Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-08-01 Cont ID  
Sent By lcrespo Date 2018-08-01 Time 18:23 Rev Time 0.00
Received By lcrespo Date 2018-08-01 Time 18:23 Sent To  
Notes
2018-08-01 18:25:0908/01/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING/GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-07-30 Cont ID  
Sent By lcrespo Date 2018-07-30 Time 07:28 Rev Time 0.00
Received By lcrespo Date 2018-07-30 Time 07:28 Sent To  
Notes
2018-07-30 07:27:1707/29/2018 1ST PLUMBING/GAS REVIEW **DENIED** WITH
 COMMENTS.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SECOND REQUEST, SUBMIT MANUFACTURES SPECIFICATIONS
 FOR THE GENERATOR AND MANUFACTURER'S SPECIFICATIONS FOR
 THE GENERATOR SHALL BE ONSITE FOR FINAL GAS INSPECTION.
 THE GENERATOR SHALL BE LISTED AND APPROVED. NFPA 58
 SEC. 5.20.1. THE GENERATOR SHALL MEET THE REQUIREMENTS
 OF UL 2200. 2017 FBC FUEL GAS SEC.305.1.
 2. SECOND REQUEST, SUBMIT TWO COPIES OF THE SIZING
 TABLE AFTER PE THAT IS USED IN THE DESIGN FOR THE GAS
 SYSTEM OR PLACE A NOTE ON BOTH SETS OF PLANS LISTING
 THE SIZING TABLES FROM GAS CODES OR ANOTHER STANDARD
 THAT WERE USED IN THE DESIGN OF THIS SYSTEM, THE ONE
 SUMMITED ARE NOT PE2017 FBC FUEL GAS SEC. 402.3.
  
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-29 Cont ID  
Sent By lcrespo Date 2018-06-29 Time 14:49 Rev Time 0.00
Received By lcrespo Date 2018-06-29 Time 14:49 Sent To  
Notes
2018-06-29 14:52:1006/29/2018 1ST PLUMBING/GAS REVIEW **DENIED** WITH
 COMMENTS.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT MANUFACTURES SPECIFICATIONS FOR THE GENERATOR
 AND MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR
 SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR
 SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE
 GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200. 2017
 FBC FUEL GAS SEC.305.1.
 2. IS THE EXISTING STEAM GENERATOR THE ONLY APPLIANCE
 ON THIS SYSTEM? WPB AMENDMENTS TO FBC SEC.107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 3. A SET OF PLANS HAS BEEN SUBMITTED THAT IS DRAWN IN
 PENCIL. PLANS DONE IN PENCIL ARE UNACCEPTABLE AS THE
 DRAWING CAN BE MODIFIED/CHANGED. I HAVE VOIDED IT AND
 MADE A COPY AND PUT IT WITH THE OTHER SET. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1.4 QUALITY OF
 BUILDING PLANS.
 4. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. IF INSIDE THE GENERATOR PLEASE CLARIFY.
 2017 FBC FUEL GAS SEC.410.1.
 5. SUBMIT TWO COPIES OF THE SIZING TABLE AFTER PE THAT
 IS USED IN THE DESIGN FOR THE GAS SYSTEM OR PLACE A
 NOTE ON BOTH SETS OF PLANS LISTING THE SIZING TABLES
 FROM GAS CODES OR ANOTHER STANDARD THAT WERE USED IN
 THE DESIGN OF THIS SYSTEM, 2017 FBC FUEL GAS SEC.
 402.3.
 6. SHOW SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR AND GENERATOR, PLEASE SHOW
 ON LAYOUT DESIGN, 2017 FBC FUEL GAS SEC. 409.4.
 7. IS THE NEW GENERATOR GOING TO THE EXISTING LOCATION
 AND WILL IT COMPLY WITH NFPA 37, SECTION 4.1.4, ENGINES
 LOCATED OUTDOORS OR MANUFACTURES SPECIFICATION, PLEASE
 SHOW ON DRAWINGS IF APPLICABLE?
 8. THE IS AN APPLICATION FOR A 75 KW AND THE PLANS LIST
 AN 80 KW, I ALSO SAW A TOWER GENERATOR UNDER THIS
 ADDRESS, PLEASE CLARIFY. WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-08-01 Cont ID  
Sent By lcrespo Date 2018-08-01 Time 18:23 Rev Time 0.00
Received By lcrespo Date 2018-07-31 Time 14:29 Sent To  
Notes
2018-08-01 14:29:20RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-30 Cont ID  
Sent By lcrespo Date 2018-07-30 Time 07:28 Rev Time 0.00
Received By lcrespo Date 2018-07-20 Time 14:35 Sent To  
Notes
2018-07-23 14:36:01RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-29 Cont ID  
Sent By lcrespo Date 2018-06-29 Time 14:50 Rev Time 0.00
Received By lcrespo Date 2018-06-27 Time 13:01 Sent To  
Notes
2018-06-28 13:01:37PLUMB <5K


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved