Plan Review Stops For Permit 18070907 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-07-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:01 |
Sent To |
I |
|
Notes |
2018-07-31 11:16:21 | BUILDING PROVISO | | | | 1) SUBMIT A COPY OF THE SIGNED CONTRACT TO VERIFY THE | | VALUATION. FBC 109.3 BUILDING PERMIT VALUATION. FOR | | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS | | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | 2) NOTE: FBC-R4501.19 FINAL INSPECTION. FINAL | | ELECTRICAL AND BARRIER CODE INSPECTION SHALL BE | | COMPLETED PRIOR TO FILLING THE POOL WITH WATER. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-07-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-07-26 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-07-26 |
Time |
15:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2018-07-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-28 |
Time |
05:58 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:54 |
Sent To |
|
|
Notes |
2018-07-28 05:58:14 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-08-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-09 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-09 |
Time |
09:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-08-08 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-08 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-06 |
Time |
14:08 |
Sent To |
|
|
Notes |
2018-08-07 14:08:55 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:16 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-19 |
Time |
15:15 |
Sent To |
|
|
Notes |
2018-07-20 15:16:02 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2018-08-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-09 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-09 |
Time |
09:32 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2018-08-08 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-08 |
Time |
06:45 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-08 |
Time |
06:36 |
Sent To |
I |
|
Notes |
2018-08-08 06:43:51 | 1) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | CALCULATIONS.2ND REQUEST. | | 2) INSERT THE REVISED DRAWINGS INTO BOTH SETS OF PLANS. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-07-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-28 |
Time |
06:03 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:54 |
Sent To |
|
|
Notes |
2018-07-28 06:03:48 | 1) THE VALUE OF THIS PROJECT STATED ON THE PERMIT | | APPLICATION APPEARS LOW. SUBMIT A DETAILED ESTIMATE OR | | A BONA FIDE SIGNED CONTRACT SHOWING THE FULL VALUE OF | | THIS JOB PER THE WPB AMEND. TO FBC SEC. 109.3. | | 2) THE TDH RESULTS HAVE BEEN SUBMITTED BUT NOT THE | | CALCULATIONS. SUBMIT THE TOTAL DYNAMIC HEAD | | CALCULATIONS FOR REVIEW. | | 3) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | CALCULATIONS. | | | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-07-25 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-07-25 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-25 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|