Plan Review Stops For Permit 18061146 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-07-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-05 |
Time |
17:54 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-05 |
Time |
17:46 |
Sent To |
|
|
Notes |
2018-07-05 17:54:52 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | FILLING THE POOL WITH WATER. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-06-28 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-06-28 |
Time |
15:47 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-06-28 |
Time |
15:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
N |
Date |
2018-07-17 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-07-17 |
Time |
12:35 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-07-17 |
Time |
12:35 |
Sent To |
|
|
Notes |
2018-07-17 12:35:39 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE | | ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC | | SEC. 107.2.1. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2018-06-30 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-06-30 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-06-30 |
Time |
12:02 |
Sent To |
|
|
Notes |
2018-06-30 12:04:50 | 06/30/2018 1ST GAS REVIEW**DENIED** | | | | 1) NO GAS PLAN PROVIDED. MANUAL FOR GAS HEATER DOES NOT | | LIST MODEL OF UNIT.SUBMIT MANUFACTURER?S SPECIFICATION | | SHEETS / INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO | | VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1 | | | | | | TIM HUNT | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | 561-805-6695 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-07-17 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-07-17 |
Time |
12:35 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-07-10 |
Time |
10:02 |
Sent To |
I |
|
Notes |
2018-07-12 10:02:49 | RESUB ROUTED TO THUNT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-05 |
Time |
17:54 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-06-25 |
Time |
11:39 |
Sent To |
|
|
Notes |
2018-06-26 11:39:33 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2018-07-17 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-07-17 |
Time |
12:35 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-07-17 |
Time |
12:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-06-30 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-06-30 |
Time |
12:08 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-06-30 |
Time |
12:08 |
Sent To |
B |
|
Notes |
2018-06-30 12:11:28 | 06/30/2018 PLUMBING 1ST REVIEW**DENIED** | | | | 1) MUST SHOW (TDH) TOTAL DYNAMIC HEAD ON HOW THE | | COMPLETE PIPING SYSTEM WAS SIZED. ANSI/ APSP 7, 15 | | | | 2) PROVIDE MANUFACTURE MAIN DRAIN SPEC'S SHOWING FLOW | | RATE AND THAT IT COMPLIES WITH VGB. FBC 107.2.1 | | | | 3) APPLICATION IS CALLING OUT FOR A HEAT PUMP POOL | | HEATER BUT MANUFACTURE MANUAL PROVIDED IS FOR A GAS | | POOL HEATER. PLEASE CLARIFY. PROVIDE A COMPLETE GAS | | PLAN AND SEPERATE PERMIT APPLICATION IF IN FACT THE | | UNIT IS GOING TO BE GAS. | | | | TIM HUNT | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | 561-805-6695 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-06-27 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-06-27 |
Time |
12:13 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-06-27 |
Time |
12:13 |
Sent To |
|
|
Notes |
2018-06-27 12:14:11 | ZONING PASSED WITH PROVISO: POOL EQUIMENT SHALL BE AT | | LEAST 1' FROM WEST PROPERTY LINE. | | | | MAGGIE CRUZ | | ASSOCIATE PLANNER | | PLANNING AND ZONING DEPARTMENT | | TEL: 561-822-1442 | | E-MAIL: [email protected] |
|
|