Plan Review Stops For Permit 18080789 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2018-09-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-09-28 |
Time |
18:42 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-09-28 |
Time |
18:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2018-09-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-09-14 |
Time |
18:11 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-09-14 |
Time |
16:32 |
Sent To |
|
|
Notes |
2018-09-14 18:13:17 | SIGN SECOND BUILDING REVIEW COMMENTS | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | ORIGINAL COMMENT: | | 1- A) PROVIDE SIGNED AND SEALED DRAWINGS (2 COPIES) | | WITH COMPLETE DESIGN CRITERIA INCLUDING THE CURRENT | | BUILDING CODE, ULTIMATE DESIGN WIND SPEED AND NOMINAL | | DESIGN WIND SPEED, WIND EXPOSURE, RISK CATEGORY AND | | DESIGN WIND PRESSURES. AS REQUIRED BY SEC. 1603.1.4 | | FBC. | | | | RESPONSE: | | ENGINEER OF RECORD NEED TO PROVIDE ORIGINAL SEAL AND | | SIGNATURE ON ALL DRAWINGS AS REQUIRED BY SEC. | | 61G15-23.003 FAC. DRAWINGS SUBMITTED HAVE A DIGITAL | | SIGNATURE. THIS IS NOT A DIGITAL SUBMITTAL. NEED TO | | PROVIDE COPIES OF DRAWINGS WITH ORIGINAL SEAL AND | | SIGNATURE. | | | | 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND | | SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | DOCUMENTS. | | ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN | | ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, | | F.S., AND RULE 61G15-23.001, F.A.C. MAY BE PHYSICALLY | | SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE | | PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. | | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE | | LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE | | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR | | COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE | | USED. | | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY | | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY | | OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE | | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL | | NOT RENDER THE SIGNATURE ILLEGIBLE. | | RULEMAKING AUTHORITY 471.025(1), 668.006 FS. LAW | | IMPLEMENTED 471.025 FS. HISTORY?NEW 8-18-98, AMENDED | | 9-4-05, 5-6-09, 1-5-12, 8-20-12, 12-10-13, 11-3-15. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-08-27 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-08-27 |
Time |
09:31 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-08-27 |
Time |
09:13 |
Sent To |
E |
|
Notes |
2018-08-27 09:53:32 | BUILDING REVIEW COMMENTS | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- A) PROVIDE SIGNED AND SEALED DRAWINGS (2 COPIES) | | WITH COMPLETE DESIGN CRITERIA INCLUDING THE CURRENT | | BUILDING CODE, ULTIMATE DESIGN WIND SPEED AND NOMINAL | | DESIGN WIND SPEED, WIND EXPOSURE, RISK CATEGORY AND | | DESIGN WIND PRESSURES. AS REQUIRED BY SEC. 1603.1.4 | | FBC. | | | | B) CLEARLY SPECIFY ALL STRUCTURAL CONNECTORS SIZE, | | NUMBER AND LOCATION THAT REFLECTS PROPOSED SIGN. NOTE: | | THE PROPOSED SIGN ARE NOT INDIVIDUAL LETTERS. SEC. 1609 | | FBC. | | | | 2- VALUATION DECLARED IN THE PERMIT APPLICATION SEEM TO | | BE LOW. VALUATION TO INCLUDE ALL LABOR MATERIALS, | | CONTRACTORS' OVERHEAD AND PROFIT AND | | DESIGN-PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY | | AMENDMENTS.. REVISE AS REQUIRED. PROVIDE COPY OF SIGNED | | CONTRACT. | | | | 3- NEED RECORDED NOTICE OF COMMENCEMENT. SEC. 713 F.S. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2018-09-27 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-09-27 |
Time |
07:54 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-09-27 |
Time |
07:54 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2018-09-14 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-09-14 |
Time |
09:09 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-09-14 |
Time |
09:09 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-08-31 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-08-31 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-08-31 |
Time |
12:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
3 |
Status |
P |
Date |
2018-09-26 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-09-26 |
Time |
14:39 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-09-26 |
Time |
14:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2018-09-07 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-09-07 |
Time |
15:21 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-09-07 |
Time |
15:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2018-08-22 |
|
|
Cont ID |
|
Sent By |
destabro |
Date |
2018-08-22 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
destabro |
Date |
2018-08-22 |
Time |
13:36 |
Sent To |
B |
|
Notes |
2018-08-22 13:36:58 | 8/22/2018 - MEETS DESIGN GUIDELINES OF HISTORIC | | DISTRICT. DLE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-09-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-09-28 |
Time |
18:42 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-09-20 |
Time |
11:34 |
Sent To |
I |
|
Notes |
2018-09-21 11:34:24 | RESUB ROUTED TO HISTORIC INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-09-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2018-09-14 |
Time |
18:29 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2018-09-06 |
Time |
14:01 |
Sent To |
I |
|
Notes |
2018-09-07 14:01:36 | RESUB ROUTED TO HISTORIC INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-08-31 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-08-31 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-08-15 |
Time |
12:39 |
Sent To |
|
|
Notes |
2018-08-16 12:39:25 | ROUTED TO HISTORIC INBOX |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2018-09-26 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-09-26 |
Time |
14:40 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-09-26 |
Time |
14:40 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-09-07 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-09-07 |
Time |
15:21 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-09-07 |
Time |
15:21 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-08-22 |
|
|
Cont ID |
|
Sent By |
destabro |
Date |
2018-08-22 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
destabro |
Date |
2018-08-22 |
Time |
13:36 |
Sent To |
HIST |
|
Notes |
2018-08-22 13:36:34 | 8/22/2018 - MEETS SIGN REQUIREMENTS PER LDR SEC. | | 94-408. DLE |
|
|