Plan Review Stops For Permit 18080228 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-08-06 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2018-08-06 |
Time |
12:34 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2018-08-06 |
Time |
12:34 |
Sent To |
|
|
Notes |
2018-08-06 12:36:18 | | | R908.6 FLASHINGS. | | FLASHINGS SHALL BE RECONSTRUCTED IN ACCORDANCE WITH | | APPROVED MANUFACTURERS INSTALLATION INSTRUCTIONS OR IN | | COMPLIANCE WITH RAS 111. METAL FLASHING TO WHICH | | BITUMINOUS MATERIALS ARE TO BE ADHERED SHALL BE PRIMED | | PRIOR TO INSTALLATION. | | R908.7 WIND MITIGATION. | | WHEN A ROOF COVERING ON AN EXISTING SITE-BUILT | | SINGLE-FAMILY RESIDENTIAL STRUCTURE IS REMOVED AND | | REPLACED, THE FOLLOWING PROCEDURES SHALL BE PERMITTED | | TO BE PERFORMED BY THE ROOFING | | CONTRACTOR:(A)ROOF-DECKING ATTACHMENT SHALL BE AS | | REQUIRED BY SECTION R908.7.1. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-08-06 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2018-08-06 |
Time |
12:34 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2018-08-06 |
Time |
11:17 |
Sent To |
|
|
Notes |
2018-08-06 11:17:31 | GIVEN TO SKENNEDY. CP |
|
|
|