Plan Review Details - Permit 18061388
Plan Review Stops For Permit 18061388 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-07-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-11 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-11 |
Time |
07:59 |
Sent To |
|
|
Notes |
2018-07-11 08:19:42 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | FILLING THE POOL WITH WATER. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-07-12 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2018-07-12 |
Time |
06:36 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2018-07-12 |
Time |
06:33 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2018-07-16 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-16 |
Time |
06:38 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-16 |
Time |
06:07 |
Sent To |
|
|
Notes |
2018-07-16 06:39:13 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
F |
Date |
2018-07-24 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2018-07-24 |
Time |
17:04 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2018-07-23 |
Time |
15:10 |
Sent To |
|
|
Notes |
2018-07-24 15:10:22 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-16 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-16 |
Time |
06:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-06-28 |
Time |
16:34 |
Sent To |
|
|
Notes |
2018-06-28 16:34:50 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2018-07-24 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2018-07-24 |
Time |
17:04 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2018-07-24 |
Time |
17:04 |
Sent To |
|
|
Notes |
2018-07-24 17:09:51 | 07/24/18 APPROVED BY PLUMBING AND SENT TO PROCESSING, | | LAC |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-07-16 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-16 |
Time |
06:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-16 |
Time |
06:07 |
Sent To |
I |
|
Notes |
2018-07-16 06:41:21 | TOTAL DYNAMIC HEAD CALCULATIONS | | | | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | FITTING ASSEMBLY (DRAIN COVER). | | | | 2) SUBMIT TWO COPIES OF THE POOL PUMP CURVE. IDENTIFY | | ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO THE | | PUMP BEING INSTALLED ON THIS POOL. THIS IS NEEDED TO | | CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | CALCULATIONS. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-07-03 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-07-03 |
Time |
11:29 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-03 |
Time |
11:21 |
Sent To |
B |
|
Notes |
|
|
|