschneid Date 2018-10-02 Time 09:26 Sent To  
Notes
2018-10-02 15:46:59FAILED
  
 PROVIDE WRITTEN RESPONSES TO COMMENTS.
  
 1) THE PARKING TABLE LISTED ON EACH FLOOR LISTS MORE
 PARKING SPACES THAN ARE ACTUALLY PROVIDED ON THAT
 FLOOR. PLEASE EXPLAIN/CORRECT.
  
 2) PROVIDE STRIPING DETAILS FOR THE "PIANO KEYS".
  
 3) ALL WHEEL STOPS ARE TO BE EXACTLY TWO FEET FROM THE
 FRONT END OF THE PARKING SPACE, NOT A MINIMUM OF TWO
 FEET. THIS NEEDS TO BE CLEARLY SHOWN FOR EACH PARKING
 STALL DETAIL.
  
 4) PROVIDE THE CALCULATIONS TO VERIFY THAT A MINIMUM OF
 30% OF THE ROOF DECK IS COVERED BY THE CANOPY
 STRUCTURE.
  
 5) THE USE OF A BRONZE CANOPY ROOF TO MATCH THE
 EXISTING KRAVIS ROOF REQUIRES IT TO HAVE A RIBBED LOOK.
  
 6) PROVIDE VERIFICATION FROM COURTYARDS HOA FOR THE
 PERFORATED CANOPY ROOF.
  
 7) THE ALUMINUM PANEL SYSTEM IS REQUIRED ON THE WEST
 ELEVATION, PER THE CITY COMMISSION APPROVED PLANS.
  
 8) THE STAIRWELL MULLIONS WERE APPROVED WITH DEPTH ON
 THE EXTERIOR OF THE GLAZING. THE SUBMITTED PLANS DO NOT
 DEMONSTRATE THAT THEY EXTEND PAST THE GLAZING.
  
 9) IN ACCORDANCE WITH THE APPROVED ELEVATIONS (AND TO
 MATCH THE EXISTING DREYFOOS HALL), THE BANDING AT THE
 CORNERS OF THE GARAGE NEEDS TO BE RAISED OFF THE PLANE
 OF THE FACADE.
  
 10) THE NORTH ELEVATION (OVER THE VEHICLE EGRESS POINT)
 IS DIFFERENT FROM THE CITY COMMISSION APPROVED PLANS.
 THE PERMIT SET CALLS OUT A PRECAST SPANDREL PANEL
 (PLEASE DESCRIBE WHAT THIS IS) AND SHOWS OPENINGS IN
 THE WALL. THE APPROVED PLANS SHOW BOTH OF THESE AREAS
 AS SOLID STUCCO FINISHED WALLS.
  
 11) THE APPROVED PLANS SHOW THE DECORATIVE BANDS ON THE
 CORNERS OF THE VALET GARAGE GOING TO GRADE. THE
 ELEVATION DRAWINGS SHOW EXPOSED FOUNDATION WHICH DOES
 NOT HAVE THE DECORATIVE BANDING.
  
 12) THE ROOF TOP LIGHT POLES MUST BE SHOWN ON THE
 ELEVATIONS AND INCLUDE THE HEIGHT DIMENSION. PLEASE
 NOTE THAT THEY MAY NOT EXTEND HIGHER THAN THE HIGHEST
 POINT OF THE ROOFTOP CANOPY. THE FIXTURES MUST INCLUDE
 SIDE SPILL GLARE SHIELDS.
  
 13) THE LIGHTING MOUNTED UNDER THE CANOPIES MUST BE
 FLUSH MOUNTED IN THE FIXTURES AND NOT EXTEND BELOW THE
 LOWEST POINT OF THE CANOPY.
  
 14) PHOTOMETRICS TO THE EDGE OF THE SITE ARE REQUIRED
 SINCE THERE IS EXTERIOR LIGHTING SHOWN.
  
 15) THE GARAGE APPROVAL REQUIRES THAT, "THE IRIS STREET
 ACCESS POINT MAY NOT BE USED FOR VALET OPERATIONS AND
 SHALL REMAIN BLOCKED WITH A PHYSICAL BARRIER WHEN THE
 VALET GARAGE IS IN USE." PLEASE EXPLAIN HOW THIS WILL
 OCCUR GIVEN THE FINAL PERMIT DESIGN OF THE GARAGE.
  
 16) PLEASE REMEMBER THAT RESOLUTION NO. 68-18 REQUIRES
 THAT PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF
 OCCUPANCY FOR THE VALET GARAGE, THE KRAVIS CENTER MUST:
 A. PAY THE CITY FOR THE REMOVAL OF ANY STANDARD PARKING
 SPACES ALONG IRIS STREET. THE TWO ADA SPACES ARE BEING
 REPLACED BY THE RELOCATED TROLLEY STOP AND THUS NO
 COMPENSATION IS REQUIRED FOR THESE SPACES.
 B. SECURE CITY RIGHT-OF-WAY PERMITS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, TO INCLUDE
 CURBING, APRONS, STREET TREES, TREE GRATES,
 LANDSCAPING, IRRIGATION AND LIGHTING.
 C. COMPLETE AND PASS INSPECTIONS FOR THE SAPODILLA
 AVENUE AND IRIS STREET IMPROVEMENTS, INCLUDING CURBING,
 APRONS, STREET TREES, TREE GRATES, LANDSCAPING,
 IRRIGATION, LIGHTING AND THE TROLLEY STOP.
 D. AGREE TO A RIGHT-OF-WAY MAINTENANCE AGREEMENT WITH
 THE CITY FOR ALL OF THE SAPODILLA AVENUE AND IRIS
 STREET IMPROVEMENTS. BY THIS RESOLUTION, THE CITY
 COMMISSION AUTHORIZES THE MAYOR TO EXECUTE A
 RIGHT-OF-WAY MAINTENANCE AGREEMENT WITH THE KRAVIS
 CENTER FOR THE PERFORMING ARTS.
  
 17) DUE TO THE CHANGES TO THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 68-18, AN AS BUILT MINOR PLANNED
 DEVELOPMENT AMENDMENT FOR ANY CHANGED PLANS IS REQUIRED
 PRIOR TO CO.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved