Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-11 Cont ID  
Sent By rmcdouga Date 2018-07-11 Time 08:29 Rev Time 0.00
Received By rmcdouga Date 2018-07-11 Time 07:59 Sent To  
Notes
2018-07-11 08:19:42FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-12 Cont ID  
Sent By fgiaquin Date 2018-07-12 Time 06:36 Rev Time 0.00
Received By fgiaquin Date 2018-07-12 Time 06:33 Sent To P
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-07-16 Cont ID  
Sent By tklarge Date 2018-07-16 Time 06:38 Rev Time 0.00
Received By tklarge Date 2018-07-16 Time 06:07 Sent To  
Notes
2018-07-16 06:39:13THERE IS NO GAS ASSOCIATED WITH THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status F Date 2018-07-24 Cont ID  
Sent By lcrespo Date 2018-07-24 Time 17:04 Rev Time 0.00
Received By lcrespo Date 2018-07-23 Time 15:10 Sent To  
Notes
2018-07-24 15:10:22RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-16 Cont ID  
Sent By tklarge Date 2018-07-16 Time 06:41 Rev Time 0.00
Received By tklarge Date 2018-06-28 Time 16:34 Sent To  
Notes
2018-06-28 16:34:50ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-24 Cont ID  
Sent By lcrespo Date 2018-07-24 Time 17:04 Rev Time 0.00
Received By lcrespo Date 2018-07-24 Time 17:04 Sent To  
Notes
2018-07-24 17:09:5107/24/18 APPROVED BY PLUMBING AND SENT TO PROCESSING,
 LAC

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-16 Cont ID  
Sent By tklarge Date 2018-07-16 Time 06:41 Rev Time 0.00
Received By tklarge Date 2018-07-16 Time 06:07 Sent To I
Notes
2018-07-16 06:41:21TOTAL DYNAMIC HEAD CALCULATIONS
  
 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).
  
 2) SUBMIT TWO COPIES OF THE POOL PUMP CURVE. IDENTIFY
 ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO THE
 PUMP BEING INSTALLED ON THIS POOL. THIS IS NEEDED TO
 CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-03 Cont ID  
Sent By mcruz Date 2018-07-03 Time 11:29 Rev Time 0.00
Received By mcruz Date 2018-07-03 Time 11:21 Sent To B
Notes
***NONE***