Plan Review Details - Permit 18070646
Plan Review Stops For Permit 18070646
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-08-01 Cont ID  
Sent By rmcdouga Date 2018-08-01 Time 14:46 Rev Time 0.00
Received By rmcdouga Date 2018-08-01 Time 14:46 Sent To P
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-23 Cont ID  
Sent By rmcdouga Date 2018-07-23 Time 16:05 Rev Time 0.00
Received By rmcdouga Date 2018-07-23 Time 16:05 Sent To  
Notes
2018-07-23 16:09:52FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-08-01 Cont ID  
Sent By ppetty Date 2018-08-01 Time 11:18 Rev Time 0.00
Received By ppetty Date 2018-08-01 Time 11:22 Sent To B
Notes
2018-08-01 11:22:18B

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-25 Cont ID  
Sent By jleahy Date 2018-07-25 Time 15:49 Rev Time 0.00
Received By jleahy Date 2018-07-25 Time 15:49 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By rmcdouga Date 2018-07-23 Time 16:43 Rev Time 0.00
Received By rmcdouga Date 2018-07-23 Time 16:43 Sent To  
Notes
2018-07-23 16:44:16NO GAS IS SHOWN ON THE PLANS.

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By rmcdouga Date 2018-07-23 Time 16:46 Rev Time 0.00
Received By rmcdouga Date 2018-07-23 Time 16:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-08-09 Cont ID  
Sent By lcrespo Date 2018-08-09 Time 14:23 Rev Time 0.00
Received By lcrespo Date 2018-08-07 Time 13:44 Sent To  
Notes
2018-08-08 13:44:13RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-07 Cont ID  
Sent By tklarge Date 2018-08-07 Time 06:49 Rev Time 0.00
Received By tklarge Date 2018-07-30 Time 14:00 Sent To  
Notes
2018-07-31 14:00:32RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-25 Cont ID  
Sent By jleahy Date 2018-07-25 Time 15:51 Rev Time 0.00
Received By jleahy Date 2018-07-25 Time 15:51 Sent To  
Notes
2018-07-18 13:13:54ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-08-09 Cont ID  
Sent By lcrespo Date 2018-08-09 Time 14:23 Rev Time 0.00
Received By lcrespo Date 2018-08-09 Time 14:23 Sent To  
Notes
2018-08-09 14:24:1008/09/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-08-07 Cont ID  
Sent By tklarge Date 2018-08-07 Time 06:49 Rev Time 0.00
Received By tklarge Date 2018-08-07 Time 06:34 Sent To I
Notes
2018-08-07 06:49:34THE PLANS SHOW THAT THE TDH CALCULATIONS WERE DONE
 USING THE SIMPLIFIED TDH METHOD. THIS METHOD OF
 CALCULATING THE TDH IS NO LONGER PERRMITTED IN THE 2013
 EDITION OF APSP 7. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING
 SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER,
 FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT
 THE PUMP. SUBMIT REVISED TDH CALCULATIONS PEERR THE
 2013 APSP 7.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-23 Cont ID  
Sent By rmcdouga Date 2018-07-23 Time 16:10 Rev Time 0.00
Received By rmcdouga Date 2018-07-23 Time 16:10 Sent To E
Notes
2018-07-23 16:42:16PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY PLUMBING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION ADDRESSES
 FLOW RATE IN GALLONS PER MINUTE (GPM). IT REQUIRES THAT
 MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED THE LISTED
 MAXIMUM FLOW RATE OF THE SUCTION OUTLET FITTING
 ASSEMBLY (DRAIN COVER).
  
 2) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS
 APPLICABLE TO THE SPECIFIC PUMP BEING INSTALLED ON THIS
 SYSTEM. THIS IS REQUIRED TO MATCH THE CALCULATED TDH TO
 THE MAXIMUM SYSTEM FLOW RATE OF THE SYSTEM ON THE PUMP
 CURVE.
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-20 Cont ID  
Sent By mcruz Date 2018-07-20 Time 10:50 Rev Time 0.00
Received By tklarge Date 2018-08-07 Time 06:34 Sent To B
Notes
2018-08-07 06:34:45ENTERED BY MISTAKE. TKL.