Plan Review Details - Permit 18090245
Plan Review Stops For Permit 18090245
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-10-10 Cont ID  
Sent By cthroop Date 2018-10-10 Time 14:43 Rev Time 0.00
Received By cthroop Date 2018-10-10 Time 14:37 Sent To Z
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-09-18 Cont ID  
Sent By cthroop Date 2018-09-18 Time 08:29 Rev Time 0.00
Received By cthroop Date 2018-09-18 Time 07:08 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-09-14 Cont ID  
Sent By jleahy Date 2018-09-14 Time 16:42 Rev Time 0.00
Received By jleahy Date 2018-09-14 Time 16:35 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-09-14 Cont ID  
Sent By pleduc Date 2018-09-14 Time   Rev Time 0.00
Received By pleduc Date 2018-09-14 Time 11:54 Sent To  
Notes
2018-09-14 15:20:48THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
  
 1) THERE ARE NO CLEAR INDICATIONS OF LIGHTNING
 PROTECTION.
  
 LIGHTNING PROTECTION SHALL COMPLY WITH NFPA 780,
 INSTALLATION OF LIGHTNING PROTECTION SYSTEMS
  
 CHAPTER 12 PROTECTION FOR SOLAR ARRAYS
 12.1 GENERAL. THE INTENT OF THIS CHAPTER SHALL BE TO
 PROVIDE
 LIGHTNING PROTECTION REQUIREMENTS FOR ROOF-MOUNTED OR
 GROUND-MOUNTED SOLAR (PHOTOVOLTAIC AND THERMAL) PANELS.
 12.2 FUNDAMENTAL PRINCIPLES OF PROTECTION.
 12.2.1 ROOF-MOUNTED OR GROUND-MOUNTED SOLAR PANELS
 SUBJECT
 TO DIRECT LIGHTNING STRIKE SHALL BE PROTECTED IN
 ACCORDANCE
 WITH CHAPTER 4 AND AS SUPPLEMENTED IN THIS CHAPTER.
 12.2.2 PROTECTION SHALL BE PROVIDED BY ONE OR MORE OF
 THE
 FOLLOWING METHODS:
 (1) DIRECT MOUNTING OF STRIKE TERMINATION DEVICES TO
 THE SOLAR
 PANEL
 (2) DIRECT MOUNTING OF STRIKE TERMINATION DEVICES TO
 THE SOLAR
 PANEL FRAMING
 (3) LOCATING STRIKE TERMINATION DEVICES (INCLUDING AIR
 TERMINALS,
 MASTS, AND OVERHEAD GROUND WIRES) ADJACENT TO THE
 SOLAR PANELS IN SUCH A MANNER AS TO PLACE THE SOLAR
 PANELS
 IN A ZONE OF PROTECTION AS DEFINED IN SECTION 4.8
 12.3 STRIKE TERMINATION DEVICES.
 12.3.1 STRIKE TERMINATION DEVICES SHALL EXTEND A
 MINIMUM OF
 10 IN. (254 MM) VERTICALLY ABOVE THE APEX OF THE SOLAR
 PANEL.
 12.3.2 STRIKE TERMINATION DEVICES SHALL BE LOCATED AT
 THE ENDS
 OF THE UPPERMOST EDGE OR NEAREST SUPPORT OF PITCHED
 SOLAR
 PANELS OR PANEL ARRAYS NOT TO EXCEED 2 FT (0.6 M) FROM
 THE END
 OF THE PANEL OR ARRAY UNLESS THE UPPERMOST EDGE OR
 NEAREST
 SUPPORT IS WITHIN A ZONE OF PROTECTION.
 12.3.3 STRIKE TERMINATION DEVICES SHALL BE LOCATED
 ALONG THE
 UPPERMOST EDGE OF SOLAR PANELS OR PANEL ARRAYS AT
 INTERVALS NOT
 EXCEEDING 20 FT (6 M) UNLESS THE PANEL ARRAYS ARE
 WITHIN A ZONE
 OF PROTECTION.
  
  
 PLEASE PROVIDE THE REQUIRED PROTECTION.
  
  
 2) THE POWER DICONNECT SHALL BE CLEARED MARKED WITH
 AREA DIRECTIONAL SIGNAGE IF NEEDED.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-10-12 Cont ID  
Sent By cpuell Date 2018-10-12 Time 09:22 Rev Time 0.00
Received By cpuell Date 2018-10-03 Time 09:41 Sent To  
Notes
2018-10-05 09:42:07RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-19 Cont ID  
Sent By cpuell Date 2018-09-19 Time 12:51 Rev Time 0.00
Received By cpuell Date 2018-09-07 Time 08:23 Sent To  
Notes
2018-09-12 08:23:59B06

Review Stop Z ZONING
Rev No 2 Status P Date 2018-10-11 Cont ID  
Sent By eschneid Date 2018-10-11 Time 16:52 Rev Time 0.25
Received By eschneid Date 2018-10-11 Time 16:51 Sent To PC
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-09-19 Cont ID  
Sent By eschneid Date 2018-09-19 Time 09:03 Rev Time 0.50
Received By eschneid Date 2018-09-19 Time 09:03 Sent To PC
Notes
2018-09-19 09:29:54FAILED
  
 1) PROVIDE A SURVEY/SITE PLAN SHOWING THE SETBACKS OF
 THE PROPOSED SOLAR CANOPIES FROM THE SEAWALL.
  
 A. A 15 FOOT SETBACK IS REQUIRED.
 B. THE SETBACK IS MEASURED TO THE OUTSIDE EDGE OF THE
 COLUMN OR THE FURTHEST PROJECTION OF THE ROOF,
 WHICHEVER IS CLOSER TO THE PROPERTY LINE.
  
 2) THE SURVEY/SITE PLAN NEEDS TO CLEARLY SHOW THE
 ORIENTATION OF THE THE SOLAR CANOPIES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]