Plan Review Details - Permit 18071155
Plan Review Stops For Permit 18071155
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-31 Cont ID  
Sent By cthroop Date 2018-07-31 Time 14:02 Rev Time 0.00
Received By cthroop Date 2018-07-31 Time 14:00 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-31 Cont ID  
Sent By jleahy Date 2018-07-31 Time 15:51 Rev Time 0.00
Received By jleahy Date 2018-07-31 Time 15:51 Sent To G
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-08-06 Cont ID  
Sent By scaldero Date 2018-08-06 Time 10:59 Rev Time 0.00
Received By scaldero Date 2018-08-06 Time 10:57 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-08-22 Cont ID  
Sent By lcrespo Date 2018-08-22 Time 18:46 Rev Time 0.00
Received By lcrespo Date 2018-08-22 Time 18:46 Sent To  
Notes
2018-08-22 18:46:5508/22/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING/GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-08-01 Cont ID  
Sent By lcrespo Date 2018-08-01 Time 17:50 Rev Time 0.00
Received By lcrespo Date 2018-08-01 Time 17:50 Sent To  
Notes
2018-08-01 18:08:0308/01/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE LABEL TYPE OF GAS. WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 2. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS SEC.
 409.4.
 3. LIST THE BTU LOAD ON THE SYSTEM. REFER TO THE 2017
 FBC FUEL GAS SECS. 401.8 THROUGH 402.6.1 AND TABLES
 402.4 (1) THROUGH 402.4 (37).
 4. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC FUEL GAS SEC. 402.2 OR 2017
 FBC FUEL GAS RES. SEC. G2413.2.
 5. SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS SEC.305.1 OR
 2017 FBC FUEL GAS RES. SEC. G2408.1.
 6. SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR ANOTHER STANDARD THAT WAS USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37).
 7. THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR
 SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR
 SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE
 GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200.
 8. APPLICATION IS FOR A GENERAL CONTRACTOR AND WILL
 NEED TO CHANGE PERMIT STATUS. WPB AMENDMENTS TO THE FBC
 SEC. 105.1
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-22 Cont ID  
Sent By lcrespo Date 2018-08-22 Time 18:46 Rev Time 0.00
Received By lcrespo Date 2018-08-16 Time 15:08 Sent To  
Notes
2018-08-17 15:09:09RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-08-06 Cont ID  
Sent By cpuell Date 2018-08-06 Time 13:10 Rev Time 0.00
Received By cpuell Date 2018-07-25 Time 14:57 Sent To  
Notes
2018-08-01 18:03:008/1 TO FIRE BOX
  
2018-07-26 14:57:52ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2018-08-22 Cont ID  
Sent By mcruz Date 2018-08-22 Time 15:42 Rev Time 0.00
Received By mcruz Date 2018-08-22 Time 15:42 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-07-27 Cont ID  
Sent By mcruz Date 2018-07-27 Time 14:05 Rev Time 0.00
Received By mcruz Date 2018-07-27 Time 13:59 Sent To PC
Notes
2018-07-27 14:05:55ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) IT APPEARS THE PROPOSED LOCATION OF THE GENERATOR IS
 WITHIN AN EXISTING HANDICAP PARKING SPACE. PLEASE
 CLARIFY.
  
 NOTE: THE SUBMITTAL OF THE REQUESTED INFORMATION MAY
 GENERATE ADDITIONAL COMMENTS.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]