Plan Review Details - Permit 18071153
Plan Review Stops For Permit 18071153
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-08-14 Cont ID  
Sent By cthroop Date 2018-08-14 Time 12:32 Rev Time 0.00
Received By cthroop Date 2018-08-14 Time 12:25 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-08-03 Cont ID  
Sent By cthroop Date 2018-08-03 Time 11:11 Rev Time 0.00
Received By cthroop Date 2018-08-03 Time 11:05 Sent To P
Notes
2018-08-03 11:14:43BUILDING PLAN REVIEW
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER, PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE MANUFACTURERS INSTALLATION INSTRUCTIONS FOR
 FIREPLACE.
 2. PROVIDE MANUFACTURERS INSTALLATION INSTRUCTIONS FOR
 SAUNA HEATER.
 3. PROVIDE FRAMING DETAIL FOR SAUNA BENCH.
 4. PROVIDE DETAIL FOR SAUNA CEILING.
  
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE
 DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY
 TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK
 PROPOSED AND SHOW IN DETAIL THAT IT WILL CONFORM TO THE
 PROVISIONS OF THIS CODE AND RELEVANT LAWS, ORDINANCES,
 RULES AND REGULATIONS, AS DETERMINED BY THE BUILDING
 OFFICIAL.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-08-02 Cont ID  
Sent By jleahy Date 2018-08-02 Time 13:16 Rev Time 0.00
Received By jleahy Date 2018-08-02 Time 13:16 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-14 Cont ID  
Sent By cthroop Date 2018-08-14 Time 12:32 Rev Time 0.00
Received By cthroop Date 2018-08-09 Time 13:33 Sent To  
Notes
2018-08-10 13:33:41RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-08-06 Cont ID  
Sent By lcrespo Date 2018-08-06 Time 17:18 Rev Time 0.00
Received By lcrespo Date 2018-07-25 Time 12:40 Sent To  
Notes
2018-07-26 12:40:13REVISION ROUTED TO JLEAHY

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-08-13 Cont ID  
Sent By lcrespo Date 2018-08-13 Time 16:43 Rev Time 0.00
Received By lcrespo Date 2018-08-13 Time 16:43 Sent To  
Notes
2018-08-13 16:45:1408/13/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-08-06 Cont ID  
Sent By lcrespo Date 2018-08-06 Time 17:18 Rev Time 0.00
Received By lcrespo Date 2018-08-06 Time 17:18 Sent To  
Notes
2018-08-06 17:20:1408/06/2018 1ST GAS REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TWO COPIES MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL EQUIPMENT
 (FIREPLACE) TO VERIFY COMPLIANCE.
 2. SUBMIT TWO COPIES OF DETAIL SHOWING THE TYPE,
 LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE THE
 ROOF AND ANCHORING DETAILS OF THE GAS VENT FOR
 FIREPLACE.
 3. FIRE PLACE MANUFACTURES INSTALLATION INSTRUCTION
 SHALL BE ON SITE AT TIME OF INSTALLATION.
 4. PLANS CALL FOR A STEAM SHOWER PLEASE PROVIDE
 LOCATION AND SPECIFICATION FOR THE STEAM GENERATOR,
 PLEASE PROVIDE MANUFACTURE SPECIFICATION. IF THE STEAM
 UNIT IS UNDER A SHOWER SEAT, HOW IS THE STEAM ENTERING
 THE SHOWER? WHERE IS THE DISCHARGE OF THE UNIT GOING TO
 DUMP IN? PLEASE CLARIFY WHAT TYPE OF PROTECTION IS
 BEING USED AND SHOW WHERE IT GOING IN THE SHOWER. WPB
 AMENDMENTS TO THE FBC 107.2.1
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved