Plan Review Details - Permit 18061460
Plan Review Stops For Permit 18061460
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-11 Cont ID  
Sent By rmcdouga Date 2018-07-11 Time 08:57 Rev Time 0.00
Received By rmcdouga Date 2018-07-11 Time 08:57 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-12 Cont ID  
Sent By fgiaquin Date 2018-07-12 Time 06:50 Rev Time 0.00
Received By fgiaquin Date 2018-07-12 Time 06:47 Sent To G
Notes
2018-07-12 06:51:50VALUE ADJUSTED TO 16500$

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-09-17 Cont ID  
Sent By tklarge Date 2018-09-17 Time 09:46 Rev Time 0.00
Received By tklarge Date 2018-09-17 Time 09:36 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-07-17 Cont ID  
Sent By lcrespo Date 2018-07-17 Time 07:21 Rev Time 0.00
Received By lcrespo Date 2018-07-17 Time 06:54 Sent To  
Notes
2018-07-17 07:21:0507/16/2018 GAS/LP/TANK REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. I HAVE RESEARCHED CITY RECORDS BACK TO 1996 AND
 THERE IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF
 AN LP TANK. SINCE THERE IS NO RECORD OF A PERMIT FOR
 THE LP TANK, THE TANK MUST BE INCLUDED IN THIS PERMIT
 FOR THIS SCOPE OF WORK. WPB AMENDMENTS TO THE FBC SEC.
 105.1.2.
  
 2. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER NFPA 58, TABLE 3-2.2.2.
  
 3. SHOW THE METHOD OF REQUIRED PROTECTION FOR THE LP
 TANK AND APPURTENANCES PER NFPA 58. IF THE TANK IS
 BELOW GROUND IT SHALL BE ANCHORED PER NFPA 58
 SEC.3-2.2.7 WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE.
 COMPLY WITH NFPA 58 SEC. 6.6.6.1.
  
 5. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER
 NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE
 MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS
 ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) & A
 NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE.
  
 6. THE TANK SHALL BE A MIN OF 10' FROM ANY SOURCE OF
 IGNITION ACCORDING TO NFPA TABLE 6.3.4.3 SEPARATION
 DISTANCE BETWEEN CONTAINER PRESSURE RELIEF VALVE AND
 BUILDING OPENINGS.
  
 7. THE LOCATION OF THE UNDERGROUND LP TANK SHALL COMPLY
 WITH TABLE 6.3.1 OF NFPA 58-11. SHOW THE DISTANCE OF
 THE LP TANK FROM THE EXTERIOR WALL OF THE STRUCTURE.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-17 Cont ID  
Sent By tklarge Date 2018-09-17 Time 09:47 Rev Time 0.00
Received By tklarge Date 2018-09-17 Time 09:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-17 Cont ID  
Sent By lcrespo Date 2018-07-17 Time 07:21 Rev Time 0.00
Received By lcrespo Date 2018-06-29 Time 15:04 Sent To  
Notes
2018-07-02 15:04:22ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-05 Cont ID  
Sent By mcruz Date 2018-07-05 Time 11:44 Rev Time 0.00
Received By mcruz Date 2018-07-05 Time 11:40 Sent To B
Notes
***NONE***