Plan Review Details - Permit 18060665
Plan Review Stops For Permit 18060665
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-06-22 Cont ID  
Sent By rmcdouga Date 2018-06-22 Time 18:33 Rev Time 0.00
Received By rmcdouga Date 2018-06-22 Time 18:33 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-06-20 Cont ID  
Sent By jleahy Date 2018-06-20 Time 19:43 Rev Time 0.00
Received By jleahy Date 2018-06-20 Time 19:43 Sent To G
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-08-15 Cont ID  
Sent By lcrespo Date 2018-08-15 Time 07:09 Rev Time 0.00
Received By lcrespo Date 2018-08-15 Time 06:34 Sent To  
Notes
2018-08-15 07:31:4508/15/18 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-29 Cont ID  
Sent By tklarge Date 2018-06-29 Time 06:11 Rev Time 0.00
Received By tklarge Date 2018-06-29 Time 05:58 Sent To  
Notes
2018-06-28 11:17:231) THE CALCULATIONS FOR THE PROPANE TANK ANCHORAGE FROM
 TIE DOWN ENGINEERING ARE REQUIRED TO BE SIGNED AND
 SEALED BY AN ENGINEER LICENSED IN THE STATE OF FLORIDA
 PER FL. STATUTE 471.025, 471.003, 471.005, & FL. ADMIN.
 CODE RULE 61G15-23.001. THE DOCUMENTS ARE ADVERTISING
 AS "ENGINEERING".
 61G15-23.001 SIGNATURE, DATE AND SEAL SHALL BE AFFIXED.
 (1) A PROFESSIONAL ENGINEER SHALL SIGN, DATE AND SEAL:
 (A) ALL FINAL PLANS, PRINTS, SPECIFICATIONS, REPORTS,
 OR OTHER DOCUMENTS PREPARED OR ISSUED BY THE LICENSEE
 AND BEING FILED FOR PUBLIC RECORD;
 2) SHOW THE LOCATION OF ALL PRESSURE REGULATORS.A
 SHUTOFF VALVE IS REQUIRED UPSTREAM OF EACH
 REGULATOR.2017 FBC-GAS VOLUME SEC.409.4.
 3) SUBMIT THE SIZING TABLE FOR THE LOW PRESSURE SYSTEM.
 2017 FBC-FUEL GAS SEC.402.3.
 4) INDICATE THE TYPE AND SIZE OF THE PIPE FROM THE LP
 TANK TO THE CONNECTION WITH THE PE PIPE.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-15 Cont ID  
Sent By lcrespo Date 2018-08-15 Time 07:09 Rev Time 0.00
Received By lcrespo Date 2018-08-13 Time 15:56 Sent To  
Notes
2018-08-14 15:57:04RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-29 Cont ID  
Sent By jleahy Date 2018-06-29 Time 16:40 Rev Time 0.00
Received By jleahy Date 2018-06-14 Time 09:10 Sent To  
Notes
2018-06-18 09:10:49ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-06-20 Cont ID  
Sent By mcruz Date 2018-06-20 Time 09:34 Rev Time 0.00
Received By mcruz Date 2018-06-20 Time 09:27 Sent To B
Notes
2018-06-20 09:35:49ZONING PASSED WITH PROVISO: GENERATOR SHALL BE AT LEAST
 8.5' FROM EAST SIDE PROPERTY LINE.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  