Plan Review Details - Permit 18081474
Plan Review Stops For Permit 18081474
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-09-26 Cont ID  
Sent By rmcdouga Date 2018-09-26 Time 14:52 Rev Time 0.00
Received By rmcdouga Date 2018-09-26 Time 14:28 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-10-16 Cont ID  
Sent By fgiaquin Date 2018-10-16 Time 07:12 Rev Time 0.00
Received By fgiaquin Date 2018-10-16 Time 06:54 Sent To G
Notes
2018-10-16 07:11:59PASSED PROVISIONALLY:
  
 PROVIDE LOAD CALC FOR FINAL NOT SIZING REPORT.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-09-17 Cont ID  
Sent By fgiaquin Date 2018-09-17 Time 07:22 Rev Time 0.00
Received By fgiaquin Date 2018-09-17 Time 07:04 Sent To  
Notes
2018-09-17 07:22:40ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. SHOW SIZE OF EXISITNG METER MAIN COMBO AND CONDUCTOR
 SIZES. SHOW SUB-PANELS BEING FROM FROM ATS'S AND
 CONDUCTOR SIZES. FBC 107.2.1
  
 2. PLANS SHOWS 6, #2/0 CONDUCTORS IN ONE 2'' CONDUIT.
 INSUFFICIENT SIZED CONDUIT. PROVIDE CORRECTION.
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WPB
 [email protected]
 CELL: 561-657-1653
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-10-16 Cont ID  
Sent By lcrespo Date 2018-10-16 Time 07:23 Rev Time 0.00
Received By lcrespo Date 2018-10-16 Time 07:23 Sent To  
Notes
2018-10-16 07:24:3110/16/18 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-09-14 Cont ID  
Sent By lcrespo Date 2018-09-14 Time 19:06 Rev Time 0.00
Received By lcrespo Date 2018-09-14 Time 19:06 Sent To  
Notes
2018-09-14 19:37:5709/14/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. I
 HAVE PUT AN ISOMETRIC OF EXISTING GAS SYSTEM PLEASE AND
 TO PLANS AND SHOW YOUR WORK, 2017 FBC FUEL GAS RES.
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3
  
 2. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC FUEL GAS
 RES. SEC. G2413.
  
 3. THE SPECIFICATION FOR GENERAC SAYS 281 BTU AT FULL
 LOAD AND YOU HAVE 330 BTU ON YOUR PLANS, PLEASE CORRECT
 AND CLARIFY. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON
 THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED
 CONTRACT. WPB AMENDMENTS TO THE FBC 109.3. BUILDING
 PERMITS VALUATIONS. . IF IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
 5. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC FUEL
 GAS RES SECS. G2413.4.1, G2413.4.2
  
 6. A LISTED SHUTOFF VALVE SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH MP REGULATOR. 2017 FBC FBC
 FUEL GAS RES. SEC. G2420.4.
  
 7. REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. 2017 FBC
 FUEL GAS RES. SEC. G2421.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-10-16 Cont ID  
Sent By lcrespo Date 2018-10-16 Time 07:23 Rev Time 0.00
Received By lcrespo Date 2018-10-03 Time 09:23 Sent To  
Notes
2018-10-05 09:23:15RESUB ROUTED TO FGIAQUINTO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-26 Cont ID  
Sent By rmcdouga Date 2018-09-26 Time 14:52 Rev Time 0.00
Received By rmcdouga Date 2018-08-30 Time 11:46 Sent To  
Notes
2018-08-31 11:46:51ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-09-11 Cont ID  
Sent By mcruz Date 2018-09-11 Time 08:07 Rev Time 0.00
Received By mcruz Date 2018-09-11 Time 08:05 Sent To B
Notes
***NONE***