Plan Review Stops For Permit 18070813 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-08-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-08-29 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-08-28 |
Time |
19:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-07-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-31 |
Time |
08:06 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-31 |
Time |
08:06 |
Sent To |
|
|
Notes |
2018-07-31 09:15:55 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE ENGINEER'S ROOF PRESSURE DRAWINGS ON SHEET S-1 | | SHOWS THE SOLAR POOL HEATER PANELS LOCATED IN ROOF ZONE | | 2 WITH AN UPLIFT PRESSURE OF -66.31 PSF. THE 4" LAG | | BOLTS WITH 3.5 INCHES OF THREAD HAVE A MAXIMUM PRESSURE | | OF 65 PSF. FBC-R301.2.1 | | | | 2) THE SIZE OF THE PANELS THAT WILL BE INSTALL HAS NOT | | BEEN PROVIDED. FBC-R107.2.1 | | | | 3) THE SPACING OF THE TOP HEADER ANCHORS IS NOT | | SPECIFIED. FBC-R 301.1 | | | | 4) THE ANCHORING OF THE BOTTOM HEADER AND THE | | SUPPLY/RETURN PIPING WAS NOT SPECIFIED. FBC-R301.1 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2018-10-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-09-27 |
Time |
17:18 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-09-27 |
Time |
17:18 |
Sent To |
I |
|
Notes |
2018-09-27 17:23:05 | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | NOTHING IN THE PAPER WORK SHOWS THE REQUIRED GF | | PROTECTION 690.5, AND ARC FAULT PROTECTION 690.11 FOR | | THE CONTROLLER. | | | | ALSO NEED TO KNOW HOW POOL IS TO BE BONDED??? 680.26, | | IS THERE AC POWER IN THE POOL? LIGHT? CLORINATOR? | | | | PLEASE SUBMIT DIAGRAM SHOWING ALL POOL EQUIPMENT. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2018-08-29 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-08-29 |
Time |
12:48 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-08-29 |
Time |
12:48 |
Sent To |
|
|
Notes |
2018-08-29 13:41:36 | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | I MISSED THAT THIS WAS A POOL PUMP FIRST TIME AROUND. | | | | I WILL NEED THE CUTSHEETS FOR THE CONTROLER AND PUMP | | SHOWING THAT IT IS LISTED FOR USE WITH A POOL. | | | | 690.5 REQUIRES GF PROTECTION | | 690.11 REQUIRES ARC FAULT PROTECTION | | | | COULD NOT FIND PS800 CONTROLER. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-07-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-07-20 |
Time |
15:00 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-07-20 |
Time |
15:00 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-09-27 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-09-27 |
Time |
17:23 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-09-25 |
Time |
14:14 |
Sent To |
|
|
Notes |
2018-09-26 14:15:09 | RESUB ROUTED TO JLEAHY |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-09-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-09-04 |
Time |
05:47 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-23 |
Time |
15:54 |
Sent To |
|
|
Notes |
2018-08-24 15:54:55 | **TRAVELLING WOTH 18070579** |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2018-09-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-09-04 |
Time |
05:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-09-04 |
Time |
05:29 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2018-07-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-28 |
Time |
03:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-28 |
Time |
03:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-08-28 |
|
|
Cont ID |
|
Sent By |
hmtribou |
Date |
2018-08-28 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
hmtribou |
Date |
2018-08-28 |
Time |
11:00 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-07-23 |
|
|
Cont ID |
|
Sent By |
hmtribou |
Date |
2018-07-23 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
hmtribou |
Date |
2018-07-23 |
Time |
10:23 |
Sent To |
P |
|
Notes |
|
|