|
 |
 |
 |
 |
 |
Plan Review Details - Permit 18061198
Plan Review Stops For Permit 18061198 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2018-07-13 |
|
|
Cont ID |
|
Sent By |
hhall |
Date |
2018-07-13 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
hhall |
Date |
2018-07-13 |
Time |
10:34 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2018-06-26 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-06-26 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-06-26 |
Time |
15:09 |
Sent To |
Z |
|
Notes |
2018-06-26 15:10:23 | SENT TO DMP FOR ZONING REVIEW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-08-02 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2018-08-02 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2018-07-16 |
Time |
13:41 |
Sent To |
|
|
Notes |
2018-07-17 13:41:27 | RESUB ROUTED TO ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-13 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2018-07-13 |
Time |
13:06 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2018-06-25 |
Time |
12:42 |
Sent To |
|
|
Notes |
2018-07-12 10:52:36 | SENT TO LAURA MARCHANT FROM ZONING 7/12 | 2018-06-26 12:42:44 | ROUTED TO HISTORIC INBOX |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-08-02 |
|
|
Cont ID |
|
Sent By |
elevesqu |
Date |
2018-08-02 |
Time |
11:36 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2018-08-02 |
Time |
11:36 |
Sent To |
|
|
Notes |
2018-08-02 11:36:41 | PROVISO: ADDITIONAL LANDSCAPE MATERIAL TO BE INSTALLED | | ALONG PARKING LOT PERIMETER AS DISCUSSED. | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2018-07-12 |
|
|
Cont ID |
|
Sent By |
elevesqu |
Date |
2018-07-12 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2018-07-10 |
Time |
12:10 |
Sent To |
ENG |
|
Notes |
2018-07-12 10:52:14 | PAVEMENT EXPANSION MUST MEET MINIMUM SETBACK FOR | | DISTRICT, 15'. PLEASE PROVIDE DIMENSIONS FROM PROPERTY | | LINE TO EDGE OF FIRST PARKING SPACE. | | | | PLEASE PROVIDE STRIPING DETAIL FOR PARKING SPACES. | | STANDARD SPACES ARE REQUIRED TO BE 8'6" WIDE AND 18' | | LONG. | | PLEASE PROVIDE DIMENSION OF DRIVE AISLE BEHIND PARKING | | SPACES. PER SECTION 94-485, A 24' DRIVE AISLE IS | | REQUIRED FOR TWO-DIRECTIONAL MOVEMENT | | | | A 5' LANDSCAPE BUFFER IS REQUIRED ON THE WEST, SOUTH, | | AND EAST SIDE OF THE PARKING LOT PER SECTION 94-113. | | SHADE TREES SHALL BE PLANTED AT 30-FOOT INTERVALS. | | | | PLEASE PROVIDE IMAGES OF THE EXISTING LANDSCAPING ALONG | | THE PROPERTY'S SOUTHERN BORDER WITH RESUBMITTAL. | | | | PLEASE CALL LIZ LEVESQUE, URBAN DESIGN PLANNER AT 561 | | 822 1426 WITH ANY QUESTIONS. | | | | | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |