Plan Review Stops For Permit 18070824 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-08-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-08-30 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-08-30 |
Time |
08:09 |
Sent To |
I |
|
Notes |
2018-08-30 08:11:05 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | FILLING THE POOL WITH WATER. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-07-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
19:32 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-30 |
Time |
19:22 |
Sent To |
I |
|
Notes |
2018-07-30 19:32:43 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE VALUATION OF THE POOL ON THE APPLICATION APPEARS | | TO BE LOW. SUBMIT A COPY OF THE SIGNED CONTRACT TO | | VERIFY THE VALUATION. FBC 109.3 BUILDING PERMIT | | VALUATION. FOR PERMITTING PURPOSES, VALUATION OF | | BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE | | TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, | | INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND | | DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT; | | EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY | | INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL | | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, | | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE | | CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET | | BY THE BUILDING OFFICIAL. | | | | 2) AN APPLICATION FOR THE POOL ELECTRICAL SUB-PERMIT IS | | REQUIRED TO BE SUBMITTED BEFORE THE POOL PERMIT CAN BE | | ISSUED. | | | | 3) NOTE: FBC-R4501.19 FINAL INSPECTION. FINAL | | ELECTRICAL AND BARRIER CODE INSPECTION SHALL BE | | COMPLETED PRIOR TO FILLING THE POOL WITH WATER. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-07-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-07-26 |
Time |
15:34 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-07-26 |
Time |
15:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2018-07-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-28 |
Time |
05:23 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:21 |
Sent To |
|
|
Notes |
2018-07-28 05:23:41 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A | | CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE | | COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS | | WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1. | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | FBC-R, SEC. G2404.3. | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL | | GAS SEC. 301.3. | | | | A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-08-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-08-30 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-08-21 |
Time |
14:14 |
Sent To |
|
|
Notes |
2018-08-22 14:14:48 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
19:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-18 |
Time |
14:18 |
Sent To |
|
|
Notes |
2018-07-19 14:18:33 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2018-08-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-29 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-29 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-07-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-28 |
Time |
05:33 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:21 |
Sent To |
|
|
Notes |
2018-07-28 05:15:59 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING | | SYSTEM INCLUDING THE FILTER. | | | | 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | CALCULATIONS. | | | | 3) THE VALUE LISTED FOR THE POOL ON THE APPLICATION | | APPEARS LOW. SUBMIT A COPY OF A BONA FIDE SIGNED | | CONTRACT FOR THGIS WORK. WPB AMEND. TO FBC SEC. | | 107.2.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-07-24 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-07-24 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-24 |
Time |
14:21 |
Sent To |
|
|
Notes |
|
|