Plan Review Details - Permit 18071087
Plan Review Stops For Permit 18071087
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-08-15 Cont ID  
Sent By lcrespo Date 2018-08-15 Time 11:18 Rev Time 0.00
Received By lcrespo Date 2018-08-15 Time 11:18 Sent To  
Notes
2018-08-15 11:19:2408/15/18 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-07-30 Cont ID  
Sent By tklarge Date 2018-07-30 Time 05:46 Rev Time 0.00
Received By tklarge Date 2018-07-28 Time 09:32 Sent To I
Notes
2018-07-28 10:16:471) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER PER
 THE 2017 FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES
 DRYERS) OR 2017 FBC-RES. SEC.G 2407.1 AND G2439.4.
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 3) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 4) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3. THE SIZING TABLES THAT
 HAVE BEEN SUBMITTED ARE FROM A PREVIOUS EDITION OF THE
 CODE.
 5) SHOW THE TOTAL LENGTH OF THE PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET ON THE 2 PSI
 SYSTEM AND FOR THE LOW PRESSURE SYSTEM. 2017 FBC-FUEL
 GAS SEC.402.4.1.
 6) THE GAS RISER SHOWS A 2 PSI SYSTEM TO THE INTERIOR
 BUT IT ALSO SHOWS AN MP REGULATOR ON THE EXTERIOR OF
 THE STRUCTURE. HOW CAN YOU HAVE 2 PSI INTO THE
 STRUCTURE IF YOU HAVE A REGULATOR ON THE LINE ON THE
 EXTERIOR OF THE BUILDING? CLARIFY.
 7) IDENTIFY WHICH LINE IS THE 2 PSI LINE AND WHICH ONE
 IS THE 1/2 PSI LINE ON BOTH GAS RISERS. IT IS
 DIFFFICULT TO TELL WHICH ONE IS WHICH. WPB AMEND. TO
 FBC SEC. 107.2.1.
 8) LIST THE CORRESPONDING EHD FOR THE CSST ON THE GAS
 RISERS. WPB AMEND. TO FBC SEC. 107.2.1.
 9) INDICATE THE TYPE AND SIZE OF THE PIPE AT THE OUTLET
 OF THE GAS METER. WPB AMEND. TO FBC SEC. 107.2.1.
 10) THE TOTAL RUN OF THE LOW PRESSURE SYSTEN ON THE GAS
 RISER ADDS TO 100 FEET, NOT 90 FEET AS SHOWN. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-15 Cont ID  
Sent By lcrespo Date 2018-08-15 Time 11:19 Rev Time 0.00
Received By lcrespo Date 2018-08-10 Time 13:30 Sent To  
Notes
2018-08-10 13:31:04TO TKL DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-30 Cont ID  
Sent By tklarge Date 2018-07-30 Time 05:47 Rev Time 0.00
Received By tklarge Date 2018-07-24 Time 13:46 Sent To  
Notes
2018-07-25 13:46:35ROUTED TO PLUMBING INBOX


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved