Plan Review Details - Permit 18081443
Plan Review Stops For Permit 18081443
Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date   Cont ID  
Sent By sathomas Date 2018-10-18 Time 00:00 Rev Time 0.00
Received By   Date 2018-10-18 Time 00:00 Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date   Cont ID  
Sent By sathomas Date 2018-10-05 Time 00:00 Rev Time 0.00
Received By   Date 2018-10-05 Time 00:00 Sent To I
Notes
2018-10-05 13:32:09ORIGINAL COMMENTS WERE NOT ADDRESSED:
  
 INSUFFICIENT INFORMATION - PLEASE PROVIDE
 "MANUFACTURER'S SPECIFICATION SHEETS" FOR THE NOZZLES
 AND FUSIBLE LINKS.
 RE-EVALUATE NUMBER OF FLOWS USED.
 PROVIDE AN IN DEPTH LAYOUT OF MACHINERY AND DEVICE
 PLACEMENT, AS IT APPEARS THAT THERE ARE NOZZLES ABOVE
 THE PLENUM.
  
 S. THOMAS
 561-804-4728

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date   Cont ID  
Sent By sathomas Date 2018-09-04 Time 00:00 Rev Time  
Received By   Date 2018-09-04 Time 00:00 Sent To M
Notes
2018-09-04 14:43:15INSUFFICIENT INFORMATION - PLEASE PROVIDE SPECIFICATION
 SHEETS FOR NOZZLES AND FUSIBLE LINKS.
 RE-EVALUATE NUMBER OF FLOWS USED.
 PROVIDE AN IN DEPTH LAYOUT OF MACHINERY AND DEVICE
 PLACEMENT, AS IT APPEARS THAT THERE ARE NOZZLES ABOVE
 THE PLENUM.
  
 S. THOMAS
 561-804-4728

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2018-10-25 Time   Rev Time 0.00
Received By lmarchan Date 2018-10-12 Time 12:38 Sent To  
Notes
2018-10-15 12:38:50RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2018-10-11 Time   Rev Time 0.00
Received By cpuell Date 2018-09-28 Time 11:17 Sent To FIRE
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2018-09-21 Time   Rev Time 0.00
Received By lmarchan Date 2018-08-29 Time 14:19 Sent To  
Notes
2018-08-30 14:19:53ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2018-10-25 Cont ID  
Sent By ccole Date 2018-10-25 Time 11:31 Rev Time 0.00
Received By ccole Date 2018-10-25 Time 11:31 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2018-10-11 Cont ID  
Sent By ccole Date 2018-10-11 Time 11:53 Rev Time 0.00
Received By ccole Date 2018-10-11 Time 11:53 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2018-09-21 Cont ID  
Sent By ccole Date 2018-09-21 Time 15:31 Rev Time 0.00
Received By ccole Date 2018-09-21 Time 15:31 Sent To  
Notes
2018-09-21 15:38:441ST REVIEW FBC-2017 MECHANICAL
  
 CODES IN EFFECT:
  
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE $1300.00 JOB COST APPEARS UNDERVALUED FOR THE
 SCOPE OF THE PROJECT. PLEASE REFER TO SECTION 109.3 WPB
 AND PROVIDE DETAILED ESTIMATES AND/OR BONA FIDE
 CONTRACTS FOR ALL PHASES OF THE PROJECT INCLUDING
 LABOR, MATERIALS AND EQUIPMENT.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-09-21 Cont ID  
Sent By ccole Date 2018-09-21 Time 15:17 Rev Time 0.00
Received By ccole Date 2018-09-21 Time 15:17 Sent To  
Notes
***NONE***