Plan Review Details - Permit 18061025
Plan Review Stops For Permit 18061025
Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 13:32 Rev Time 0.00
Received By tklarge Date 2018-06-29 Time 13:32 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-06 Cont ID  
Sent By thunt Date 2018-07-06 Time 07:47 Rev Time 0.00
Received By thunt Date 2018-07-02 Time 14:40 Sent To I
Notes
2018-07-03 14:40:13RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 13:33 Rev Time 0.00
Received By tklarge Date 2018-06-21 Time 09:51 Sent To  
Notes
2018-06-22 09:51:54PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-06 Cont ID  
Sent By thunt Date 2018-07-06 Time 07:47 Rev Time 0.00
Received By lmarchan Date 2018-07-06 Time 07:47 Sent To  
Notes
2018-07-06 10:42:07APPROVED PER THUNT

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 13:32 Rev Time 0.00
Received By tklarge Date 2018-06-29 Time 08:16 Sent To  
Notes
2018-06-29 13:31:571) SUBMIT CALCULATIONS FOR THE SIZING OF THE GREASE
 TRAP. 2017 FBC-PLUMBING SEC. 1003.2.
 2) SHOW THE TYPE OF FIXTURES ON THE SANITARY RISER THAT
 WILL BE DISCHARGING INTO THE INTERCEPTOR.
 3) SHOW THE SIZE OF INLET AND OUTLET OF THE GREASE TRAP
 ON THE PLANS.
 4) A COPY OF THE INTERCEPTOR INSTALLATION SHALL BE ON
 THE JOBSITE AT ROUGH PLUMBING INSPECTION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved