Plan Review Details - Permit 18070812
Plan Review Stops For Permit 18070812
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-08-30 Cont ID  
Sent By rmcdouga Date 2018-08-30 Time 07:44 Rev Time 0.00
Received By rmcdouga Date 2018-08-30 Time 07:21 Sent To I
Notes
2018-08-30 07:44:55FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-07-30 Cont ID  
Sent By rmcdouga Date 2018-07-30 Time 19:40 Rev Time 0.00
Received By rmcdouga Date 2018-07-30 Time 19:40 Sent To I
Notes
2018-07-30 19:40:41PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE VALUATION OF THE POOL ON THE APPLICATION APPEARS
 TO BE LOW. SUBMIT A COPY OF THE SIGNED CONTRACT TO
 VERIFY THE VALUATION. FBC 109.3 BUILDING PERMIT
 VALUATION. FOR PERMITTING PURPOSES, VALUATION OF
 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE
 TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL,
 INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND
 DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT;
 EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY
 INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL
 CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT,
 MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE
 CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET
 BY THE BUILDING OFFICIAL.
  
 2) AN APPLICATION FOR THE POOL ELECTRICAL SUB-PERMIT IS
 REQUIRED TO BE SUBMITTED BEFORE THE POOL PERMIT CAN BE
 ISSUED.
  
 3) NOTE: FBC-R4501.19 FINAL INSPECTION. FINAL
 ELECTRICAL AND BARRIER CODE INSPECTION SHALL BE
 COMPLETED PRIOR TO FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-26 Cont ID  
Sent By jleahy Date 2018-07-26 Time 15:35 Rev Time 0.00
Received By jleahy Date 2018-07-26 Time 15:35 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-07-28 Cont ID  
Sent By tklarge Date 2018-07-28 Time 05:04 Rev Time 0.00
Received By tklarge Date 2018-07-28 Time 05:04 Sent To  
Notes
2018-07-28 05:04:56A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A
 CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE
 COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS
 WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-30 Cont ID  
Sent By rmcdouga Date 2018-08-30 Time 07:52 Rev Time 0.00
Received By rmcdouga Date 2018-08-21 Time 14:17 Sent To  
Notes
2018-08-22 14:17:25RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-30 Cont ID  
Sent By rmcdouga Date 2018-07-30 Time 19:40 Rev Time 0.00
Received By rmcdouga Date 2018-07-18 Time 14:19 Sent To  
Notes
2018-07-19 14:19:13ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-08-29 Cont ID  
Sent By tklarge Date 2018-08-29 Time 09:22 Rev Time 0.00
Received By tklarge Date 2018-08-29 Time 08:56 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-28 Cont ID  
Sent By tklarge Date 2018-07-28 Time 05:21 Rev Time 0.00
Received By tklarge Date 2018-07-28 Time 05:05 Sent To  
Notes
2018-07-28 05:08:171) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING
 SYSTEM INCLUDING THE FILTER.
  
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS.
  
 3) THE VALUE LISTED FOR THE POOL ON THE APPLICATION
 APPEARS LOW. SUBMIT A COPY OF A BONA FIDE SIGNED
 CONTRACT FOR THGIS WORK. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-24 Cont ID  
Sent By mcruz Date 2018-07-24 Time 15:18 Rev Time 0.00
Received By mcruz Date 2018-07-24 Time 15:17 Sent To  
Notes
***NONE***